Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST 1-8-19ederal gineering eating, Inc. RECEIVED JAW 0 8 1,3 19 Lc'" CQRY. Field Density Tests of Compacted Soils Method D-6938 E-Fax: !954.784.7675 admln@fed.eng.com www.led-ono.com ect: Proposed Residence Lot 45, Creekside Date: January 3, 2019 ress: 8753 Cobblestone Drive, Fort Pierce; FL Order #: 19DR021 i Tested: Building Pad Permit #: ' grial Type: Brown Sand with Traces of Rock Tech: BK D.R. Horton, Inc. 1430 Culver Drive,NE Compaction=Req.: 95%. Palm Bay, FL 32907 Proctor Method: ASTM D-1557 est �# TEST LOCATION Probe_' Depth Elev. Moist % Dry Density PCF Proctor. Value PCF .Optimum . _Moisture /o . Compaction Pass 1 Center of Buildih Pad 12" FL. 10:0 111.1 1.13.0 14.0' ..98.8% Yes 2 NW Corner of:Buildin Pad 12" FL 7.1 110.1 113.0 _ 1.4.0 97.4% Yes 3 SE Corner of Building Pad 12" FL 7.3. 111.8 113.0 - 14.0 98.9% Yes 4 5 6 7 I 8 9 10 11 . 12 13 14 v 1N, 011 N �� Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer -,S\;•' ry10Ep�_; �� Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted:by: SL = Springline FL = Final Lit Keith LeBlanc, P.E. �� TIE f SG = Subgrade BG = Below Grade Federal Engineertt 1, Inc BC = Basecourse BOF = Bottom of Footing Florida Reg. No. 533,'-v��P•�G�a`��� TOP = Top of Pipe FG = Finished Grade Certificate of Auti _orizat90 As a mutual protection to clients, the public and ourselves; all reports are submitted as the confidential property of clients, and authorization for- bff III statements, conclusions or extracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test Is required to certify that the underlying soils will support the proposed structure without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rainlstonns; retesting must be performed on this work. PAGE 1 of 2