HomeMy WebLinkAbout1203-0230- PROJECT SUMMARYShort Desc: American Legion
Owner: American Legion
Addressl: Savanah Club Blvd
Address2:
PROJECT SUMMARY
Description: American Legion
City:
State:
Zip:
Type: Dining: Bar Lounge/Leisure Class:
Jurisdiction: PORT ST LUCIE, ST LUCIE COUNTY, FL (661200)
Conditioned Area: 6077 SF Conditioned & UnConditioned Area:
No of Stories: 1 Area entered from Plans
Permit No: 0 Max Tonnage
If different, write in:
i
Port St. Lucie
FL
0
New Finished building
6077 SF
0 SF
27.5
♦`�,tilt A1998;"9'F®I
♦ .si. V O
e4°�i� ;••° G E �c' �`� o�A�
v a
►�! 82
b�•
° STATE OF
AUG 0 g 2012
Public Works
St. Fla/Com-2008, Effective: March 1, 2009
5/10/2012
Page I of'7
Sumlm
Component
Gross Energy Cost (in $)
LIGHTING CONTROLS
EXTERNAL LIGHTING
HVAC SYSTEM
PLANT
WATER HEATING SYSTEMS
PIPING SYSTEMS
Met all required compliance from Check List?
Design Criteria Result
6,440.0 6,674.0 PASSED
PASSES
PASSES
PASSES
None Entered
PASSES
None Entered
Yes/No/NA
IMPORTANT MESSAGE
Info 5009 -- -- -- An input report of this design building must be submitted along with this
Compliance Report
EnergyGauge Summit@ Fla/Com-2008. Effective: March 1, 2009
5/10/2012 Page 2 of 7
CERTIFICATIONS
I hereby certify that the plans and specifications covered by this calculation are in compliance with the
Florida Energy Code
Prepared By: Eric J. S boda, PE Building Official:
Date: Date: -
I certify that this building is in compliance with the FLorida Energy Efficiency Code
Owner Agent: Date:
If Required by Florida law, I hereby certify (') that the system design is in compliance with the Florida Energy
Efficiency Code
Architect:
Reg No:
Electrical Designer:
Reg No:
Lighting Designer:
Reg No: _
Mechanical Designer:
Reg No: _
Plumbing Designer:
Reg No:
(') Signature is required where Florida Law requires design
to be performed by registered design
professionals.
Energy66Uge Summit® Fta/Com-200p, Effective: March 1, 2009
5/10/2012 Page 3 of 7
Project: American Legion
Title: American Legion
Type: Dining: Bar Lounge/Leisure
(WEA File: FL ST LUCIE CO INTL.tm3)
Building End Uses
1) Proposed
2) Baseline
Total
401.90
490.80
$6,440
$7,851
ELECTRICITY(MBtulkWhl$)
401.90
490.80
117728
143795
$6,440
$7,851
AREA LIGHTS
73.20
76.20
21437
22332
$1,173
$1,219
MISC EQUIPMT
60.80
60.80
17807
17807
$974
$972
PUMPS & MISC
0.10
0.10
26
28
$1
$2
SPACE COOL
180.60
243.10
52905
71233
$2,894
$3,889
SPACE HEAT
33.80
0.00
9903
0
$542
$0
VENT FANS
53.40
110.60
15650
32395
$856
$1,769
Passing requires Proposed Building cost to be at most 85%
PASSES
of Baseline cost. This Proposed Building is at 82%
EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
5/10/2012 Page 4 of 7
Project: American Legion
Title: American Legion
Type: Dining: Bar Lounge/Leisure
(WEA File: FL ST LUCIE CO INTLAW)
External Lighting Compliance
Description Category Tradable? Allowance
Area or Length ELPA CLP
(W/Unit)
or No. of Units (W) (W)
(Sgft or ft)
Ext Light 1 Uncovered Parking Areas -- Yes 0.15
42,500.0 6,375 2,000
Parking lots and Drives
Tradable Surfaces: 2000 (W) Allowance for Tradable: 6693.75 (W)
PASSES
All External Lighting: 2000 (W)
Complicance check includes a excess/Base allowance of 318.75(W)
Project: American Legion
Title: American Legion
Type: Dining: Bar Lounge/Leisure
(WEA File: FL ST LUCIE CO INTLAW)
Lighting Controls Compliance
Acronym Ashrae Description Area
Design Min Compli-
ID (sq-ft)
CP CP ance .
PrOZoISp1 9 Food Service - Bar/Lounge 6,077
10 3 PASSES
PASSES
Project: American Legion
Title: American Legion
Type: Dining: Bar Lounge/Leisure
(WEA File: FL ST LUCIE CO INTL tm3)
System Report Compliance
PrOSyl System I
Constant Volume Packaged
No. of Units
System
I
Component Category
Capacity Design Eff Design
IPLV Comp-
Eff Criteria IPLV
Criteria liance
Cooling System Air Conditioners Air Cooled
13.00 9.50 9.80
9.70 PASSES
240000 to 760000 Btu/h
Cooling Capacity
Heating System Electric Furnace
1.00 1.00
PASSES
Air Handling Air Handler (Supply) -
0.46 0.90
PASSES
System -Supply Constant Volume
Air Distribution ADS System
6.00 3.50
PASSES
System (Sup)
PASSES
EnergyGauge Summit@ Fla/Com-2008. Effective; March 1, 2009
5/10/2012 Page 5 of 7
Plant Compliance
Description Installed Size Design Min Design Min Category
No Eff Eff IPLV IPLV
Comp
liance
None
Project: American Legion
Title: American Legion
Type: Dining: Bar Lounge/Leisure
(WEB File: F7 ST Li CIE CO INTL.tm3)
Water Heater Compliance
Description Type
Design Min
Category Eff Eff
Design
Loss
Max Comp
Loss liance
Water Heater 1 Gas Storage water
heater
>75000 & 0.80 0.80
<=155000 Btu/h; <
4000 (Btu/h)/gal
978.28 PASSES
PASSES
Piping System Compliance
Category
Pipe Dia Is Operating Ins Cond
[inches] Runout? Temp [Btu-in/hr
[F] SF.F]
Ins
Thick [in]
Req Ins Compliance
Thick linj
None
EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
5/10/2012 Wage 6 0l' 7
Project: American Legion
Title: American Legion
Type: Dining: Bar Lounge/Leisure
(WEA File: FL_ST LUC1E_CQ INTL.tm3)
Other Required Compliance
Category Section
Requirement (write N/A in box if not applicable)
Check
Report 13-101
Input Report Print -Out from EnergyGauge FlaCom attachedEl
Operations Manual 13-102.1,
Operations manual provided to owner
13-410, 13-413
Windows & Doors 13-406.AB. 1. 1
Glazed swinging entrance & revolving doors: max. 1.0 cfm/ft=; all
other products: 0.4 cfm/ft2
Joints/Cracks 13-406.AB.1.2
To be caulked, gasketed, weather-stripped or otherwise sealed
Dropped Ceiling Cavity 13-406.AB.3
Vented: seal & insulated ceiling. Unvented seal & insulate roof &
side walls
System 13-407
HVAC Load sizing has been performed
Reheat 13-407.13
Electric resistance reheat prohibited
HVAC Efficiency 13-407, 13-408
Minimum efficiences: Cooling Tables 13-407.AB.3.2.1A-D;
Heating Tables 13-407.AB.3.2. I B, 13-407.AB.3.2.1 D,
13-408.AB.3.2.1E, 13-408.AB.3.2F
HVAC Controls 13-407.AB.2
Zone controls prevent reheat (exceptions); simultaneous heating
and cooling in each zone; combined HAC deadband of at least 5°F
(exceptions)
Ventilation Controls 13-409.AB.3
Motorized dampers reqd, except gravity dampers OK in: 1) exhaust
systems and 2) systems with design outside air intake or exhaust
capacity<_300 cfin
ADS 13-410
Duct sizing and Design have been performed
HVAC Ducts 13-410.AB
Air ducts, fittings, mechanical equipment & plenum chambers shall
be mechanically attached, sealed, insulated & installed per Sec.
13-410 Air Distribution Systems
Balancing 13-410.AB.4
HVAC distribution system(s) tested & balanced. Report in
construction documents
LAB.2
El
Insulation 13-41 LAB
In accordance with Table 13-41
Water Heaters 13-412.AB
Performance requirements in accordance with Table 13-412.AB.3.
Heat trap required
Swimming Pools 13-412.AB.2.6
Cover on heated swimming pools: Time switch (exceptions);
Readily accessible on/off switch
Hot Water Pipe 13-41 LAB.3
Table 13-41 LAB.2 for circulating systems, first 8 feet of outlet
Insulation
pipe from storage tank and between inlet pipe and heat trap
Water Fixtures 13-412.AB.2.5
Shower hot water flow restricted to 2.5 gpm at 80 psi. Public
❑
lavatory fixture how water flow 0.5 gpm max; if self -closing valve
0.25 gallon recirculating, 0.5 gallon non recirculating
have been met
Motors 13-414
Motor efficiency criteria
Lighting Controls 13-415.AB
Automatic control required for interior lighting in buildings >5,000
s.f.; Space control; Exterior photo sensor; Tandom wiring with 1 or
3 linear fluorescent lamps>30W
EnergyGauge Summit® Fla/Com-2008. Effective: March 1, 2009
5/10/2012 Page 7 of 7
Project Name: American Legion
Project Title: American Legion
Address: Savanah Club Blvd
State: FL
Zip: 0
Owner: American Legion
EnergyGauge Summit® v4.00
INPUT DATA REPORT
Proiect Information
Orientation: North
Building Type: Dining: Bar Lounge/Leistiie
Building Classification: New Finished building
No.of Stories: 1
GrossArea: 6077 SF
Zones
No Acronym Description Type
Area
Isq
Multiplier
Total Area
Isfl
1 PrOZo 1 Zone I CONDITIONED
6077.0
1
6077.0
Spaces
No Acronym Description Type Depth
IN
Width Height Multi
IN IN plier
Total Area
lsq
Total Volume
lcf]
5/10/2012 EncrgyGauge Summit@ N,4.00 1
In "Lone: PrOZol
1 Pr0ZolSpl ZoOSPI
Food Service - Bar/Lounge
59.00
103.00
11.00
1
6077.0
66847.0
❑
Lighting
No Type
Category
No. of
Watts per
Power
Control Type
No.of
Luminaires
Luminaire
[W]
Ctrl pts
In Zone: PrOZol
In Space: Pr0Zo1Sp1
1 Compact Fluorescent General Lighting
1
7000
7000
Manual On/Off
10
❑
Walls
No Description
Type Width
H (Effec)
Multi
Area Direction Conductance
Heat
Dens. R-Value
IN
IN
plier
[sf]
[Btu/hr. sf. F]
Capacity
[Ib/cf] [h.sEFBtul
[Btu/sf.FJ
In Zone: PrOZol
l PrOZo1Wa1
5/8" stucco 104.00
10.00
1
1040.0
North
0.2067
5.731
34.65
4.8 ❑
/8"CMU/3/4"ISO
BTWN24"oe/.5"
Gyp
2 PrOZo 1 Wa2
5/8" stucco 104.00
10.00
1
1040.0
South
0.2067
5.731
34.65
4.8 ❑
/8"CMU/3/4"ISO
-
BTWN24"oc/.5"
Gyp
3 PrOZo 1Wa3
5/8" stucco 63.00
10.00
1
630.0
East
0.2067
5.731
34.65
4.8 ❑
/8"CMU/3/4"ISO
BTWN24"oc/.5"
Gyp
4 PrOZo 1 Wa4
5/8" stucco 63.00
10.00
l
630.0
West
0.2067
5.731
34.65
4.8 ❑
/8"CMU/3/4"ISO
BT WN24"oc/.5"
Gyp
5/10/2012 EncrgyGaugc Summit® v4.00
Windows
No Description
Tvpc
Shaded
U
SHGC
Vis.Tra
W
H (Effec)
Multi
Total Area
[Btu/hr sf F]
[ft]
IN
plier
[sn
In Zone: PrOZol
In Wall: East
6.00
5.00
2
60.0
1 PrOZolWa3Wi1
User Defined
No
1.2500
0.82
0.76
In Wall: North
0.76
2
90.0
I PrOZolWalWil
User Defined
No
1.2500
0.82
9.00
5.00
In Wall: South
1 PrOZo1Wa2Wi1
User Defined
No
1.2500
0.82
0.76
6.00
5.00
5
150.0
Doors
No Description
Type
Shaded?
Width
H (Effec)
Multi
Area
Cond.
Dens.
Heat Cap.
R-Value
IN
IN
plier
[sf] [Btu/hr. sf. F]
[lb/cf]
[Btu/sf. F] [h.sf.FBtu[
In Zone: PrOZoI
In Wall: North
1 PrOZo1Wa1Dr1
Solid core flush
No
3.00
7.00
2
21.0
0.6061
0.00
0.00
1.65
0
(1.75")
In Wall: South
1 PrOZol Wa2Dr1
Solid core flush
No
3.00
7.00
2
21.0
0.6061
0.00
0.00
1.65
EJ
(1.75")
In Wall: East
I PrOZo 1 Wa3Dr1
Solid core flush
No
3.00
7.00
2
21.0
0.6061
0.00
0.00
1.65
(1.75")
In Wall: West
1 PrOZol Wa4Drl
Solid core flush
No
3.00
7.00
2
21.0
0.6061
0.00
0.00
1.65
(1.75")
Roofs
No Description Type Width H (Effec) Multi Area Tilt • Cond. Heat Cap Dens. R-Value
[ftl IN plier [sq [deg] [Btu/hr. Sf. F] [Btu/sf. FJ [Ib/cq [h.sf.F/Btu]
1In Zone: PrOZol
5/10/2012 F.nergyGauge Summit® v4.00 3
I PrOZoIRfI Mtl Bldg Roof/R-19 103.00 59.00 1 6077.0 0.00,
0.0492 1.34 9.49 20.3 ❑
Batt
Skylights
No Description Type U SHGC Vis.Trans W
H (Effee) Multiplier Area Total Area
[Btu/hr sf F] IN
[ft] [Sf] [St]
In Zone:
In Roof:
Floors
No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value
[ft] [ft] plier [st] [Btu/hr. sf. F] [Btu/sf. F] [lb/cf] [h.sf.FBtu]
In Zone: PrOZol
1 Pr0Zo1F11 I ft. soil, concrete 103.00 59.00 1 6077.0 0.2681 34.00 113.33 3.73 ❑
floor, carpet and
rubber pad
Systems
PrOSyl
System 1
Constant Volume Packaged System
No. Of Units 1
Component
Category
Capacity Efficiency IPLV
I
2
3
4
Cooling System
Heating System
Air Handling System -Supply
Air Distribution System (Sup)
330000.00 13.00 9.80
108000.00 1.00
8825.00 0.46
6.00
❑
❑
❑
❑
i/10/2012 EncrgyGauge Summit a0 v4.00 4
Plant
Equipment Category Size Inst.No Eff. IPLV
Water Heaters
W-Heater Description Capacity Cap.Unit I/P Rt. Efficiency Loss
l Gas Storage water heater 55 [Gal] 130000 [Btu/h] 0.8000 [Ef/Et] [Btu/h] ❑
EA -Lighting
Description Category No. of Watts per
Luminaires Luminaire
Area/Len/No. of units
[sUft/No]
Control Type
Wattage
1W1
1 Ext Light I Uncovered Parking Areas -- 8 250
Parking lots and Drives
42500.00 Photo Sensor control
2000.00 ❑
Piping
Operating Insulation
No Type Temperature Conductivity
[F] [ Btu-in/h.sf.F]
Nomonal pipe
Diameter
(in]
Insulation
Thickness
[in]
Is Runout?
El
Fenestration Used
Name Glass Type No. of Glass SHGC VLT
Panes Conductance
(Btu/h.sf.F]
5/10/2012 EnergyGauge Summit® v4.00
ASHULSgICIrAII User Defined 1 1.2500 0.8200 0.7600 ❑
Fret
Materials Used
Only R-Value
RValue Thickness
Conductivity
Density
SpecificHeat
Mat No
Acronym
Description
Used
[h.sf.FBtu]
[ft]
[Btu/h.ft.F]
[lb/cf]
[Btu/ib.F]
187
Mad 187
GYP OR PLAS
No
0.4533
0.0417
0.0920
50.00
0.2000
Li
BOARD,1/2IN
178
Mad178
CARPET W/RUBBER PAD
Yes
1.2300
❑
265
Mat1265
Soil, 1 ft
No
2.0000
1.0000
0.5000
100.00
0.2000
❑
48
Mat148
6 in. Heavyweight concrete
No
0.5000
0.5000
1.0000
140.00
0.2000
❑
268
Mat1268
0.625" stucco
No
0.1302
0.0521
0.4000
16.00
0.2000
0
42
Mat142
8 in. Lightweight concrete
No
2.0212
0.6670
0.3300
38.00
- 0.2000
❑
block
4.19
0.3000
❑
269
Mat1269
.75" ISO BTWN24" oc
No
2.2321
0.0625
0.0280
23
Mat123
6 in. Insulation
No
20.0000
0.5000
0.0250
5.70
0.2000
❑
94
Mat194
BUILT-UP ROOFING, 3/81N
No
0.3366
0.0313
0.0930
70.00
0.3500
❑
Constructs Used
Simple
Massless Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct [Btu/h.sf.F]
[Btu/sf.F]
[Ib/cf]
[h.sf.FBtu]
loll
5/8" stucco /8"CMU/3/4"ISO
No
No
0.21
5.73
34.65
4.8
❑
BTWN24"oc/.5"
Gyp
Layer
Material Material
Thickness
Framing
No.
[ft]
Factor
1
268 0.625" stucco
0.0521
0.000
1:1
2
42 8 in. Lightweight
concrete block
0.6670
0.000
❑
3
269 .75" ISO BTWN24" oc
0.0625
0.000
❑
4
187 GYP OR PLAS BOARD,1/21N
0.0417
0.000
❑
5/10/2012 FncrgyGaugc Summit® v4.00
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sf.Fl
[Btu/sf.F[
[Ib/cq
[h.sf.FBtul
1027
Solid core flush (1.75")
No
Yes
0.61
1.7
❑
Layer Material
Material
Thickness
Framing
No.
[ftl
Factor
1 278
Solid core flush (1.75")
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sEF]
[Btu/sEF]
[lb/cfl
[h.sEFBtul
1056
Mtl Bldg Roof/R-19 Batt
No
No
0.05
1.34
9.49
20.3
❑
Layer Material
Material
Thickness
Framing
No.
[ft]
Factor
1 94
BUILT-UP ROOFING, 3/81N
0.0313
0.000
❑
2 23
6 in. Insulation
0.5000
0.000
❑
Simple
Massless
Conductance
Heat Capacity
Density
RValue
No
Name
Construct
Construct
[Btu/h.sEF]
[Btu/sEFl
[Ib/cfl
[h.sEFBtul
1057
1 ft. soil, concrete floor, carpet and rubber pad No
No
0.27
34.00
113.33
3.7
❑
Layer Material
Material
Thickness
Framing
No.
[ft]
Factor
1 265
Soil, I ft
1.0000
0.000
13
2 48
6 in. Heavyweight concrete
0.5000
0.000
❑
3 178
CARPET W/RUBBER PAD
0.000
❑
• 5/10/2012 EncrgyGauge Summit® v4.00 7