Client: Mel-Ry Constuction v 1
�� ���$�'�����'�' Date: - April 12, 2013
Address: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 13-1062/261
Project: Proposed Residence Lot 200 Permit #:
Address: 10725 S. Ocean Drive, Jensen Beach, FL Tech: SJ
Area Tested: Footings I Compaction Req.: 95%
Material Type: Pale Brown Sand w/Shell Frags Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
p
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NE Comer of Footings
j 12"
BOF
9.3
106.5
108.9
12.1
97.8%
Yes
2
SW Comer of Footings
12"
BOF
8.6
107.3
108.9
12.1
98.5%
Yes
3
SE Corner of Footings
112"
BOF
8.5
107.1
108.9
12.1
98.3%
Yes
4
5
6
7
8
9
10
11
12
13
i
14
15
Remarks: See Reverse For Disclaimer o♦��1�1N.L�� 4�0
Legend for Elevation: ♦,`� �`GENSF• .
PR = Proofroll 7 2,3 = 9st, 2nd, 3rd Liftl1fPlter�6y893
SL = Springline FL = Final Lift 3t ITN LEA I
SG = Subgrade BG =Below Grade Profe�Ssiod$rjineer #59394/'T/
BC = Basecourse BOF =Bottom of Footing ':sr,'00p01 a tion #5471
TOP =Top of Pipe FG =Finished Grade �j0�(••,F a
As a mutual protection to clients, the public and ourselfs, all reporls are submitted as the confidential p 1 �horizaUon for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written aproval. A density test 4111MI lie degree of compaction of the tested layer of material
only. A density does not replace a soil bearing capacity determination. Aftei laying dormant for a period of 90 days or after heavy rainstorms, retesting must be performed on
this work.
i Phone 9.%-784-2941:4
\
80048-1919 edetal,l
Fax 954784-7875
& TESTING INC. I www.fed-eng.com
250 SW 13th Ave Pompano Beach, FL 33069
i
Client: Mel-Ry Constuction
Address: 10967 S. Ocean
Project:
Address
Date: April 12, 2013
Jensen Beach, FL 34957 Order #: 13-1062/261
Proposed Residence Lot 206 Permit #:
Area Tested: Footi
Material Type: Pale Brown Sand w/Shell Frags
I
Compaction Req.: 95%
Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NE Corner of Footings
12"
BOF
9.3
106.5
108.9
12.1
97.8%
Yes
2
1 SW Corner of Footings
1
1!2"
1 BOF
8.6
1 107.3
108.9
12.1
98.5%
Yes
3
SE Corner of Footings
1,2"
BOF
. 8.5
107.1
108.9
12.1
98.3%
Yes
4
i
5
I
6
7
8
9
10
I
11
12
13
i
14
15
Remarks: See Reverse For Disclaimer .,r IVE ,
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift
SL = Springline FL = Final Lift
SG = Subgrade BG = Below Grade
Submitted by:
KEITH LEBLANC
Professional Engineer#59394 �/r �
BC = Basecourse BOF = Bottom of Footing Cert. of Authorization #5471
TOP = Top of Pipe FG = Finished Grade I State of Florida
As a mutual protection to clients, the public and ourselfs, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written aproval. A density test determines the degree of compaction of the tested layer of material
only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on
this work. I
Pursuant to your request, Federal Engineering & Testing, Inc has perfonned a
compaction test at the referenced project on the reverse side. The purpose of our test was
to determine the degree of compaction of the tested layer of material only. In no way
shall a compaction test replace a soil bearing capacity detennination. A soil boring test
must be performed by client prior to construction to verify subsoil conditions.
Environmental analysis. of the soil materials is not part- of the scope of services. If
environmental analysis of the soils is required, we can provide a proposal for performing
an environmental analysis of the soil materials. The scope of services is for determination
of the degree of compaction of the tested layer of material only. No other analysis is
implied or warranted.
Job project specifications were not , available at the time the work was perfonned.
Determination of the pass/fail compaction results are based on current common industry
requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of
the AASHTO T-180 standard for paved areas such as roadways and parking lots. If
different specifications are required, Federal Engineering & Testing, Inc shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied
upon to represent conditions on other areas or dates. Any subsequent site disturbances
due to water erosion, rain, construction activities, excavations, overgrown, vegetation,
traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are
the confidential property of clients and authorization for use, publication of statements,
conclusions or extracts from or regarding our reports is reserved pending written
approval.
It has been a pleasure working with you and look forward to do so in the near future.
��ail
�..
r Phone 954-784-2941
L4 e r
all
800-848-1919
Fax 954.784-7875
& TESTING INC. www.fed-eng.com
250 SW 13th Ave Pompano Beach, FL 33069 j
13oS� 0 I -7 �F
Client: Mel-Ry Constuction Date: August 28, 2013
Address: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 13-2356/577
Project:
Address: 10851 S.
Area Tested:
Residence Lot 108
ocean Drive, Jensen BeE
Pad
Material Type: Pale Brown Sand w/Shell Frags!
I
FL
Permit #:
Tech: SJ
Compaction Req.: 95%
Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
oho
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NW Corner of Pad
12"
FG
8.2
106.5
107.7
12.1
98.9%
Yes
2
1 NE Comer of Pad
12
FG
1 7.7
107.9
107.7
12.1
100.2%
Yes
3
SE Corner of Pad
I
12'1'
FG
7.9
107.3
107.7
12.1
99.6%
Yes
4
I
5
6
I
7
8
I
9
10
11
12
13
1
14
^�
15
Remarks: See Reverse For Disclaimer Test Performed Only On Top 12" Of Pad Not A Verification OfSoil_B,i
Legend for Elevation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = Springline FL = Final Lift RECE/V , KEITH LEBLANC
ED'Np
SG = Subgrade BG = Below Grade V 06 ?013 Professional Engineer-#5,9394 `
BC = Basecourse BOF = Bottom of Footing Cert. of Authorization #5471
TOP = Top of Pipe FG = Finished Grade State of Fiofida
As a mutual protection to clients, the public and ourselfs, all reports are submitted as the confidential property of clients, and aothorizat on for publication of.statements,
conclusions or extracts from or regarding our reports is reserved pending our written aproval. A density test determines the degree of comp"'at tiorrof the tested layer of material
only. A density does not replace a soil bearing capacity determination. After layi g dormant for a period of 90 days or after heavy rain/storrns, retasting must be performed on
this work.
Pursuant to your request, Federal Engineering & Testing, Inc has performed a
compaction test at the referenced project on the reverse side. The purpose of our test was
to determine the degree of compaction of the tested layer of material only. In no way
shall a compaction test replace a soil bearing capacity determination. A soil boring test
must be performed by client prior to construction to verify subsoil conditions.
Environmental: analysis. of the soil .materials...is,not part of, the scope of services. If
environmental analysis of the soils is required, we can provide a proposal for performing
an environmental analysis of the soil materials. The scope of services is for determination
of the degree of compaction of the tested layer of material only. No other analysis is
implied or warranted.
Job project specifications were not available at the time the work was performed.
Determination of the pass/fail compaction results are based on current common industry
requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of
the AASHTO T-180 standard for paved areas such as roadways and parking lots. If
different specifications are required, Federal Engineering & Testing, Inc shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied
upon to represent conditions on other areas or dates. Any subsequent site disturbances
due to water erosion, rain, construction activities, excavations, overgrown, vegetation,
traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are
the confidential property of clients and authorization for use, publication of statements,
conclusions or extracts from or regarding our reports is reserved pending written
approval.
It has been a pleasure working with you and look forward to do so in the near future.
Fro, 13:36 -#791 P.0014001
,. Phone 954-784-2941
edereal
J_ 800, 843-1919
�Fax 954.784.7875
iHSTta1G 1MG. I www.fed-eng.corn
260 saw 1M An Pampane Beanh, Ft 33M
I
Client: Met -ay Clonstuction Date: Aril 12, 2013
Address: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #_ 13-10621261
Project: Proposed Residence Lot 200 Permit M
I .
5 S. Ocean Drive, , Tech: SJ Jensen BeachFL
Address, 1t)7Z ,,,...,.,
Area Tested: Footfn S Compaction Req, 95%
Material Type: Pale Brown Sand w/Shell Eras Praetor Method. ASTM D-1657
I
Test
#
TEST LOCATION
Probe
Elev_
Moist
per
Density
roctor
Value
optimum
Moisture
Compaction
Pass
ti t
PCF
PCF
%
1
NE Comer of Footles
12"
BOF
9.3
106.5
108.9
12.1
97.8%
Yes
2
SW Corner of Footings
12"
80F
8.6
107.3
108.9
12.1
1 98-5%
Yes
i
3
Sir Comer of Fobtin s
12"
BOF
8_15
107.1
108.9
12.1
983%
Yes
4
5
6
7
8
9
10
11
12
I
13
t14
Remarks: See Reverse For Disclaimer��i� lL�
Legend for Elevation:'
PR;-- Proofrolf 1,2.3
AV� �;�
=1st, end, 3rd l.lit
3}. 3prtnSEtrle FL = Final Lift
SO := Subgrade SG Below Grade
; ITN LEB
"x,
BC = saseouurse BOF = Bottom of Footing
sio irreer#1b939A / 1
� �� STD Qf � lion #5471
TOP = Top of Pipe FG = Finished Graoe
G '•.�' t$ a
`(,
Ae a mutual proteerion to cliemo, the pvbltc and ourseft. ad reports are submitted o6 the cor&wdential p zoom for pubmawn orswement6.
wridusloft or extw% from or regarding our rpporta is reserved pe lidOg our written eprowl. A dons +tY testown 009ft of wm pacdton of the tesmd Iayar of matanat
ordy. A damity does not roplace a soil bearing eepacity determination. ABsr laying
thle work.
dormant far a p¢rtpd of $0 days or after heavy ralydstornts. retesting mgst be performed on