Loading...
HomeMy WebLinkAboutCONTRACT3121 Skyway Circle Suite Melbourne FL 32934 General ,s Group, Inc. POSAL SUBMITTED TO: SCANNED d� CEO°N�I`�R�AE Job Name: omer: � s., MA (�- C (y ,ocation: 5,76 1A-1 44gx ag �e S. C. -3 y F� te: 7 7 4 —F .2, Email: N%/a DESCRIPTION: Remove existing roofing and install new asphalt shingles ?le Color: - x Edge Color; TLAS PRISTINE PINNICLE: • Provide roofing permit • Provide trash removal to a legal off -site • Remove existing roofing down toZsh • Replace all bad decking ( billed at $80.00 each) • Re -nail deck as required by Hurr(Based on 553.844 F.S.) • Install ATLAS Summit 60 underl Office: (877)407-3535 Fax: (877) 756-0007 www.sou.theastcontracting.com CGC060247 . CCC1330002 Install all new valley metal 16" 26ga set in plastic roofing cement. (If required) 4In l new drip edge 3" x 3" aluminum l new Low Profile Ridge Vent/Cobra Ridge Vent Xl new exhaust vents (Galvanized) and lead boots 1 ATLAS PINNACLE STARTER SHINGLE l ATLAS PINNACLE PRISTINE PRO -CUT ATLAS PRISTINE LIFETIME 130 MPH SCOTCH GUARD SHINGLE $ ' ADDITIONAL ITEMS: • Install ATLAS Weather Master A underlayment in valleys Ld eaves $ • Install ATLAS Weather Master SA underlayment on entire deck $ (Recommended) Qualifies as a Secondary Water Resistance (SWR): SWR (also called Sealed Roof Deck) Self -adhering polymer modified -bitumen roofing underlayment applied directly to the sheathing or foam adhesive SWR barrier (not foamed -on insulation) applied as a supplemental means to protect the dwelling from water intrusion in the event of roof covering loss. • Install Atlas Gorilla Guard 30 Engineered Felt on entire deck $ FLAT ROOF: • Provide roofing permit • Provide trash removal to a legal off -site facility • Remove existing roofing dow to the wood deck • Replace all bad decking (sheets included additional sheets billed at $80.00 each) • Re -nail deck as required by Hurricane Mitigation Retrofit Manual (Based on 553.844 F.S.) Notes: , - . - ., Cam' ` e—A T • Install CERTAINTEED ALL WEATHER EMPIRE BASE/PLY • Install CERTAINTEED FLINTLASTIC-GTA CAP SHEET • Install new primed drip edge 3: x 3" aluminum with Matrix n 201 Premium SBS Flashing Cement • Install new metal 16" - 26ga set in Matrix " 201 Premium SBS Flashing Cement at sloop roof tie-in o O` IZ-4 5/1 G J 7-6 Sl .s1G WIND MITIGATION: (r a 1-)C, ok;-i- /= 5 ---qwast-General-GoatractGrs Group, -Inc. will provide aWindivlltigat' d ' ' nal-fee-of 0-75A0— T INCLUDED: ADDITIONAL ITEMS: Gutters Plywood: ...................................................... Cost $80.00 per sheet labor and material Metal fascia trim Fascia: ........................................................... Cost $18.801/f labor and material Metal roof structures Second layer removal; ................................ Cost $28.00 per square Satellite dish removal or replacement Chimney flashing: ...................................... Cost $225.00 plus stucco if required at $37.50 per s/f Screens and screen enclosures Flashing, step, counter or base: ................. Cost $17.251/f labor and material Solar heater removal or replacement Gutter removal: ........................................... Cost $ .50 Skylights Rafter tail repairs: ....................................... Cost $120.00 each Truss repair Skylight replacement and flashing:.......... Cost $475.00 each Stucco repair ............................................... Cost $37.50 per square foot GENERAL TERMS AND CONDITIONS Change Orders, contractor may accept a "change order" to the plans, specifications or equipment. In addition, the total price increased or decreased to reflect the change, and the same shall be in writing and signed by the Owner and Contractor. Any increase to the contract price shall be paid by the Owner upon ordering the work called for in such Changge order or upon execution of the change order as required by the contractor. Southeast General Contractors Group, Inc. is responsible for completion of work in compliance with contract documents and for quality of material and workmanship in accordance with standard specifications. Labor Warrantyty/5 year on workmanship. Material Warranty 30-year limited warranty. Same a Cash (SAC) Financing (3, 6,12,18, 24 months) options will require an additional upfront fee. Standard (1-12) gars financing is offered with no upfront fees. All financing is contingent upon credit approval. Standard Home Improvement financing offered from 9.99%APR for A and A+credit rating. Southeast General Contractors Group Inc, partners with EnerBank Improvement loans. Existing gutters will be removed or detached to allow for the installation of the new roofing system. Sourtheast General Contractors Gioup, Inc. will attempt to save the gutters but in the event they are damaaged the Owner accepts full responsibility for said gutters. Med at 580.00 each) t insta!t new Metai 16- - 26p settin lu1 k� 61 Re -nail deck as required by Hurricar T -,ligation Retrofit Manual Flashing Ce j � '—; at sloop roof tie-in (Based on 553.844 F.S.) tes:-��-- 1 �1 _0 ( ►��Ac ' / ZA T /2 0 00' �'�-- S.dG eal VIND MITIGATION: (J- a G o&,o- 7 a _50-Ap,--r< �Snut eases-Contrac-ers-Group, inc.-wiRTmvide m ltigat' D r nit fnr ��dd—t nal-fee-of-$1-75X0— INCLUDED: ADDITIONAL ITEMS: Gutters Plywood: ...................................................... Cost $80.00 per sheet labor and material Metal fascia trim Fascia: ............................................................ Cost $18.801/f labor and material Metal roof structures Second layer removal: ................................ Cost $28.00 per square Satellite dish removal or replacement Chimney flashing: ...................................... Cost $225.00 plus stucco if required at $37.50 per s/f Screens and screen enclosures Flashing, step, counter or base: ................. Cost $17.251/f labor and material Solar heater removal or replacement Gutter removal: ........................................... Cost $ .50 Skylights Rafter tail repairs: ....................................... Cost $120.00 each Truss repair Skylight replacement and flashing:.......... Cost $475.00 each Stucco repair ............................................... Cost $37.50 per square foot GENERAL TERMS AND CONDITIONS 1. Change Orders, contractor may accept a "change order" to the plans, specifications or equipment. In addition, the total price increased or decreased to reflect the.change, and the same shall be in writing and signed by the Owner and Contractor. Any increase to the contract price shall be paid by the Owner upon orddering the work called for in such Changge order'' or upon execution of the change order as required by the contractor. 2. Southeast General Contractors Group, Inc. is responsiblee for completion of work in compliance with contract documents and for quality of material and workmanship in accordance with standard specifications. 3. Labor Warranty/5 year on workmanship. Material Warranty 30-year limited warranty. 4. Same a Cash (SAC) Financing (3, 6, 12, 18, 24 months) options will require an additional upfront fee. Standard (1-12) yyears financing is offered with no upfront fees. All man is contingent upon credit approval. Standard Home Improvement financing offered from 999% APR for A and A+ credit rating. Southeast General on Group Inc. partners with EnerBank Improvement loans. 5. Existing gutters will be removed or detached to allow for the installation of the new roofing system. Southeast General Contractors Group, Inc. will attempt to save the gutters but in the event they are damaaged the Owner accepts full responsibility for said gutters. We I ereby propose to furnish labor and materials complete in accordance with the above specifications, for the sum of: $�V Sch Idule of Values: De i sit: Is due upon executing this contract. $ a �000 �� Dr #1: Is due when the roof is dried -in, before shingles are delivered. $ Draw #2: Is due upon the final inspection. $ 9 �0 00 v� All material is guaranteed to be as specified. All work to be completed in a workman like manner according to standard practices. Any alteration or deviation from above specifications involving extra cost, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements are contingent upon strikes, accidents or delays beyond our control. This proposal subject to acceptance within 10 days and is void thereafter at the option of the undersigned. ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are hereby accepted. You are authorized to do the work as specified. Payment will be made as outlined above. 1UTHORIZED* ACCEPTED-5 Date: / Signature• ✓ •,&r1 11#011726 Date 6 y out eat eneral Contractors Group, Inc. Signature• Date