Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutROOF PLANJ2
J4
J6
At IG
A70
A6
A5
A3
A2
Al
At
Al
A7
A7
Al
A2
A3
A4
A5
A7
A8
A9G
K4
K5G
J6
J4
J2
N
N 4 0a0 a0 CO ro W oo a0 W W a0 W 0a W a0 n) .+ N
it
11
N
r
t
N
N
A
2'
21
2•
n
N
m
�
ro
I
J4A
�
p✓'
J2°'
a h I
R
J2
J4
J6
J6
J4
J2
APPROVED TRUSS ANCHOR BY BUILDER
TRUSS BEARING HEIGHT SCHEDULE 2x4 MINIMUM TOP and BOTTOM CHORDS
PLUMB CUT OVERHANG
4 1/16" HEEL HEIGHT
E::7= 8F-8,r
ALL CEILINGS ARE FLAT AT BEARING HEIGHT
HANGERS TO BE USED
(Simpson) or (Usp)
QA
HUS26
CO
HUS26
©
HGUS26-2
Q
THDH26-2
QE
HGUS26-3
EQ
THDH26-3
5
M
TYPICAL TRUSS END DETAIL
O O RT16A I I NOTE:
© CONNECTION BY BUILDER J YOUR SIGNATURE WILL ACKNOWLEDGE:
P REVIEWED ❑ REVIEWED AS NOTED
❑ REVISE & RESUBMIT ❑ REJECTED / RESUBMIT
❑ NOT REVIEWED ❑ FOR YOUR INFORMATION
Submittals are reviewed for conformance with design intent
led general compliance with the Contract Documents only,
Notatiees Do Not Authorize Changes to Contract Sum.
Reviews, Comments and/or corrections does not relieve the
Contractor from compliance with the Contract Documents, The
Contractor is responsible for confirming and correlating all
(luastitto$, dimensions, tolerances, clearances, fabrication
processes, techniques and sequences of construction,
compatibility of materials and materials coordination of their
work with other trades and subcoalre ors, performance of
work in a safe and satisfactory ma ' ad for full compliance
with the Combo gments.
is
RIMEWED BY
A. SIGN GROUP
1) AUTHORIZATION FOR FABRICATION.
2)..VERIEIGATION._OF-ALL DIMENSIONS,. CMDITIONS,_ .....
AND TRUSSES, TRUSSES WILL BE MADE IN
STRICT ACCORDANCE WITH THIS PLACEMENT PLAN.
3) RECEIPT AND USE OF "HIB-91 Summary Sheet
COMMENTARY and RECOMMENDATIONS for HANDLING,
INSTALLING & BRACING METAL PLATE CONNECTED
WOOD TRUSSES" (TPI).
4) NO BACK CHARGES OR CRANE CHARGES OF ANY
KIND WILL BE ACCEPTED UNLESS SPECIFICALLY
AUTHORIZED IN WRITING BY TRUSS PLANT MNGMT.
czinmrn
TITLE
DATE
All spacing Is 24" O.C., except as noted.
All walls shown are bearing, except as noted.
All valleys calculated with sheathing under.
Number of girder plies to be determined by engineering.
DO NOT CUT OR ALTER TRUSSES w/o AUTHORIZATION FROM THIS OFFICE.
Labeling trusses is a service, not a requirement. Engineered
drawings supercede labeling of trusses. It is the responsibility
of the builder to utilize engineered drawings when erecting trusses.
WARNING
ERECTION BRACING IS NOT THE RESPONSHAUTY OF TRUSS DESIGNER, PLATE MANUFACTURER,
NOR TRUSS FABRICATOR. PERSONS ERECTING TRUSSES ARE CAUTIONED To SM
PROFESSIONAL ADVICE REGARDING ERECTION BRACING WHICH IS ALWAYS REWIRED TO
PREVENT TOPPLING AND DOMINOING DURING ERECTION; AND PERMANENT BRACING WHICH
MAY BE REWIRED IN SPECIFIC APPUCATIONS. SEE 'SCSI-B1 Summary Sheet COMMENTARY
and RECOMMENDATIONS for HANDLING, INSTAWNG & BRACING METAL PLATE CONNECTED
WOOD TRUSSES' (TPI). TRUSSES ARE TO BE ERECTED AND FASTENED IN A STRAIGHT AND
PLUMB POSITION WHERE No SHEATHING IS APPUED DIRECTLY TO THE TOP CHORDS; THEY
SHALL BE BRACED AS SPECIFIED ON THE TRUSS DESIGN,
TRUSSES SHALL BE HANDLED WITH REASONABLE CARE DURING ERECTION TO PREVENT
DAMAGE
TRUSS COMPANY SUPPLIES ONLY TRUSS TO TRUSS CONNECTIONS.
E TRUSS COMPANY WILL SUPPLY ALL TRUSS TO TRUSS HARDWARE
O CONNECTIONS FOR REACTIONS UNDER 5000 POUNDS. FOR ALL
I-� REACTIONS GREATER THAN 5000 POUNDS, OR SKEWED, NO
F—R HANGER IS SUPPLIED.
f, CONTRACTOR SHOULD CHECK ALL REACTIONS FOR PROPER CONNECTIONS.
%e� MMS(low—rise)/C—C hybrid Wind ASCE 7-10
, Exposure Category : C Bldg Category : 2 Wind Design Velocity :160 MPH
ROOF PLAN �/ Imp. Factor : 1.00 Wind Load Duration Factor : 1.60 Mean Roof Height : 15 H,
SCALE: 3/16 = 1'-0" ELEVATION "A" "Ill, Bid M Mold Struct Eng 6051 2590 N. KINGS HIGHWAY FL PIERCE, FL 34951 772) 464-4160
SC �nll�U y E _
Stto PA 0,7 s
Trusses shown on this layout are a component part N
of the building and show truss location. S
Proper erection, temporary and permanent bracing deaign r��, TRUSS (772) q64-4I60
are the responsibility of the budding designer or his engineer.
Lateral bracing shown on the individual truss drawings �COMPAMM, INC"
l must be placed during the erection procedure. 2590 N, Kings Highway Fort Pierce, FL 34951
JOB
&_ -tso LOT.
1
ADD
SUB
DESCRIPTION: v
1348 Oakland Lake Circle Plan — 1722 Elev. A
eCAIE: DATE: DRAWN BY: DRAWING NUMBER:
Oakland Lakes 3/16"=1'—O" 6/01/2018 dR G 1722—A
I
w
_
•
er
•
•
ra
_
•
•
-
R
•