HomeMy WebLinkAboutPERMIT REVISIONDATE:
To:
From:
Permit
r R. Wulbern Architect P'RN�1E
°b �454 5wilcan Bndge Lane, N . tel (904) 329-25�10
Jacksonville ,Flonda{.' fax: (904) 379 4978 BY
32224,,:_license AA-0043iUGle-COU11tj/
` , �'-Hobert@wulbem.net
14, 2018
PLANNING & DEVELOPMENT SERVICES
BUILDING & CODE REGULATION DIVISION
23l00 Virginia Avenue
F�� Pierce, FL 34982
Rpbert C. Wulbern, RA
Jo!.: 1712-0221
Permit
Revision
N.E. Corner Kitterman Road
St. Lucie County, Florida 34952
Proj. No: 1667.07
The following revisions have been made to the Permit Documents approved by the St. Lucie County Building
Departme6t. These revisions have been clouded and are being submitted for review and consideration.
A
v
• 0 Sheet EQ-1 (Equipment Plan): Updated plan to reflect Owner requested floor plan changes to the Drive-
Tfru Beverage area.
• • S,I1eet A-1 (Floor Plan): Updated plan to reflect Owner requested floor plan changes to the Drive-Thru
Beverage area.
. a Sfleet A-1.2 (Product Review Affidavit): Clarified Tie Down Fastening on Product Approval Affidavit per
Building Plan Review comments. •
• Sheet A-1.3d (Monument Sign):aUpdated Monument Sign design per Building Plan Review comments.
• �' Sheets A-1.4a & A-1.4b (Trellis Details): Added Trellis Details to package.
• . Sheet A-1.5 (Trash Enclosure): Added Trash Enclosure Plans and Details to package per Building Plan
Review comments. •
. . Sheet A-13b (Door & Window Fasteners):*Added Door & Window Tie Down Fastening information per
Building Plan Review comments.
• 0 Sheet S-1 (Foundation Plan)** Updated Foundation Plan to remove Walk -in -Box slab recess.
• 1 ShII eet S-2 (Roof Framing): Clarified Framing Return at Archon Towers. •
• . Sli',eet S-5 (Sections): Updated Foundation Sections to remove Walk -in -Box slab recess.
• • Sheet S-6 (Sections: Clarified Framing Return at Archon Towers.
• • Sheet S-10 (Typical Details): Clarified Framing Return at Archon Towers.
• a % Sheets P1-1 and P2-1 (Plumbing Drawings): Updated drawings to reflect Owner requested floor plan
changes to the Drive-Thru Beverage area. •
• • Sheet P1-1 (Plumbing Plan): •Added information regarding the size of the Grease Interceptor per Building
Plan Review comments.
•`% Sheets EO-1 and EO-2 (Electrical Site Plans): Updated plans based on Permit Comments from Planning
�. � &Zoning. •
•�' SV'pets E1-1, E1-2, E2-1, E3-1 and E5-2 (Electrical Drawings): Updated drawings to reflect Owner
requested floor plan changes to the Drive-Thru Beverage area. •
• ` Sheet E1-2 (Power Plan): Added rough -in information for future Ordering IGosks.
• Skeet E3-1 (Technology Plan): Added rough -in information for future Ordering Kiosks.
w f T; Aa
lti17
1a