Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENT7�y Planning & Development Services F Building & Code Regulation Division . 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 �aY6 JAN 0 2 2019 -T. L"j', G(lunty, Permitting CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT PERMIT 'i : �'�' JOB ADDRESS: ?F1 BUILDER/CONTRACTOR: _ D, fl'234� PEST CO PEST CO OL CONTRACTOR: L LICENSE #: -,Y+a)9 __'1'6_' We, the undersigned, hereby certify that we have pretreated the above described construction for subterranea � termites in accordance with the standards of the National Pest Control Association. Square feet 1f area treated: Percentage ; f solution: Date of Tre it ment: II 1st Treatment Re -Treat Drive 'ay 1st Treatment J Re -Treat Other 'I lst Treatment Re -Treat Note: There site to be pic fee charged. FBC104.2.6 shall be pro vie providing a cc Certificate shy treated, chem protective tre, be completed St Lucie Co the electric Revised 7/24/20 Chemicals used: Ro(-a6aLof Total gallons used: 2— Time of Treatment: Slab 1st Treatment Re -Treat Pools 1st Treatment Re -Treat Perimeter for Final Inspection Signature of Exterminator Yate ,t be a completed form for each required treatment or re -treatment and this form must be on the job up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection �rtificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board d'to receive duplicate Treatment Certificates as each required protective treatment is completed, v for the person the permit is issued to and another copy for the building permit files. The Treatment provide the product used, identity of the applicator, time and date of the treatment, site location, area al used, percent concentration and number of gallons used, to establish a verifiable record of 77ent. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall rior to final building approval. city requires for the final inspection for CO, a Permanent Sticker to be placed on i panel box cover, listing all the treatments and dates of applications.