Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTPlanning & Development Services SCANNED Building & Code Regulation Division BY 2300 Virginia Ave Wde COV* Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION. SOIL TREATMENT r o.K �a t 3�15 PE MIT #.. JOB ADDRESS: BUILDER/CONTRACTOR: R04 C,.Ovu ,rr,-- e ; PE'I� T CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. PE T CONTROL LICENSE #: JB175775 We the .undersigned, hereby certify that we have pretreated the above described construction for subs erranean termites in accordance with the standards of the National Pest Control Association. Squ„ re feet if area treated: �`Chemicals used: DOMINION 2L of solution: .05% of Treatment: 3�10-ZoZ3 Total gallons used:: .7d Time of Treatment: ng Slab ,1st Treatment 1st Treatment —Re-Treat Re -Treat !wa Pools 1st Treatment �Re-Treat Other � pa �' 0 1st Treatment Re -Treat 1st Treatment Re -Treat . Perimeter for: Final. Inspection Signature of Exterminator Date There must be a completed form for each required treatment or re -treatment and this form must be on the job to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection FBC104,2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board sha l be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, pra'iding a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area tre. ted, chemical. used, percent concentration and number ofgallons used, to establish a verifiable record of protective treatment. Zf the soil chemical barrier method for termite prevention is used, final exterior treatment shall be, l ompleted prior to final building approval. Stl ucie County requires for the final'inspection for CO, a Permanent Sticker to be placed on th electrical panel box cover, listing all the treatments and dates of applications. 7/24/2014