HomeMy WebLinkAboutBLOWER DOOR TEST DUCT LEAKAGE TEST REPORTSCAM=15 lightyears
;.
15 lightyears, IncV
776 Bennett Drive
Longwood, Florida 32750FI LE CO'OY
June 1, 2018 RFCFl��o
�y `
pe'mf . ?41B
St b0s o
To: Local Building Department �4Q�eC04nt�nenr
Y
RE: Blower Door Test & Duct Leakage Test Reports
To whom it may concern,
This letter is to request that the attached forms be accepted for compliance of the 2017 Florida Building
Code statute R402.4.1.2 Envelope leakage testing (Blower Door Testing) and R403.3.3 Duct testing.
The attached forms were provided by the Florida Building Commission as the accepted forms to be
submitted. These forms are listed on the 2017 Florida Building Code, Energy Conservation Technical
Assistance Manual, Document Number: TAM-2017-1.0, released February 02, 2018, pages R-78 through
R-80 (page numbers 159-161).
Web link provided for quick access to the TAM document hops://tinyuri.com/2017FBC-TAM
These forms meet all three required Residential Energy Efficiency Compliance Paths listed under R401.2,
Prescriptive, Performance, and Energy Rating Index (ERI) paths.
We are working with building departments across Florida to standardized the form submittal process and
would like your department to allow these forms to meet compliance. If there are any issues with
accepting these forms, please reach out to me directly and I will ensure that we submit any specific form
that you will require. Tim Smith (407)-951-3236 tsmith@151ightyears.com
Respectfully,
�2
Timothy rnith
15 Lightyears, Chief Operations Officer
Energy Technical Advisor
RESNET Quality Assurance Designee
IECC Residential Energy Inspector/ Plans Examiner
Member, Building Officials Association of Florida Member and Code Development Committee
participating member. Also, representative to the Florida Building Commissions, Energy Technical
Advisory Committee for the BOAF- CDC
a
Planni� _i Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
Phone:772-462-2165 Fax:772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
RECEIVED
NOV. ¢ 1010
Permjttjn
St L� e e U ry eat
. � . ... 1,, ,e ,......... Prescriptive and Performance -Method:....,.,. — - ,
Date: �� l2 ��fi Permit #: �' 06 oq9�
Contractor:
Job Address:yC 2�G dak�cyA tCokC ty- Zt;
Construction:
Construction — Complete ( ) Existing —After Addition
House Infiltration Test Results SLC Climate Zone 2
CFM (50) _ S' Test Date:
Volume = i 9-C,3
ACH (50) =CFM (50) x 60 /Volume = —�— Ma al Ventilation required less than 3 ACH
Passing results must be & ACH (50) or less echass ( ) Fail
FBC, Energy
The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
approved third party. A written report of the results of the test shall be signed by the party conducting the test and
provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
thermal envelope.
FBC, Residential
Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a
pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
the dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
Testing Company
Company Name: S k kQ.n Address:
I hereby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
requirements igzccordance with,5ection R402.4.1.2 Climate Zone 2.
Signature:
Printed Name:
License/Certification #.:S 011'_�
Inspection Report
-r.. ❑ BuiltSmart.Sampling.. ❑BuiltSmart 2 Ins ections -
❑ Pre -Drywall final Inspection ❑ Re -inspection
1 1�i ❑2009 IECC* ❑ 2012 IECC* ❑ 2015 IECC*
Date: ` I'' �� l ll6 *Code Compliance only relates to Infiltration and Duct Leakage Testing
Model: Division: Community:
Address: D7- U pAKLAtjP LAke CIR. City:
Orientation: • K*1 State: _
Foundation: ❑ Slab
*If Crawl Space:
Lot#
Zip code: Electrical Meter # Gas Meter #
❑ Crawl Space* ❑ Basement" ❑ Above Conditioned Space
❑ Enclosed Vented ❑ Conditioned **If Basement: ❑ 50 percent below grade
List all deficient items, general notes, and recommendations (attach additional notes if necessary)
R SR (R-Required; SR -Strongly Recommended)
❑ ❑
❑ ❑
Additional deficient items are listed on page 2
❑ 1. Duct Leakage @ 25 Pascal*:
Total (cfm2s) Unconditioned (cfmzs)
Cond. Area (ftz)
Total Leakage (%) Leakage to Unconditioned (%)
System 1) (9_cfm2s
cfm25] _
A a ftz =
`• WO % Total % to Unconditioned
System 2) f cfm25
cfm25] _
ftz =
% Total % to Unconditioned
ste 3) ( cfm2s
�ltration
cfm2s]
ftz _
% Total % to.Unconditioned
2 InfiCFM50*: l 2?
* 60 /
1 Z =
S t g 2 (Final)
Cu.
Volume
ACH50
^;;)tcanHrynpncrlrtrrrres �!=r�!frrnnir
7.5 Number ofRcdrooms: - "f A
T01411 ventilation needed: = N;,�
*Tesdngprocedures compliant with 2009IECCR402.4.21 Envelope and R403.2.2 Dud Leakage and 20121ECCR40L4.L2 Envelope andR403 2.2 Duct Leakage
(See local5pile official and code book for specific parameters.)
Inspection Result: ASS ❑ FAIL ❑ N/A (Re -inspection Required if Fail is Checked)
Duct Blaster Result: ['A ❑ FAIL El N/A (Re -inspection Required if Fail is Checked)
Infiltration (Final Inspection): ASS ❑ FAIL ❑ N/A (Re -inspection Required if Fail is Checked)
HERS Rater- Signature:- - - -
Builder Employee Signature:
Builder Company Name: -.. Ryan .Homes
Date:
PEG LLC
11130 Fairfax Blvd. Fairfax, Va. 22030 703-934-2777
-1