Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORM5 + Date: y BY St. Lude G®11 n tw Planning & Development Services T =� Building & Code Regulation Division NTY 2300 Virginia Ave, Rm 201 • A Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method )'Ll c L Permit #: 0 � ; 14 S r: 0 4Z r Job Address: RECEIVED MAR U 4' 2010 F a permitting oaparO@rnnitting Department St. Lud@ 40mtY St. Lucig aunty Constr 1"ction: ( New Construction — Complete ( ) Existing — After Addition Houseinfiltration est esults SLC Climate Zone 2 CFM Test Date: Volum= s G ACH (SQ) = CFM (50) x 60 / Volume = "L • � Mechanical Ventilation required less than 3 ACH Passing %v results must be & ACH (50) or less Pass ( ) Fail i FBC, En ' The bui ding or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. -Testing shall be conducted with a blower idoor at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Sec tioni553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an approv d third party. A written report of the results of the test shall be signed by the party conducting the test and provid �d to the code official. Testing shall be performed at any time after creation of all penetrations of the building therm 1� envelope. FBC, R sidential Wherethe air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the d elling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. imaanv Name:y Address: (Q (b--7N W ( M LPSL FL I herly certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation requi4ments i ac ordancertfiy h Sectio0402.4.1.2 Climate Zone 2. Nami. A a Se lid L CcG' V av- #: UT— 50 6.02 S l, A. Date: 9 Contractor: Iq IPost Construction Test Planning & Development Services R Building &Code Regulation Division �wf LE COPY 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 perM,Itt/ 11B 772-462-2165 Fax 772-462-6443 SC 4t?c9 pe 4 tenr FBC ENERGY CONSERVATION CODE y Duct Sealing Certification Prescriptive -and Performance Method L/ Permit #: 7i L�� J L4� Lot #: —P Address: T-70 9 (.- D 6 b L-Q S4yr*4-, Dr. F f • P f,ef%cg ❑ Rough -in Test Test Conditions: IL41 I q Date: Time: (7 Indoor emperature (F): Outdoo j]Temperature (F): v Floor Area (ft2): Primary Location of Supply Ductwork C Primary Location of Return Ductwork )U Total LeaKage Test (Outsidel 2 Duct Leakage: ❑ DefauI ❑ Prop. Leak Free yProposed On = © 3 r t' Test Pressure: 5 (Pa) [)�Jtyx Baseline d,irct Pressure (optional) (Pa) ( M V, Company I hereby a Section R, Signature: Printed W, Flow Ring Fan Press Flow (cfm) Results: 4 Pass ❑ Fail Installed Pa , ` r Total Leakage (cfm): Total Leakage per 100 sgft: • ��^ CFM25 x 100 divided by the CFA = Duct Leakage CFW100 sqft. coy Cv. PS / FL Address: (l� o /J m m k the abovq Duct Sealing eakage results demonstrate compliance vrith 5'" Edition FBC Energy Conservation requirements in accordance with ` VLicense/Certfcate #: L �� (� '9