Mobile Home Tie Down Permit Checklist
Wh n you submit your building permit application for a tie -down of a Mobile Home, or Park Model, you should
u se the following checklist to determine if your application submittal is complete. Only complete applications will
be ccepted for processing. Please call our staff in Growth Management at 772-462-1553 if you have any
I.
IT
,M
HOW MANY?
COMMENTS
Building Permit
1 /
A completely filled out building permit application must be
Application
✓
submitted, including all required information and enclosed
forms. The application must be signed by the applicant and
notarized.
Notice of
1
A recorded Notice of Commencement for all construction with
Commencement
a value exceeding $2,500 has to be submitted at time of
building permit application.
permit Worksheets
2
Two (2) complete drawings showing all methods of tie -downs,
describing 3 way strapping, blocking, piers, anchor types,
locations, etc. Drawings to be of the exact unit being installed.
Detail each type of system to be used on plans. Installations
sheets and set-up manuals.
Set-up Manuals
2
Manufacturer's set-up and installation manual.
I
locking Diagrams
2
Provided by manufacturer.
��J
Surveys
Surveys are required for all building permits involving a
I lot Plans
primary structure, and for all accessory structures with a
construction value exceeding $10,000. The surveys must be
signed/sealed by a registered Florida surveyor. All-surveVs�s
must Abe stamped-by_.the-Health-Department_if a_septic'_p'er�nitis,
oUr survey equirement sheet
requir..ed -Please see for�specifc
rey.uirements ;__�„
Parking Spaces
The survey must show the location of the parking spaces.Two
8x18 parking spaces are required for Mobile Homes.
�1Subcontractor
1 each
One subcontractor agreement with original signature is
Ag
IIelement for Electric,
required for each subcontractor on the job. The building permit
P1
mbing & HVAC
cannot be issued until it has been determined that all
subcontractors are properly licensed and registered.
The use of unlicensed contractors is strictly prohibited.
TIE,
IIOW 1VIANI'?
COMMENTS:
FlIlled
Lands Affidavit
1
his form is required for all construction, except for interior
renovation. It must bear the original notarized signature of the
property owner. This affidavit serves to notify the property
owner of their responsibility not to adversely impact their
neighbor's properties with storm water drainage and runoff.
Penetrometer Test
1
Required with permit application, just be signed b the Tie -
down Contractor.
Stair Details
2
Must meet requirements for stairs and landings per FBC and
include anchoring details.
County Health
if you are planning to use a new or expanded septic tank, or if
Department Septic
you are adding bathrooms, you must first obtain Health
Tank Permit
Department approval for the system. WilNoor�nlans=anima ,1
Cfeysmlarislriiis bear�tl a orlglnalTlealth Depargmee
approval stamp;
ecorded Warranty
I
If the property has been purchased within the last six months,
Deed
our records may not yet be to date. In this case we must see a
recorded warranty deed in your name to verify ownership.
Flood Elevation
1
If your property is located within a designated flood zone you
Certificate
,�(
are required to file an original flood elevation certificate
signed/sealed by a Florida registered surveyor no later than 21
days following the pouring of the first habitable floor.
egetation Removal
I
All residential properties of any size and all commercial or -
Permit
industrial projects require a completely filled out vegetation
removal application. A specific plan for tree removal and
preservation is required. If you have any questions please
contact the Environmental Resource Department at 772-462-
2526.
Mobile Home
2
Must be prepared, signed and sealed by a Florida registered
Inspection Reports
professional engineer.
(r'or
relocation only)
Copy of Title
2
Copies of both sides of title are required. If multiple units,
(For
relocation only)
provide copies for all.
Additional information beyond that contained in the above checklist may be required in order to ensure a
complete review of your building permit application.
All impact fees will have to be paid at the time of permit issuance.
You are required to call for all inspections as indicated on your building permit and for a final inspection.