HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT11I 21I2018 18: 50
770 JMGM PAGE 01
s-
RECEIVED
l�l AUG 2 4 1018
.fit, LuO. COU 72300 Virginia AvePierce FL 3t Permitting Departm� n`r StLucie Count-772-472 FaX 772-462-6443
PERMI' #:
'CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
7— 3 JO ADDRESS: �J�{3�O �Iu�dt't'�C
CT'OR:
PEST" qONTROL CONTRACTOR.
PE i" ONTROL INCENSE #: Z
We;�iithe ndersigned, hereby certify that
slb rra can termit In accordance with
Square f t if area tr4ated: 4)
Percenta a of solution: C�51?0_ ._
1-5' Trea
R6-Trez
Dr i eway
j in Trea
Re-Trea
Ot r .
is, Trea
l�
Re-Trea
Note; j 7%i must be a
site tolbe rcked up by
fee dr ro
have pretreatedthe above described construction for
standards of the National Pest Control Association.
Chemicals used: '-P01
Total gallons used:�-
Time of Treatment. ��
Slab
!nt 1"t Treatment
Re -Treat
Pools
!nt P Treatment
t
Perimete for Inspection
grit
Signatur R rminator
npleted form for ea required treatment or re-bvatment and this form must be on b'te jo¢ .
inspector at time of ch Inspecdon or the scheduled inspection w/ll fall and a re -Inspection
FBC10I4.
6 Cartificate
Of Protective Treatment
shall b'e
p
vlded to receive
duplicate Treatment
provld,I
COPY fc lr the
rson the permit 1$ iZi
Certif
ate
ha!/provlde t
ie product used, Idendi
treat
c
mical used,
errent concentration ar
Prot
ve
ement, If
he soil ohemica/ barrier
be co
�
Ip/e
d prior 60 Fi
l bullding approval.
St LUgle
I
oanty regolres
for the filial in
>r prevention ofterm/tes. A weather resistantjobsite postfnq board
errlflcates as each required protective treatment Is completed,
d to and another copy ror the bullding permit Arles ?he Treatment
of the app/kt►cbr, time and date of the treatment; site location, area
number ofgallons used, to establish a verlflable record of
7ethod for termite preventlon Is used Anal exterior treatment shall
for CO, 6 Permanent Sticker to. be placed on