Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT08/10/2018 PERMIT BUILDEP PEST CC PEST CO We, the un subterrane, Square feel Percentage Date of Tre Other 19:38 770 I I i I _ i sdANNED BY St L4de Couftjy Foi 772-462- I C�R,TIFICATE CONSTRUC' .. U JOB p CONTRA OR: ITROL CONTRACTOR: .l !TROL LICENSE #: :rsigned, helreby certify that we h termites injaccordance with the area treated: F solution:� meet; 014,11,K In Treatmeht Re -Treat iy ls' Treatment Re -Treat AMC: There ust be a rnrrlpleted form for each site to be p/e d up by the I�Speetor at time of e t°ee cr7arged. I FBC104.2.6 ertificate of Anotective Treatment for shallbe provi d to rece/ve duplicate Treatment Cei providing a y for the pe4on the permit is issued CertrICate sh provide the ,product used, Identity o, treated, the a/ used, perci nt concentration and r rotecrtive toe meet. Irthe;soll chemical barrier me be completed rior to final bjullding appro�a/, St Lucie CoInty requir4s for the final insp JMGM OU Virginia AV-6 Pierce, FL 34982 L72 Fax 772-462-6443 F TERMITE TREATMENT [ON SOIL TREATMENT PAGE 01 RECEIVED AUG 13 2018 ST. Lusie 6eanty# Permitting DRESS: 3ve pretreated the above described construction for standards of the National Pest Control Association. Chemicals used:011 �s_� Total gallons used., Time of Treatment: - •' 3 ..) --Slab I't Treatment Re -Treat Pools --l" Treatment' • t Perimeter, fOr ftInspection Signaturi of— t*rninator uired treatment or re -treatment and this form must be on the job inspection or the scheduled inspection will fail and a re-lnspectlor, yr -venticn of termites. A weather resistant jobslte posting board ificates as each required protect/ve treatment is completod, o and another copy for the bulldiRg permit files. The Treatment the appllrator, time and date of the treatment, site location, area ember of gallons used, to establish a verlflable recvrd of hod for terjn/te prevention is used, final exterior treatment 517a1l for CO, a Permanent Sticker to be placed on