HomeMy WebLinkAboutFBC ENERGY CONSERVATION��,:.,..._:.•.:,u..._.,......:..._..�,.,....,Planning...&..Development.,.$ervices:.:,_ ECEIVED = w...
Building &.,.Code Regulation Division
2300 Virginia Ave, Rm 201 DEC
Fort Pierce, .FL 34982 ..__ 2 ®?OMB.. .
r ������� 1 772-462-2165 Fax 772-462-6443 Pe`n itting Department
e [l Lticie County
FBC ENERGY CONSERVATION CODE
Stpn p , Duct Sealing Certification
Luch �1 nffis Prescriptive and Performance Method
....... __......Date:, I T 'JON Lot#. `� __.._......_......__. _...,._,._
Contractor: & Address:
Construction: ❑ Post Construction Test ❑ Rough -in Test
Test Conditions: {{���
Date: /� /V661a Floor Area (ft2):
Time: /y► Primary Location of Supply Ductwork AlinZ
Indoor Temperature (F): Primary Location of Return Ductwork rC�
Outdoor Temperature(F): ®
Total Leakage Test (Outside) ,O
Duct Leakage: ❑ Default ❑ Prop. Leak Free t�oposed On =
Test Pressure: '2 (Pa)
Baseline Duct Pressure (optional) (Pa)
Duct Press. (Pa) Flow Ring Fan Press Flow (cfm) Results: erfass ❑ Fail
Installed Pa
Total Leakage (cfm):
Total Leakage per 100 sgft:
CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
Testin4 Company /
Company Name: Address:61
n L1�1
I hereby certify that the above Duc aling Leakage results demonstrate compliance with 5, Edition FBC Energy Conservation requirements in accordance with
Section R403.2.2.
Signature:
Printed Name: �r �� (/ !7Y/dS License/Certificate #: