Loading...
HomeMy WebLinkAboutPRELIMINARY SUBSURFACE EXPLORATIONSCANNED BY St, Lucie CduntY UNIVERSAL ENGINEERING SCIENCES PRELIMINARY SUBSURFACE EXPLORATION Proposed Oakland Lake Estates Subdivision Oakland Lake Circle Fort Pierce, Saint Lucie County, Florida Universal Project No.-0330.1700052.0000 May 19, 2017 r PREPARED FOR: Ryan Homes 2005 Vista Parkway, Suite 1'02 West Palm Beach, Florida 33411 PREPARED BY: "Universal Engineering Sciences, Inc. 820 Brevard Avenue Rockledge, Florida 32955 (321) 638-0808 Consultants in: Geotechnical Engineering U�entiiiencgp-�o ct' to ' Is Testing • Threshold Inspection Offices in: Orlando •Daytona Beach • Fortr$�•J kso ille Im Coast - Rockledge • Sarasota - Miami • Panama City • Pensaco • Fmp each Atlanta, GA Tifton, GA r ''t +, E RSA L I,LOCATIONS:N Atlanta i ,'i Daytana Beach E_N"GI;N'E-E°R,I NG S C;I E �l'C ES Fort Myers k+ . Fort Pierce Consultants In: Geotechnical Engineering • •Environmental Sciences r�_ Gainesville Geophysical Services • Construction Materials Testing •'Threshold Inspection ,.� Miami Jacksonville • Miami BuildiridInspection• Plan Review • Building Code Administration "'.•,. Ocala' Orlando (Headquz 14'.. Palm Coast bar, Panama city May 19, 2017 l_- Pensacola Rockledge Ryan Homes _.:.Sarasota 1450 Centrepark Boulevard, Suite 340 '`v: Tampa west Palm Beach West Palm Beach, Florida 33401 ; • Atlanta, GA Tifton, GA Attention: Mr. Michael DeBock Reference: Preliminary Subsurface Exploration Proposed Oakland Lake Estates Subdivision Oakland Lake Circle. Fort Pierce, Saint Lucie County, Florida Universal Project No. 0330.1700052.0000 Dear Mr. DeBock: Universal Engineering Sciences, Inc. (Universal) has completed a preliminary subsurface exploration at the above. referenced site in Fort Pierce, Saint Lucie County, Florida. Our exploration was authorized by you and was conducted as outlined in. Universal's Proposal No. 0330.,0417.00003. This exploration was performed in accordance with generally accepted soil and foundation engineering practices. No other warranty, expressed or implied, is made. The following report presents the results of our field exploration with a geotechnical engineering interpretation of those results with respect to the project characteristics as provided to us. We have included our estimates of the typical wet season high groundwater levels at the boring locations and general comments concerning anticipated soil support characteristics for typical low-rise residential buildings. We appreciate the opportunity to have worked with you on this project and look forward to a continued association. Please do not hesitate to contact us:',if you should have any questions;. or if we may further assistyou as your plans proceed:, Sincerely yours,, UNIVERSAL ENGINEERING SCIENCES, INC. Certificate ofAuthorization:'No. 549 Jose R. Benitez Jr., Staff Engineer 2 — Addressee UESDOCS #1450465 Brad Faucett, M.S. P,:E. 6/,�'. _�•S,' Regionai;Engineer Florida Professionsl;Engineer No., 820 Brevard Avenue, Rockledge, Florida 32955 (321) 638-0808 Fax (321) 638-0978 avywv:.UniversalEngineering:.com TABLE OF CONTENTS 1.0 INTRODUCTION.........................................................:................. ::.::..-:...... ::::...:.::::.:::.:.:.:.. 2.0 PROJECT DESCRIPTION ................................ .:..... :............. :...... :.:.:.::..:.:::::.:..::.::::.::.:::.::::.:.s:..::1 3.0 PURPOSE................................::.:.:...:...::..:.:.::::..:..:::::.:.::::::::::::.:::::::.:�::::::.:::� 4.0 SITE DESCRIPTION ......................:.......... • .. _ ....................1 4.1 SOIL SURVEY .................. 2 4.2 TOPOGRAPHY ...................... .. _..................................................................................2 5.0 SCOPE OF SERVICES .............................. ..........................................................................2 6.0 LIMITATIONS .............. ::.:..:.:::.::..:................. ............ ....:.........................................,.::,..3 7.0 FIELD METHODOLOGIES ............................... ..........................................:..:.:...:...:::.:::.:::.:....:::.::.:4 7.1 STANDARD PENETRATION TESTS .................:.::.: r::,-.:.:.,:::,...:...;..........,,;....,....,..,.,..,.,.,...,.,........... 7.2 DYNAMIC CONE PENETROMETER TESTS 7.3 PAVEMENT CORE SAMPLES .............:::.........:..:. 8.0 LABORATORY METHODOLOGIES....................:.::......:...:4 8.1 PARTICLE SIZE ANALYSIS ............... _ c.4 9.0 SOIL STRATIGRAPHY......................... ::.:::...... :...:.::....... ::.:.....::::::..:::::::.::::.:.::::.::.: ,:::.::..••.::::.:::.:.:.5 9.1 PAVEMENT CORE RESULTS....... ................ .,; ;,:: :.. r •...::...:.::::::5 10.0 GROUNDWATER CONDITIONS ................. :.:.::::::::::::::.:::..:::::::::...::.:.:.:.:::.:.::.:::::::.::..:..:...6 10.1 EXISTING GROUNDWATER CONDITIONS ..........:;::..:...::::. 10.2 TYPICAL WET SEASON HIGH GROUNDWATER LEVEL::...::.:;,...:,:::,:.:.:;::::::..::....................:...........::.:.:::.::6 11.0 LABORATORY RESULTS ......... ::::::::.:::::.:::.::;.::::....:..:::::;::::::::,:::..................................................... 11.1 PARTICLE SIZE ANALYSIS.......... ,. ....::.....:............... ...:..:...-..........,.. 7 12.1 PROPOSED BUILDING AREAS..... ..,.::.....:.::::....:,:..........:.:....:..:.:....... ; . :.7 13.0 CLOSURE ..........................................•. ..........,...,........,.....•..........•.........:.:..:..:8 LIST OF TABLES Table I: Saint Lucie County Soil Survey Designated Soil Types:.-...,..,...,.,.........._..,.........,...::..,2 Table II: Generalized Soil Profile .......,,,;;:,,,;.;,,;,,.,•,:;,;;, ;,;;;,,5 Table III:. Pavement Core Results ..... :...................... :...,:.-.:.:...:................... 6 820 Brevard Avenue, Rockledge, Florida 32955 (321) 638-0808 Fax (321) 638-0978 www.UniversalEngineering.com FIGURES Boring Location Plan. No. 1 APPENDICES Key to Boring Appendix A Boring Logs ......... Appendix A EXHIBITS GBADocument ... Exhibit 1 820 Brevard Avenue, Rockledge, "Fibfida 32955 (321)",038rO808 Fax (321.) 638-0978 nginee� r.I ; I - I - www.qhiv"' alE g.com, "er's in Oakland Lake Estates Subdivision Universal Project No. 0330.1700052.0000 Fort Pierce, Saint -Lucie County, Florida Preliminary Subsurface Exploration 1.0 INTRODUCTION Universal. Engineering Sciences, Inc. (Universal) has completed a preliminary subsurface exploration for the proposed Oakland Lake Estates Subdivision in Fort Pierce, Saint Lucie County, Florida. Our exploration was authorized by Mr. Michael DeBock of Ryan Homes and was conducted as outlined in' Universal's Proposal -No. 0330.0417:00003. This exploration was performed in accordance with generally accepted soil and foundation engineering practices. No other warranty, expressed or implied, is made. ZO PROJECT DESCRIPTION It is Universal's understanding, based upon information provided -by. the client, that the proposed project will consist of a residential subdivision in Fort Pierce, Florida; currently envisioned as shown- in Figure No. 1. The proposed subdivision is intended to have seventy-three (73). residential lots. We understand that the stormwater runoff from impervious surfaces to be developed at this site will be collected within an existing retention basin located in the central sections of the project area. Please note that our subsurface exploration wasgrellrriinarv, in nature and conducted to acquire general subsurface information only. Once specified sife configuration, building detail and structural and traffic loading information are available a final subsurface exploration should be performed. 3.0 PURPOSE The purposes of this exploration were: • to explore the subsurface conditions at general locations,and depths as requested. by the client and • to provide our estimates of the typical wet season high groundwater levels at the boring locations and i to provide general comments concerning the anticipated soil support characteristics for typical low-rise residential construction. 4.0 SITE DESCRIPTION The subject site is located within Section 11, Township 34 South, Range�89 East in. Saint Lucie County, Florida. More specifically, the site is located on the northwest quadrant of Palomar Street Road and North Kings Highway, in Fort Pierce, Florida. At .the time of drilling, the site vegetation consisted of mostly grass, along with an existing paved circular road around the proposed subdivision. 1. 820 Brevard Avenue,; Rockledge, Florida 32955 (321) 638-0808 Fax (321) 1638-0978 www.UniversalEngineering.com , Oakland Lake -Estates Subdivision Universal Project No. 0330.1700052.0000 Fort Pierce, Saint Lucie County, Florida Preliminary Subsurface Exploration 4.1 SOIL SURVEY Two (2) soil types are mapped within the general project area according to the Saint Lucie County Soil Survey (SLCSS), dated 1980. A brief description of these soils is provided in the following Table I. TABLE I SLCSS DESIGNATED SOIL TYPES Soil Type (Map Symbol): !, Brief Description , Soil material that has been dug up from several areas with different' Arents, 0 to 5 percent slopes (4) kinds of soil: It is used. to fill up' areas such as low sloughs;' marshes, 1i r shallow'depressions, and swamps:. Wabasso sand (48) ; Nearly level, poorly drained sandy soils in 'broad ,areas in the I} flatwoods. 4.2 TOPOGRAPHY According to information obtained from the United States Geologic Survey (USGS) Oslo, Florida quadrangle map dated 1949, photo -revised 1970, ground surface elevation across the site area (pre=developmental) is approximately +20'feet National Geodetic Vertical Datum'(NGVD). 5.0 SCOPE OF SERVICES The services conducted by Universal during our preliminary subsurface exploration program are as follows: v Drill seven (7) Standard Penetration Test (SPT) borings within the `project site area to a depth of 10 feet'below existing land surface (bls). • Core.through the existing pavement sections at four (4) locations with a diamond tipped core drill to ascertain the approximate thickness of the asphaltic surfacing and base course. i ;• Perform Dynamic Cone Penetrometer (DCP) testing within the upper portions of the selected SPT boreholes to help further determine soil consistencies. :, Secure samples of representative soils encountered in the soil. borings.for review, laboratory analysis and classification by a Geotechnical Engineer. • Measure the existing site groundwater levels and provide an estimate 'of the typical wet season high groundwater levels. Conduct soil gradation tests on selected soil 'samples obtained.in the field to help determine their"engineering properties. • Asses's the existing soil conditions with respect to the proposed construction. 2. �I 820. Brevard Avenue, Rockledge, Florida 32b55 (321) 638-0808 Fax (321) 638-0978 www.UniversalEngineerin,9.com - - i Oakland Lake, Estates Subdivision Universal Project No. 0330.1700052.0000 Fort Pierce, Saint Lucie County, Florida Preliminary Subsurface Exploration 4 Preparing a geotechnical engineering report which! documents the results of our preliminary subsurface exploration ,and laboratory testing program with analysis and general comments. 6.0 LIMITATIONS, Please note that this report is based on a preliminary subsurface exploration, program with the scope of services, general boring locations arid: depths as developed in conjunction with the client. The information. submitted in this report is based on data obtained from the soil borings performed at the locations indicated on the Boring Location. Plan and from other information'as referenced. This report has not been prepared to meet the full needs of design professionals, contractors, or any other parties, and any use of this.report by them without the guidance of the soil and foundation engineer who prepared it constitutes improper usage which could lead, to erroneous assumptions, faulty conclusions, and other problems. Thiss report does not reflect any variations which may occur across the site. The nature and extent of such variations may not become evident until the course of future explorations or actual construction. If variations then become evident, it will be necessary for re-evaluation of the -recommendations in this report after performing on -site observations during the construction period and noting the characteristics of any variations. Deleterious soils were not encountered at any of our boring locations; however, we cannot completely preclude their presence across the entire property. Therefore, this report should not'be used for estimating such items as cut and fill quantities. Our field exploration did not find unsuitable or unexpected materials -at the time of occurrence. However, borings for a typical geotechnical report are widely spaced and generally not sufficient for reliably detecting the presence of isolated, anomalous :surface or subsurface conditions, or reliably estimating unsuitable or suitable material. quantities. Accordingly, Universal does not recommend relying on our boring information to negate presence of anomalous materials or for estimation of material quantities unless our contracted services specifically include. sufficient exploration for such purpose(s) and within the reportwe so state that the level of. exploration provided should be sufficient to detect such anomalous conditions or estimate such quantities. Therefore, Universal will not be responsible for any extrapolation or use of our data by others beyond the purpose(s) for which it is applicable or intended: AII users of this report are cautioned that there was no requirement- for Universal to attempt to locate any man-made buried objects or identify any other potentially hazardous conditions that may exist at the site during the course of this exploration. Therefore no attempt was made by Universal to locate or identify such concerns. Universal cannot be responsible for any buried man-made objects or environmental hazards which maybe subsequently encountered during construction that are not discussed. within the text of this report. We can provide this service if requested. F,or a further description of the scope and limitations of this reportplease review the document attached within Exhibit 1 "Important, Information About Your Geotechnical Engineering Report" prepared by GBA/The Geoprofessional -Business Association. 3 -- 820 Brevard Lenue, Rockledge, Florida 32955 (321) 638'-0808 Fax,4(321) 638-0978 www, UniversalEngineering.com Oakland Lake Estates Subdivision Universal Project No. 0330.1700052.0000 Fort Pierce, Saint Lucie County, Florida Preliminary Subsurface Exploration 7.0 FIELD METHODOLOGIES 7.1 STANDARD PENETRATION TESTS The seven (7) SPT borings, designated B1 through B7 on the attached Figure No. 1, were performed in general accordance with the procedures of ASTM D 1586 (Standard Method for Penetration Test and Split -Barrel Sampling of.Soils). The SPT drilling technique involves driving a standard split -barrel sampler into the soil by a 140 pound hammer, free falling 30-inches. The number of -blows required to drive the sampler 1 foot, after an initial seating of 6 inches, is designated the penetration resistance, or N-value, an index to soil strength and consistency. The soil samples recovered from the split -barrel sampler -were visually inspected and classified in general accordance with the guidelines of ASTM D. 2487 (Standard Classification of Soils for Engineering Purposes [Unified Soil Classification System]). - The SPT soil borings were performed with a CME 45 ATV mounted drilling rig. Universal located the test borings in the field by using the provided site plan and by plotting in the field with a Garmin GPS receiver. No survey control was provided on -site, and our boring locations should be considered only as accurate as implied by the methods of measurement used. The approximate boring locations are shown. on the attached Figure No. 1. 7.2 DYNAMIC CONE PENETROMETER TESTS Dynamic Cone Penetrometer (DCP), tests were performed within the upper portions of the selected SPT boreholes to help further determine soils consistencies. The DCP tests were performed at 1 foot intervals in general accordance with the procedures developed by Professor G. F. Sowers and Charles S. Hedges (ASCE, 1966). The basic procedure for the DCP test is as follows: A standard 1.5 inch diameter conical point is driven into the soil by a 15-pound steel hammer falling 20 inches. Following the seating of the point to a depth of 2 inches, the number of blows required to drive the sampler an additional 1.75 inches is designated the penetration resistance, providing an index to soil strength and density. 7.3 PAVEMENT CORE SAMPLES Samples of the existing asphaltic pavement sections were obtained at four (4).core locations (Cl through C4) with a 4 inch nominal diameter diamond bit core drill, advancing .through the. asphaltic pavement into the underlying base course materials. Afterwards the core holes were backfilled and the surfacing patched with an asphaltic "cold patch" mixture and the core samples returned to our laboratory for subsequent examination. 8.0 LABORATORY METHODOLOGIES 8.1 PARTICLE SIZE ANALYSIS We completed #200 sieve particle size analyses :on seven (7) representative soil samples. These samples were tested according to the procedures listed ASTM D 1140 (Standard Test Method for Amount of Material in Soils Finer' than the No. 200 Sieve). In part, ASTM D 1140 requires a thorough mixing the sample with water and flushing it through a No. 200 sieve until all of the particles smaller than the sieve size leave the sample. - 4 820 Brevard Avenue, Rockledge, Florida 32955 (321) 638-0808_Fax (321) 638-0978 www.UniversalEngineering.com Oakland Lake, Estates Subdivision Universal Project No. 0330.1700052.0000 Fort Pierce, Saint Lucie County, Florida Preliminary Subsurface Exploration The percentage of the material finer than the No. 200 sieve- helps determines the textural nature of the soil sample and aids in evaluating its engineering characteristics. The -percentage of materials passing the #200 sieve is shown on the attached boring logs. 9.0 SOIL STRATIGRAPHY The results of our field exploration and laboratory analysis, together with pertinent information obtained from the SPT borings, such as soil . profiles, penetration resistance and stabilized groundwater levels are shown on the boring logs included in Appendix A. The Key to Boring Logs, Soil Classification Chart is' also included in Appendix A. The soil profiles, were prepared from field logs after the recovered soil samples were examined by a Geotechnical Engineer. The stratification lines shown on the boring logs represent the approximate boundaries between soil types, and may not depict exact subsurface soil conditions. The actual soil boundaries may be more transitional than depicted. A generalized. profile of the soils encountered at our boring locations is presented in the following Table II. For'more detailed soil profiles, please refer -to the attached, boring logs. TABLE II GENERALIZED SOIL PROFILE Depth ( Encountered_ (feet, bls)' ! Approximate Thickness, 1 ' (feet) Soil Description ; r, Fill soils consisting of fine sands with varying quantities of silt, clay,' Surface 2 to 9 gravel, broken shelf, and clay lumps [SP, SP-SM, SC]; loose to. medium dense. Highly interlayered strata consisting of fine sands [SP], fine sands''( with silt [SP-SM], and clayey fine sands [SC], with varying.", 2 to 9 1+ to 8+ quantities of broken shell and occasional cemented rock layers; loose to dense. At boring location B2, the fine sand with silt [SP- SM] strata is partially cemented with iron oxide & organic salts and,; which is locally known as hardpan. NOTE: I I denotes Unified Soil Classification system designation. + indicates strata encountered at boring termination, total thickness undetermined.. 9.1 PAVEMENT CORE RESULTS The results of our examination and measurement.of.the core samples taken in the field from the existing .pavement sections are shown in the following Table III: 5. 820 BrJvard Avenue, Rockledge, Florida.32955 (321) 638-080il Fax (321) 638-0978 www.UniversalEng ineering.com r Oakland Lake Estates Subdivision Universal Project No. 0330.1700052.0000 For` Pierce, Saint Lucie County, Florida Preliminary Subsurface Exploration - - --- - _ - TABLE III PAVEMENT CORE RESULTS Approximate Thickness/Type Approximate Thickness I Boring/Core Location of Asphaltic Surfacing of Base Course Type of Base Course .Materials ' (inches) (Inches) 0.7 S3 C1 1.0-S3 8'/z Coquina - --- 0.8 S3 C3 i 1.0 S3 8 Coquina - - 1.6 S3 C4 1:0 S1 10 Coquina ------- — 0.7-S3 C2 1.1 S3• ' 8'/2 ' Coquina j 1.1 S3 -'1. See' attached Figure No. 1 for approximate core locatioris. 2. Classification of asphaltic IayenngS was pertOrmeq visually ana may not represent actual rUU I mix parameters: 3. Subgrade soils consist mostly of fine sands with traces of gravel &broken shell [SP] (i.e. stabilized � subgrade). , 10.0 GROUNDWATER CONDITIONS 10.1 EXISTING GROUNDWATER CONDITIONS ' We measured -the water levels in the, boreholes on May 2017 after the groundwater was allowed to stabilize. The groundwater levels are shown on the attached boring logs. The groundwater level depths ranged from 4.3 feet bls at .boring location B6 to 5:7 feet bl.s at boring. locations B2 and B7. Fluctuations.in groundwater levels sliould'be ahticipated'throughout the year, primarily due to seasonal variations in rainfall, surface .runoff, and other factors that may vary from the time the borings were conducted. 10.2 TYPICAL WET SEASON HIGH GROUNDWATER LEVEL . The typical wet season high groundwater level is 'defined as the `highest groundwater, level sustained for a period of 2 to 4 weeks during the "-wet" season of the year, for. existing site conditions, in a year with average normal rainfall amounts. 'Based. on historical data, the rainy season in Saint Lucie County, Florida is between June and. October of the year.jln order to.' estimate the wet season water level at the boring locations, many factors are examined, including the following: a.. Measured groundwater level b:. Drainage characteristics of existing soil types C. Season of the year (wet/dry season) d.. Current &historical rainfall data (recent and year-to-date), e. Natural relief points (such as lakes, rivers, swamp areas, etc.) f. Man-made. drainage systems (ditches, canals, etc.) ' g. Distances to relief points and man-made drainage systems- 6 820 Brevard Avenue, Rockledge, Florida 32955 (32;1) 638-0808 Fax (321).638-0978 www.UniversalEngineering.com Oakland Lake Estates Subdivision Universal Project No. 0330.1700052.0000 Fort Pierce, Saint Lucie County, Florida Preliminary Subsurface Exploration h,,, On -site types of vegetation i. Area topography (ground surface elevations) Groundwater level readings were taken on May 8, 2017; According to data from the Southeast Regional Climate Center and the National Weather Service, the total rainfall in the previous month of April for Central Saint Lucie County was 2.2 inches, approximately at:!thennormal levels for the month of April. ` Year-to=date rainfall for 2017 through May 8th was ,approximately 6Y2 inches, roughly 6 inches below the normal level for this time period. Based on this information and factors listed above, we estimate that the typical wet season high groundwater levels at the boring locations will be approximately 2Y2 feet above .the existing measured levels. Please note, however, that peak stage elevations immediately following various intense storm events, may be somewhat higher than the estimated typical wet season levels. Due to the variable silt and clay content within the near surface soils at this site, we. suspect that there may be occasional isolated pockets of "perched" groundwater throughout the project area, particularly during periods of prolonged wet weather.. These temporary perched water table levels may be higher than the estimated wet season high'groundwater levels indicated above. 11.0 LABORATORY RESULTS 11.1 PARTICLE SIZE ANALYSIS The soil samples submitted for analysis .were classified as, fine sands [SP]: Thepercentage of soil sizes passing the #200 sieve size are- shown on the boring logs at the. approximate depth sampled. 12.0 ANALYSIS AND GENERAL COMMENTS 12.1 PROPOSED BUILDING AREAS The removal of site vegetation and roots, along with other construction activities, will further loosen surficial soils to various depths. To provide a homogeneous, compacted, sandy soil system underneath the proposed foundations and floor slabs for - the proposed residences, densification of at. least the upper 2 'feet of the existing surficial, loose soils and `subsequent additional fill soils will be necessary. This should create a soil mat capable of dissipating the building loads over any remaining loose strata at depth. We believe that this can be effectively accomplished using conventional site preparation procedures including a comprehensive root .raking and stripping procedure to remove vegetation, root mats, debris and. organic topsoils; and then an extensive proof -rolling and densification program for the. surficial soils and subsequent structural fill. Assuming that such procedures are properly performed, we anticipate. that conventional, shallow spread footing foundations may be -,used to support conventional-one;to;two,,stJ6tV,residential construction; 7 810 Brevard Avenue, Rockledge, Florida 32955 (321) 631-0808 Fax (321) 638-0978 www.UniversalEngineering.com Oakland Lake Estates Subdivision Universal Project No. 0330.1700052.0000 Fort Pierce, Saint Lucie County, Florida Preliminary Subsurface Exploration 13.0 CLOSURE We appreciate this opportunity to be of service as your geotechnical consultant on this phase of the project and look forward to providing follow up explorations and geotechnical engineering analyses as the project progresses through the design ;phase. If you have any questions concerning this report or when we may be of any further service, please contact us. 8. I 820 Brevard Avenue, Rocl�ledge, Florida 32955 (321) 638-0808 Fax (321) 638-096 www.UniversalEngineering.com FI- i NO ® Approximate SPT Boring Location Note: Figure is based upon a Google Earth aerial Photograph. OAKLAND ESTATES SUBDIVISION HUMMINGBIRD WAY FORT PIERCE, INDIAN RIVER COUNTY, FLORIDA_ BORING LOCATION PLAN UNIVERSAL ; - - - ENGINEERING SCIENCES 0R+WN BY: C6 I DATE May, 16;,2017 CHECKED 5Y. zF DATE: Me 16.2017 -- -- -- - PR1WECTNOi - - - - - •- ,CALE: REPORT NO: PAGE NO V=_20W _ _ _0330.1700052'.0000+___— I� v1. I I ' APPN�DIX E°A "a ;PROJECT NO.: 0330.17000�F' .0000 UNIVERSAL. ENGIN:EERI:NG SCIENCES ;REPORT NO::. BORING LOG - _APPENDIX: A 1 PROJECT: Oakland Estates Subdivision BORING DESIGNATION: B1 SHEET: Oi 1 Hummingbird Way SECTION: TOWNSHIP: SOUTH RANGE: EAST Fort Pierce, Florida >. CLIENT- G,S„ELEVATION (ft): DATE STARTED: 514117 LOCATION: SEE BORING LOCATION PLAN WATER TABLE (ft): 4.6 DATE FINISHED: 514117 REMARKS: DATE OF READING: 518/2017 DRILLED BY: TM, R II MC EST. W.S.W,T. (ft): TYPE OF SAMPLING: J SLOWS j : p I m I ;' -- - 200 MC K I ORG. I W I PERK" 'I >, DESCRIPTION' (IN CONT.,: v INCREMENT i ,w p h) (�o) HR -- - - - - -- - - 4 _ fine SAND with traces of clay lumps (Fill), brown, [SP] 4.1 ' 7.4 �' I ' I. i i .'Y•Y.��Y I 'I .. '1 Q „5 f' fine SAND with gravel, broken shell, and clay lumps (Fill); I ...... brown, [SP] 2:T 10.6 ;�• 1 r 41 �' I I •.I ii� Y 'rr�' ,i 1 i I I I I, I clayey fine SAND with traces of broken shell (Fill), brown, [SC] i II 7-7.4 .I , 11 1 I: d r 7 I r r clayey fine SAND -with traces of o7ganlcs, dark brown, [SC] :24: BORING TERMINATED AT 10' y 1 I J. 2 c 2 u PROJECT NO.: 0330.171 UN,IVE.RSAL'IeN:GINEERING SCIENCES, REPORT NO.:. BORING LOG - - - APPENDIX: A PROJECT: Oakland -Estates Subdivision BORING DESIGNATION: B2 SHEET: Hummingbird Way SECTION: TOWNSHIP: SOUTH RANGE: EI Fort Pierce, Florida CLIENT. LOCATION: SEE BORING LOCATION PLAN REMARKS: 1 G.S. ELEVATION (ft): DATE STARTED: : 5/4117 WATER TABLE (ft): 5.7 DATE FINISHED: 514117 DATE OF READING: 5/812017 DRILLED BY: TM, RJIMC, EST. W.S.W.T- (ft): TYPE OF SAMPLING: I IL aeLOW311 .� �• m Q--- .Z00 MC K ORG. n y INCREMENT " z N ; DESCRIPTION l l�) (i) cIONr '. 1 'I ;' r _o , ' HI R.) Q- - - - -- -- - — - fine SAND with traces of clay lumps (Fill), brown- [SP] 'I : i': {:,<,t 1 3:0 5.0 I 5�-16 i 6" .tj i � II � t I i •i �I ttt,z � I fine SAND, grey, [SP] - 17-R R' I'1 I 5 `• j I' j fine SAND with silt, dark brown, (hardpan) [SP-SM] I !I It' 1 i clayey fine SAND, brown, [SC] i III 6-7-8 15 I f !I •I I ��I I' � 'I i' 6-4-4 8 f . I I • ; ' clayey fine SAND with occasional cemented rock layers, grey, II I [SC] 10 3-5-7 12 . j -- - - - - - I +' BORING TERMINATED AT 10' . ! DYNAMIC CONE PENETROMETER (DCP) VALUES Y R - DENOTES REFUSAL TO PENETRATION WITH DYNAMIC CONE PENETROMETER. ! V I I - i -- - - - - -- - li I- - --- -- - -_ - - - -- ' C 'c 2 u II UNIVERSAL. ENI131 EERM SCIENCES BORING LOG' PROJECT: Oakland Estates Subdivision Hummingbird Way Fort Pierce, Florida CLIENT: LOCATION: SEE BORING LOCATION PLAN REMARKS: PROJECT NO.: ussu.in REPORT NO.�-_ APPENDIX: A BORING DESIGNATION: 63 —SHEET. 1 1MC I SECTION: TOWNSHIP: SOUTH RANGE. EAS G.S:, ELEVATION (ft): DATE STARTED: 614117 WATER TABLE (ft): 5.3 DATE FINISHED: 514117 DATE OF READING: 5/8/2017 DRILLED BY: TM, R EST..W.S.W.T.!(ft): TYPE OF SAMPLING: LU JOm me ORG.BLOWS o PER 8" -4 LU DESCRIPTION •20 (%i IRINCREMENT H C`NT_ ,IIK o) 1 fine Sn AND with silt and traces of clay lumps (Fill), brow, ; IS P- M] II II 1-5-5 5" I r • f` 'ti If r 71 9-23-28 23" 5-18-20 18"''' it ;y.. • I q fine SAND, dark brown, [SP] f I f .I I 1 ... ......: i 5-6-7 '13 1.}Fr• I� 4.5 18.3 c \ +�'' : • fine SAND with silt, brown, [SP-SM] 879 16 i. I .L: I I fine SAND, grey, [SP] 5-7-8 I� 15 3.9 19.5 10 y I BORING TERMINATED AT 10' i i' 1 ' DYNAMIC CONE PENETROMETER (DCP) VALUES I ;' Ili j jJ 1'CE! L .2 0330.170005400( PROJECT NO.: 1UNIVERSAL ENGINEERING SCIENCES BORING LOG -REPORT NO.;IlAPPENDIX: A PROJECT: Oakland Estates Subdivision BORING DESIGNATION: B4SHEET: 0 Hummingbird Way SECTION: TOWNSHIP: SOUTH RANGE: EAST Fort Pierce, Florida CLIENT. S, ELEVATION (ft)- DATE STARTED: 5/4117 LOCATION: SEE BORING LOCATION PLAN WATER TABLE (ft): 5.1 DATE FINISHED: 5W17 REMARKS: DATE OF READING: 61812017 DRILLED BY: TM, RP MC EST. W.S.W.T. (ft): TYPE OF SAMPLING: I LU _j BLOWS Pr=R 6" 0 -201C I MC K ORG. � j h3 ti: 0 INCREMENT] (9 . DESCRIPTION - (%)hi (INJ HR.) CONT.,, I%) fine SAND with sift; gravel, broken 'shell,- -and clay lumps (Fill brown, [SP-SM 3-18-29 18* 11-21-25 21*,. Ii 3-23-30 23* I;r ; : � i � ' �' I ri i I dfine SAND with silt, dark brown, (SP-SMI 7- 8-12-14 "46 14-12-15 27 fine SAND with silt and broken shell, brown, jSP_SM] 14-16-16 32 1014-12-10 22, ........... ......... it BORING TERMINATED AT 10' DYNAMIC CONE PENETROMETER (DCP) VALUES j! j) ac 2 q v PROJECT NO.: 0330.17000 I .0000 }- I' ` UNIVERSAL `ENG:INEERING SCICES EN BORING LOG IREPORTNOi; I 1 - I 1 i ' ' I I I •APPENDIX: _- A --- PROJECT: Oakland Estates Subdivision BORING DESIGNATION: B5 SHEET: O'r$ Hummingbird Way SECTION: TOWNSHIP: SOUTH RANGE: EAS�I Fort Pierce, Florida CLIENT: LOCATION: SEE BORING LOCATION PLAN REMARKS: G.S. ELEVATION (ft): WATER TABLE (ft): 4.6 DATE OF READING: 5/812017 EST. W.S,W.T. (it): DATE STARTED: 514117 DATE FINISHED: 5l4/17 DRILLED BY: TM, R II MC TYPE OF SAMPLING: ' BLOWS W j t- "i, J m K ORG. LU PER 6" 3 W II DESCRIPTION Z00 MC pNr coNr,, n la yl INCREMENT Z w i 3 a !' (%) (�) '' HR.){%) i 0- ti rti' ! fine SAND with traces of gravel, broken'shell, and clay lumps (Fill)r brown, [SP] 3.4 2.4 8-R R" ,I 1 2-21-R 21' I I' 20-20-18 38 fine SAND with silt and traces of broken shell„ gray, {SP-SM] .I � I, i 1� ,i I ',,'•# � i t i� �I I� I 10-9-6 1 15I11 h,. I Y. I ,I I I � •L?� I I MORING TERMINATED AT10' I , I "DYNAMIC, "CONE PEN. ETROMETER<'(DCP) VALUES R,� DENOTES'.REFUSAVTO FENETRA, ON WITH DYNAMIC I ' -i � ; � i I' I �CONE'PENETROME7ER:, I, I• i� I II it i JI it • � 1I 0330.170005�+UOt)0 UNIVERSAL�ENGINEERIN_G SCIENCES BORING LOG REPORT REPORT NO.,[ • II - - _-- ` APPENDIX: A - PROJECT. Oakland Estates Subdivision BORING DESIGNATION: BIS SHEET: O il Hummingbird Way SECTION: TOWNSHIP: SOUTH RANGE EAST Fort Pierce, Florida CLIENT: G.S. ELEVATION (ft): DATE STARTED: 514117 LOCATION: SEE BORING LOCATION PLAN WATER TABLE (ft): 4.3. DATE FINISHED: 514117 REMARKS: DATE OF READING: 51812017 DRILLED BY: TM, RPJ MC EST. W;S.W.T. (ft)-. TYPE OF SAMPLING: II x ;i '�' ; �. a BLOWS ' -9 r O m J -i ' -260 MC K ORG. It Q PER6" I 3 } DESCRIPTION '; I (INd CONT., j j c - w - - INCREMENT - - - z i; -- - — m g;i ❑ - - - - I, (�� ii. lyl HR.) (6) i fine SAND with slit and traces of clay lumps (Fill), brown, f [SP-SM] 17-20-25 20• I j � fine SAND. gfey, [SP] 5-19-21 19" o •� •' Ir, �¢iri II � I. •`•F� ' � I -- - - I it 'I `' I clayey fine SAND, grey, [SC] r 4-8-6 I 14 II f it Ir ' I 6-6-6 12 I I. I, _ - 10 .. j; BORING TERMINATED AT 10` DYNAMIC CONE PENETROMETER ' (DCP) VALUES I R - DENOTES REFUSAL TO PENETRATION WITH DYNAMIC CONE PENETROMETER. • I I 'i UNIVERSAL ErNGINE'ERING SCIENCES iPROJECTNO.: _ 0330.17000521000D' BORING LOG iREPORTNO.: _--- II- - I }APPENDIX' A 11 PROJECT: Oakland Estates Subdivision Hummingbird Way Fort Pierce, Florida CLIENT: LOCATION: SEE BORING LOCATION PLAN REMARKS: BORING DESIGNATION: B% SHEET. Oi 1 SECTION: TOWNSHIP: SOUTH RANGE: EAST G.S. ELEVATION (ft): DATE STARTED: 514117 WATER TABLE (ft).- 9.7 DATE FINISHED: l 514117 DATE OF READING: 518/2017 DRILLED BY: TM, RPMC EST. W:S:W:T. (ft): TYPE OF SAMPLING: BLOWS_- ~ MC K ORG. w '� ;' PER a i; ;' �' a a t DESCRIPTION -200 ,� ,; . (IN.1 CONT., o t INCREMENT iy,) I') HR.) l 0) y I ' I� r; : • ; fine SAND with silt and clay lumps (Fill), brown, [SP-SM] I I � � � 11I7j� _�' I �;� • I I II 21-R R• I, rrI ,::•;' fine SAND. grey, [SP] 10-24-26 24`'I 1.6 3.4 It 14-R.J ...... ' ''I I. 7-7-7 I. 14 t.i f• I ;1'ti;• I, i t clayey fine SAND, grey, [SC] 3-5-6 11 i I' i I • 1., 11 1 I - 5-5-5 10 , I' BORING TERMINATED AT 10 t I I ' "DYNAMIC CONE PENETROMETER (DCP) VALUES II II d R - DENOTES REFUSAL TO PENETRATION WITH DYNAMIC _ t � i f 1 I I• CONE PENETROMETER. It I, I li •� I � Ir. ii p c �' I I 0 5 12 KEY TO,BORING ILOGS SOIL CLASSIFICATION CHART* Sand or Gravel [SP,SW,GP,GYV] FERSA' Sand or ravel with Silt UNIV or Clay'! M.SP-SC1 ENGINEERING 91;SCIENCES, 114 _C. S%or Cl :Sated>U or Gravel M,GC] (j) 0 0 z 50 Sandyy or Gra _ML._ M �,SVI4,"OL!0 u to I IL14 �or �lg doopmIl �4 Cp H EMENNOMMEN MENNEN 85 0 10 20 30 40 50 60 70 ' 80 go loo Silt LIQUID LIMIT 2Clayy [ M L,MH,CH,OL,OH] PLASTICITY CHART 100 .GROUP NAME AND SYMBOL. COARSE GRAINED SOILS FINE GRAINED SOILS HIGHLY ORGANIC SOILS WELL -GRADED SANDS ISM WELL -GRADED GRAVELS EGM INORGANIC SILTS (I SLIGHT PLASTICITY I ORGANIC SILTSICLAYS LOW PLASTICITY JOLI.- IMLI POORLY -GRADED SAND POORLY -GRADED GRAVELS [GPI. INORGANIC SILTY CLA Y LOW PLASTICITY (CL-MLI ORGANIC SILTSICLAYS J MEDIUM TO HIGH PLASTICITY [0H]" POORLY -GRADED SANDS WITH SILT. [SP-SM] -DSD GRAVELS POORLY-GRA WITH SILT' [GP -GM] INORGAN "C CLAYS j! LOW TO MEDIUM PLASTICITY ICLI PEAT, HUMUS, SWAMP SOILS WITH HIGH ORGANIC CONTENTS IPTI" POORLY -GRADED SANDSWITH CLAY P.-W! ISP -scl OOV 'P, RELY -GRADED L GRAVELS WITH CLAY [GP -GC] INORGANIC SILTS HIGH PLASTICITYIMHI� SILTY SANDS [SM] SILTY GRAVELS k I [GM] INORGANIC CLAYS HIGH PLASTICITY [CH], -RELATIVE DENSITY '(SAND AND GRAVEL) VERYLOOSE-0to4BIows/ft. CLAYEY SANDS [SC] CLAYEY GRAVELS [GC] 1 LOOSE - 5 to 10 Blowsift. MEDIUM DENSE - 11 to 30 Blowslft. DENSE .31 to 50 Slowslft. VERY DENSE - more than 50 Blomift. i 1 SILTY CLAYEY SANDS ISC-SMI IN ACCORDANCE WITH ASTM D 2487. UNIFIED SOIL CLASSIFICATION SYSTEM. CONSISTENCY (SILTANDCLAY) •LOCALLY MAY BE KNOWN AS MUCK. VERY SOFT-0 to 2'Blows]fL SOFT - 3 to 4 Slowslft. FIRM - 5 to 8 Slowsift. NOTES.- 8* -DENOTES DYNAMIC CONE PENETROMETER (DCP) VALUE STIFF - 9 to 16 Blows/ft. VERY STIFF - 17 to 30 Blowsift. HARD -more than 30 Blowsft. R -DENOTES REFUSAL TO PENETRATION P - DENOTES PENETRATION WITH ONLY WEIGHT OF DRIVE HAMMER NIE - DENOTES GROUNDWATER TABLE NOT ENCOUNTERED J, -N 41 NOTE: DUAL'.6'VMb'dL'6.,`ARE USED TO INDICATE BORDERLINE SOIL CLASSIFICATIONS, APPENDIX .1 eo ec: nic:a j n �neeri� ePOP The Geoprofessional Business Association (GBA) has prepared this advisory to help you- assumedly a client representative — interpret and apply this il geotechnical-engineering report as effectively as possible. In that way, clients can benefit from a lowered exposure`to the subsurface problems. that, for decades, -have been a, principal cause of construction delays,, cost overruns, claims, and disputes. -If you have questions or want more information about any of the issues discussed below, contact your GBA-member geotechnical engineer. Active Involvement in the Ge'oprofessional Business Association exposes'geotechnical engineers to a wide array of risk -confrontation -techniques that can be.of genuine, benefit for everyone, involved with a construction project. Geotechnical-Engineering Services Are Performed for Specific. Purposes,.Persons, and Projects i Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a given civil engineer will not likely meet the needs of a civil - works constructor or even a different civil engineer. Because'each geotechnical-engineering study is'unique, each geotechnical- engineering report is unique, prepared solely for the client. Those who rely on a geotechnical-engineering report prepared for a different client can be seriously misled. No one except authorized client representatives should rely on this geotechnical-engineering report without first conferring with the geotechnical engineer who prepared it. And no one - not even you - should apply this report for any purpose or project except the one originally contemplated: Read this Report in Full -Costly problems have occurred because.those relying on a geotechnical- engineering report did not read it in its entirety. Do not rely on an executive summary. Do not read selected elements only. Read this report in full. You Need to inform Your Geotechnical Engineer about 'Change ' Your geotechnical engineer considered unique, project -specific factors when designing the study behind this report and developing the confirmation -dependent recommendations the report conveys. A few typical factors include: - the client's goals, objectives, budget, schedule, and f risk -management preferences; - the general nature of the structure involved, its size, configuration, and performance criteria; the structure's location and orientation on the site; and - other planned or existing site improvements, such as retaCpiiig wails, access roads, parking lots, and undcifg ound utilities. - Typical changes that could erode the reliability of this report include those that affect: the site's size or shape; • the. function of the proposed structure, as when it's changed from a parking, garage to an office building, or from a light -industrial plant to a refrigerated warehouse; • the elevation, configuration, location, orientation, or weight of the proposed structure; the composition of the design team; or project ownership. As a general rule, always inform your geotechnical engineer of project changes - even minor ones - and request an assessment of their - impact. The geotechnical engineer who prepared this report cannot accept responsibility or liability far problems that arise because the geotechnical engineer was not informed about developments the engineer otherwise would have considered. r This Report May Not Be Reliable Do not rely on this report if your geotechnical engineer prepared,it: for a differe"nt client; • for a different project; • for a different site (that may or may not include all or a portion of the original site); or • before important events occurred at the site or adjacent to it; e.g., man-made events like construction oir environmental remediation, or natural events like floods, droughts, earthquakes, or groundwater fluctuations. Note, too,,that it could be unwise to rely on a geotechnical-engineering report whose reliability may have been affected by the passage.of time, because of factors like changed subsurface conditions; new or modified codes, standards, or regulations;or new techniques or tools. If your geotechnical engineer has not indicated an "apply -by'.' date on the report, ask what it should be, and, in general, ifyou are the least bit uncertain about the continued reliability of this report, contact your geotechnical engineer before applying it. A minor amount of additional testing or analysis - if any is required at all - could prevent major problems. Most of. the "Findings" Related in This:Report Are Professional Opinions . Before construction begins, geotechnical engineers explore a sites subsurface through various sampling and testing procedures. Geotechnical engineers can observe actual subsurface conditions only at those specific locations where sampling and testing were performed. The data derived from that sampling and testing were reviewed by your geotechnical engineer; who then applied professional judgment to form opinions about_ subsurface conditions throughout the site._ Actual sitewide-subsurface conditions may differ - maybe significantly - from those indicated in this report. Confront that risk by retaining your geotechnical engineer to serve on the design team from project start to project finish, so the individual can provide informed guidance quickly; wheneveI needed. r r This Report's Recommendations Are Confirmation -Dependent The recommendations included in this report — including any options or alternatives — are confirmation -dependent. In other words, they are not final, because the geotechnical engineer who developed them relied heavily on judgment and opinion to do so. Your geotechnical engineer can finalize the recommendations only after observing actual subsurface conditions revealed during construction. If through observation your geotechnical engineer confirms that the conditions assumed to exist actually do exist, the recommendations can be relied upon, assuming no other changes have occurred. The geotechnical engineer who prepared this report cannot assume responsibility or liability for confirmation - dependent recommendations if you fail to retain that engineer to perform construction observation. This Report Could Be Misinterpreted Other design professionals' misinterpretation of geotechnical- engineering reports has resulted in costly problems. Confront that risk by having your geotechnical engineer serve as a full-time member of the design team, to: • confer with other design -team members, • help develop specifications, • review pertinent elements of other design professionals' plans and specifications, and • be on hand quickly whenever geotechnical-engineering guidance is needed. You should also confront the risk of constructors misinterpreting this report. Do so by retaining your geotechnical engineer to participate in prebid and preconstruction conferences and to perform construction observation. Give Constructors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can shift unanticipated -subsurface -conditions liability to constructors by limiting the information they provide for bid preparation. To help prevent the costly, contentious problems this practice has caused, include the complete geotechnical-engineering report, along with any attachments or appendices, with your contract documents, but be certain to note conspicuously that you've included the material for informational purposes only. To avoid misunderstanding, you may also want to note that "informational purposes" means constructors have no right to rely on the interpretations, opinions, conclusions, or recommendations in the report, but they may rely on the factual data relative to the specific times, locations, and depths/elevations referenced. Be certain that constructors know they may learn about specific. project requirements, including options selected from the report, only from the design drawings and specifications. Remind constructors that they may perform their own studies if they want to, and be sure to allow enough time to permit them to do so. Only then might you be in a position to give constructors the information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Conducting prebid and preconstruction conferences can also be valuable in this respect. Read Responsibility Provisions Closely Some client representatives, design professionals, and constructors do not realize that geotechnical engineering is far less exact than other engineering disciplines. That lack of understanding has nurtured unrealistic expectations that have resulted in disappointments, delays, cost overruns, claims, and disputes. To confront that risk, geotechnical engineers commonly include explanatory provisions in their reports. Sometimes labeled "limitations," many of these provisions indicate where geotechnical engineers responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly. Geoenvironmental Concerns Are Not Covered The personnel, equipment, and techniques used to perform an environmental study— e.g., a "phase -one' or "phase -two" environmental site assessment — differ significantly from those used to perform a geotechnical-engineering study. For that reason, a geotechnical- engineering report does not usually relate any environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated subsurface environmental problems have led to project failures. If you have not yet obtained your own environmental information, ask your geotechnical consultant for risk -management guidance. As a general rule, do not rely on an environmental report prepared for a different client, site, or project; or that is more than six months old. Obtain Professional'Assistance to Deal with Moisture Infiltration and Mold While your geotechnical engineer may have addressed groundwater, water infiltration, or similar issues in this report, none of the engineer's services were designed, conducted, or intended to prevent uncontrolled migration of moisture — including water vapor — from the soil through building slabs and walls and into the building interior, where it can cause mold growth and material -performance deficiencies. Accordingly, proper implementation of thegeotechnical engineer's recommendations will not of itself be sufficient toprevent moisture infiltration. Confront the risk of moisture infiltration by including building -envelope or mold specialists on the design team. Geotechnical engineers are not building - .envelope or mold specialists. GEOPROFESSIONAL BUSINESS ASSOCIATION Telephone: 301 /565-2733 e-mail: info@geoprofessional.org wwwgeoprofessional.org Copyright 2016 by Geoprofesslonal Business Association (GBA). Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA's specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted onlywith the express written permis of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document or its wording as a complement to or as an element of a report of; kin(L. Any other firm, individual, or other entity that so uses this document without being a GBA member could be committing negligent