HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTFrom fax5616880909 1.161.688.0909 Thu May 30 12:15:16 2019 MDT Page 1 of 1
SCANNED
BY
PR.
�!f i.l Il 1J
Lucie
St Lucie County Inspections
2300 Virginia Avenue
Ft Pierce, FL 34982
(722) 462-2172ot
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
# (Sn—C) I I. I JOB ADDRESS 2664
)ER GHO Homes
CONTROL CONTRACTOR ,HomeTeam Pest Defense, Inc.
CONTROL LICENSE # JF0001886
jg�'1-o 1 l I
FL
the undersigned, hereby certify that we have pretreated the above -described construction for subterranean
Res in accordance with the standards of the National Pest Control Association.
feet of area treated: 260
of solution:.50%
of treatment: 05/29/19
® ooting
®1 st Treatment
❑ Re -treat
❑ ' lab
❑ 1 st Treatment
❑ Re -treat
❑ ]Driveway
❑ 1st Treatment
❑ Re -treat
❑ ools
11 ❑ I st Treatment
❑ Re -treat
❑ 7ther
❑ 1 st Treatment
❑ Re -treat
Chemicals used: Sentricon Always Active HD
Total gallons used:
Time of treatment: AM
FBC104.2.6 Certificate of Protective Treatmentforprevendon of termites
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed, providing a copy far the person the poermit is iisued to and
another copy for the building permit files. The Treatment Cerfcate shall
provide the product used, identity of the applicator, time and date of the
treatment, site location, area treated, chemical used, percent concentration
and number ofgallons used, to establish a verifiable record ofprotective
treatment. If the soil chemical barrier method for termite prevention is used,
final exterior treatment shall be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications.
® terimeter for Final Inspection
Signature of exterminator
There must be a completed form for each required treatment or re -treatment and this form must be on the,
job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a
re -inspection fee charged