Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 36, Creekside Date: October 23, 2018
Address: 8701 Cobblestone Drive, Fort Pierce, FL Order #: 18DR939
Area Tested: Building Pad Permit #:
Mated ill Type: Light Brown Sand with Some Rock Tech: BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.: 95%
I Palm Bay, FL 32907 Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
Center
of Building Pad
12"
FL
6.3
109.5
112.0
14.0
97.8%
Yes
2
NW
Corner of Building Pad
12"
FL
6.0
109.1
1 112.0
14.0
97.4%
Yes
3
SE
Corner of Building Pad
12"
FL
6.0
110.3
112.0
14.0
98.5%
Yes
4
I
5
6
I
7
8
9
10
I
11
12
13
14
I
Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
iThis is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity.
Legend for Elevation:.
PR = Proi&roll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:-,-
SL = Springline FL = Final Lift -'Keith LeBlanc, P.E.
SG = Subigrade BG = Below Grade Federal,Engineering & Testing, Inc.h/�
BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 59394
TOP = Tolp of Pipe FG = Finished Grade 'Certificate,of Authorization #5471
As a mutuall protection to clients, the public and ourselves, all reports are submitted as the confidential property,of clients, and authorization for publication of statements,
conclusions) or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree,of compaction of the tested layer of
material only. A density does not replace a soil bearing capacity determination. These density tests do not certify iiie: underlying ioil-materials', ow the proposed structure.
The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is rzq'uirec, to,certify thaW6 'underlying soils will support the
proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend theitseil'borings be performed to evaluate the
suitability ofl}he underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this
work.
PAGE 1 of 2
f
Compacted Soils Method D-6936 Disclaimer
Pursuant to your request, .Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose ofv..our test was to determine the degree of compaction of the tested layer iof
material only. In no: way shall a compaction -test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to, construction to, verify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. FET.was not contracted to perform supervision of the building pad preparation. This testing of
the added fill material` does. -not include an analysis of the underlying soil materials to determine if they are capable of
supporting the proposed structure'wit iout,'settlement. This density compaction test does not warranty any underlying soil
materials or conditions below,the tested_ top,12inches of material. If no soil borings have been performed in the location of
the proposed structure, we �recommehd performing soil borings below all foundation areas of the proposed structure to
verify the underlying soil conditions. "
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services,is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications aye
required, Federal Engineering & Testing, Inc. shall be notified.
1
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions ;on
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activitibs,
excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted ad
re -tested prior to construction.
i
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval. - i
It has been a pleasure working -with you and we look forward to doing so in the near future.
Page 2 of 2
RECEIVED
Phone: 954-784-2941
ederal OCT 1, z01B E-Fax: 954-784-7875
g i neeri n g Permfttin admin@fed-eng.com
St r
9 Department www.fed-eng.com
esting, Inc. _-- - ,
Field Density Tests of Compacted Soils Method D-6938
Projdll'ct: Proposed Residence Lot 36, Creekside Date: October 23, 2018
Addrr ss: 8701 Cobblestone Drive, Fort Pierce, FL Order #: 18DR939
Area Tested: Building Pad Permit #: (M ��
Mate�ial Type: Light Brown Sand with Some Rock Tech: BK
D.R. Horton, Inc.
1430 Culver Drive NE
Palm Bay, FL 32907
Compaction Req.: 95%
Proctor Method: ASTM D-1557
Test
#
I
TEST LOCATION
Probe
Depth
Elev.
Moist
,�o
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%.
Compaction
Pass
1
enter of Building Pad
12"
FL
6.3
109.5
112.0
14.0
97.8%
Yes
2
II W Corner of Building Pad
12"
FL
1 6.0
109.1
112.0
1 14.0
97.4%
Yes
3
1$11E Corner of Building Pad
12"
FL
6.0
110.3
112.0
14.0
98.5%
Yes
4
i
5
6
li
7
II
8
I
9
10
11
12
13
14
i
Remar S: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and Is not a verification of Soil Bearing Capacity.
Legend f r Elevation: Nii//��,,
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: 2a,
•. B �����
SL = Spriptgline FL = Final Lift Keith LeBlanc, P.E. X
SG = Sub�grade BG = Below Grade Federal Engineering & Gig, INO, 93 �110
BC = Basicourse BOF = Bottom of Footing Florida Reg. No. 59393
TOP = Top of Pipe FG = Finished Grade Certificate of Authori21e8 671
As a mutualllprotection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authodzafwrrAr pubiica93ioiQ�fnent;l��/
conclusions,bbr extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of corf ter of he tested iaye�o$ ��
material only A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials'b tlw
The results P not preclude or guarantee that future settlement and cracking will not occur. A soil boring lest is required to certify that the untie �, %I -W. F9
proposed st cture without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be pdr r A&JI a.thlb
suitability of a underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be'perforrn6don this
work. I�
PAGE 1 of 2