Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORMDate: Job Planning & Development Services �r Building & Code Regulation DivisioriJ mm' s' NTY 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM RECEIVED House Infiltration Test Certification Sr �U MAR Z019 Prescriptive and Performance Method I e coUnt4 parml 117® l$ (q Permit #: t .3 or: !ss: Co b bt.e. sdn%'_Q_ Dv-- ;ion: (� ) New Construction — Complete ( ) Existing —After Addition Housdl Infiltration Test Results SLC Climate Zone 2 CFM 60) = D Test Date: Volume = 0 5 ACH ( 0) =CFM (50) x 60 / Volume = V Mechanical Ventilation required less than 3 ACH Passing results must be & ACH (50) or less (yj Pass ( ) Fail FBC, E "ergy The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blowe�l door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Sectio 553.993(5) or (7), Florida Statutes or individuals licensed asset forth in Section 489.105 (3)(f), (g) or (i) or an appro , ed third party. A written report of the results of the test shall be signed by the party conducting the test and provic(ied to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermlla! envelope. FBC, Residential When the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a press Ire of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the d y, elling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Testin"a Company %T / rc�vjn r IQ Ft Company Name: v Address: 42 b�N W pno4 c Y j (fI/• " �L I herdiby certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation regwjement it accordajKe with Aection R402.4.1.2 Climate Zone 2. Signature: Name: Sore 7,CCUI 0-V'-e. #: U :L '�_0 6.12 4L Date: Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 772A62-2165 Fax 772-462-6443 ECEIV FBC ENERGY -CONSERVATION CODE MAR 18 2019 Duct Sealing Certification Prescriptive and Performance Method ST,Clq��#�� Permit#: �U jLot#: DK `� c `T�(\ Address: �74 I 0o b. D k S 4n4E. Ar- ,Fl - NY- 60— 1: Post Construction Test ❑ Rough -in Test Test d'onditions: nn Date: ' l�+ (` 1 // Time:1 c Indoor Temperature (F): `7 12 Outdoor Temperature (F): !1 Duct Leakage: ❑ Default, J (Pa) ❑ Prop. Leak Free Test Pressure: of( Baseline Duct Pressure (optional) (Pa) Duct Press. (Pa) I Flow Rinu I Fan Press Floor Area (ft2): Primary Location of Supply Ductwork Primary Location of Return Ductwork On=d,v3 i Results: Pass ❑ Fail Total Leakage (cfm): ^^� Total Leakage per 100 sgft: oL G�lv� CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sgft. TestinglCompanv r `/ Compa�Lert' (y Name: Address: & C)-7 �J� c m m O a kr Y �v R�L FL 1 herebat the above uct Sealin Leakage results demonstrate compliance with 5'" Edition FBC Energy Conservation requirements in accordance with Section R40 .2. Signature-... IL 2_Printed