Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTf ,i l ede & TESTING INC. 250 SW 13th A II Pompano Beach, FL 33069 i ral SCANNED BY SM Lucie COUMV, d`-a3s`3 Phone 954.784.2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com riela uensity rests of Compacted Soils Method D-6938 Project: Address: Proposed Residence Lot 37, Creekside 8705 Date: September 21, 2018 Cobblestone Drive, Fort Pierce, FL Order #: 18DR842 Area Tes ed: Building Pad Permit #: Material, ype: Brown Sand with Traces of .Shell Tech: BK Client: D.R. Horton, Inc. Address: j 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method• ASTM 11-1557 Test # of it TEST LOCATION Probe Depth Elev. Moist ..%. Dry Density PCF Proctor Value `PCF Optimum Moisture %' ` _ Compaction Pass 1 2 3 JCe'Ilter of BuildingPad ISaCorrer of building Pad NE (Corner of Building Pad 12" 12" 1211 FL FL FL 6.0 1 6.8 6.1 105.9 105.0 105.7 106.0 106.0 106.0 14.0 1 44.0 14.0 99.9% 99.1% '99.7% Yes Yes Yes 4 �I 5 I 6 .7 8 II 9 l 10 i 11 12 III 13 14 Remar IS: See Reverse Side (Pa e 2 2% f Add ' 9 er Ittonal Information for Disclaimer This is a Compaction. Test only on the top 12" of the pad and is, not a verification of S911 Beari ci, Capacity. Legend f rElevation: - PR = Pro froll 1,2,3 = 1 st, 2nd, 3rd Lift Submitted by: SL = Sph gline FL = Final Lift Keith LeBIanC SG = Su (grade BG =Below Grade Federal Eng ne6ring & Testing. Inc. BC = Ba I6course BOF = Bottom of Footing Florida Reg: Ivo: 59394 TOP = T',p of Pipe FG = Finished Grade Certificate'c,,Authorization_45471 As a mutu protection to Clients, the public and ourselves, all reports are submitted as the confidential property of clients, aiid outhortza0on for publication of sf6ienibnts. conclusion for extracts from cr regarding our reports is reserved pending our written approval. A density test determines the degroe.ofCornpaction of the teste,( layer ;f material only. t den ity does nol replace a loll bearing capacity determination. These density tests do not certify the underlying soli materials glow the propdted structure: flie results do not prec Ude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soil'will sup portthe.Rroposed structure without sett ement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to ir!jf sblliiyof.ihe underlying soll to supp rt the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on im. work. I PAGE 1 of 2. edera"l & TESTING INC. 250 SW 13th Avel�ompano Beach, FL 33069 RECEIV'D NoV - I f1LI Phone 954-784-2941 9 Fa 9 75 W.d ng.com Field Density Tests of C metctg�j jl d �L69 8 Project: 11 Proposed Residence Lot 37, Creekside e: September 21, 2018 Address: 8705 Cobblestone Drive, Fort Pierce, FL Id: Order #: 18DR842 Area Test Building Pad Permit #: 07 =0-3573 Material T pe: Brown Sand with Traces of Shell i Tech: BK . Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # II TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture /o Compaction Pass 1 Cen er of Building Pad 12" FL 6.0 105.9 106.0 14.0 99.9% Yes 2 1 SW Corner of Building' Pad 12" FL 6.8 105.0 106.0 '14.0 99.1 % Yes 3 NE I orner of Buildi ng Pad 12" FL 6.1 105.7 106.0 14.0 99.7% Yes III4 5 i 6 I 7 8 I 9 II 10 11 12 l 13 14 Remar '�: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of S 'I Bearipig,Capacity. Legend f it Elevation: PR = Pro froll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:_� SL = Spri gline FL = Final Lift Keith LeBlanc P:E: - SG = Su grade BG = Below Grade Federal Engineering & Testing,Jne. BC = Ba ecourse BOF = Bottom of Footing Florida Reg: No. 59394 " TOP =Tip of Pipe FG = Finished Grade Certificate cf Authorization.#547.1. As a mutu protection to clients, the public and ourselves, all reports are submitted as, the confidential property of clients, and authorization for publication of statements, conclusion for extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of ornpactio_ n of the tested laye;of r. kerial only. A de ity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed swcture Th2'results do not prec de or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying oiluNill support tfie prdposed structure without se ment. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to eyalus'to; hei�ultdbility of the underlying soil to sup p rt the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this,work. i PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer: Pursuant to your request, Federal "Engineering"`&_Testing,. •Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was "to- determine the degree of compaction of the tested I layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing Ithe top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. I� Environmental analysis of the soil- materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing ran environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of, the•tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. III Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions only other areas or dates: Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. I It has been a pleasure working with you and we look forward to doing so in the near future. • II Page 2 of 2 RECEIVED A13th �� OCT 3 1.2010 Aermltt(ng Department & TESTING INC. St, Lucie County 250 S13Ave�rompano Beach, FL 33069 Project: Address: Area Tes Material' Client: Address: 870 d: Building -Pad na• Rrnwn SanH with Trarrac of Shall � r ■ 1 D.R. Horton, Inc. 1430 Culver Drive NE Palm Bay, FL 32907 Compaction Req.: .Proctor Method: Field Density Tests of Compacted Soils Method D-6938 Residence Lot 37, Creekside Date; Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com September 21, 2018 5 Cobblestone Drive, Fort Pierce, FL Order #: 18DR842 95% ASTM D-1557 Test # TEST LOCATION Probe Depth p Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Cen I, I er of Building Pad 12" FL 6.0 105.9 106.0 14.0 99.9% Yes 2 JSW JCorner of Building Pad 12" FL 6.8 105.0 106.0 14.0 99.1 % Yes 3 NE . ii orner of Building Pad 12" FL 6.1 105.7 106.0 14.0 99.7% Yes 4 II 5 � 6 7 II 8 9 10 11 12 lil 13 14 j Remark See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer I This is a Compaction Test only on the top 12" of the pad and is not a verification of SoilplBearing Capacity. Legend f 1 Elevation: PR = Pro lfroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: AA SL = Spri gline FL = Final Lift Keith $BI Lnc, P.E. / SG = Su rade BG = Below Grade Federa!`Engineerng F� Testing, Inc. 7/2 y1 BC = Bas''II course BOF = Bottom of Footing Florida Reg _blo. 55394 TOP = Td,� of Pipe FG = Finished Grade ' Certificate of Authorization i #5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients,:and,,authorization-for publication-�"- conclusions r extracts from or regarding our reports is reserved pending our written approval. A density tgst"deterrnines the d6�ee of compact'on of the t--' only. A den, ty does not replace a soil bearing capacity determination. These density tests do not certify the underlying, soil- materials below the pro; oser do not preci�i de or guarantee that future settlement and cracking will not occur. A soil boring test is requirg- tc. certify that tiie ur�ledying soils will shpport th without settl ment. If no soil borings have been performed to verify the underlying soils, we recommend that sUil;borings be performed to evaivate the suitab\ soil to supp rt the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms; retesting rnust be performed on,:his viork. PAGE 1of2 Compacted toS '11ls Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has- performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring .test must be performed by the'client prior to construction to verify subsoil conditions. Our scope of services only included testing Ithe top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing. of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. lil Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we'can provide a proposal for performing.an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of,thel'tested layer of material only. No other analysis is implied or warranted. 6 Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. I� Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on';other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. I; As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2