- - Field Density Tests of Compacted Soils Method D-6938
Project: „Proposed Residence Lot 42, Creekside Date: December 7, 2018
Address: j 8741 Cobblestone Drive, Fort Pierce, FL Order #: 18DR1070
Area Tested: Building -Pad Permit #: 67 °-d
Material T;� pe: Dark Orangish Gray Sand with Some Shell Tech: TS
Client: D.R. Horton, Inc.
Address: 1430 Culver -Drive -NE Compaction Req.: 95%
Palm Bay; FL 32907 Proctor Method: ASTM D-1557
Test
#
�III�
TEST LOCATION
Probe
Depth
p
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NW iorner of Building Pad
12"
FL
10.0
109.8
113.5
11.0
96.7%
Yes
2
1 Cenjr
of Building Pad
12"
FL
9.9
112.1
113.5
11.0
98.8%
Yes
3
SE G„�
rner of Building Pad
12"
FL
10.1
111.7
113.5
11.0
98.4%
Yes
4
ICI
5
Ili
6
7
II
8
I
9
II
10
it
11
Ili
12
I�
13
l
14
Remarks: iJ8ee Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
�j his is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Bearing Capacity.
Legend for El( 11�ation:
PR = ProofrolI 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: ,a -a d�o
SL = Springlin FL = Final Lift Keith l-eBialic, P.E.
SG = SubgraA BG = Below Grade Federal Engineering & Testing,
BC = Baseco ,else BOF = Bottom of Footing Florida,Reg. No ,593cv4,,.
TOP = Top of. ipe FG = Finished Grade Certificate of Authorization #5471 -
As a mutual prate tion to clients, the public and ourselves, all reports are submitted as the confidential property of cilei nts, and aLuthgrizat:om?for publication bf statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of,theJested layer of
material only. A dAsity does not replace a soil bearing capacity determination. These density tests do not certify the underying so!.' materials below th? proposed structure.
The results do no preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required t¢'ceftify ihat-the "'underly n(r 5ofis` will support the
proposed structur , without settlement. If no soil borings have been performed to verify the underlying soils, we recommend`i6t,�oil borings he ,o6rfor, ed to evaluate the
suitability of the underlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain, rms;i66sting must be performed on this
work.
PAGE 1 of 2
Compacted Solis Method D-6936 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of
the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of
supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil
materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of
the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to
verify the underlying soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are.
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities,
excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and
re -tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Q_ 1
Page 2 of 2
J edera I Phone:954-784.2941
I
E-Fax: 954.784.7875
®ngineeriing admin@fed-eng.com
www.fed-eng.com
®+ esting, Inc..
Field Density Tests of Compacted Soils Method D=6938
Project: Proposed Residence , Lot 42, Creekside Date: December 7, 2018
Address: 8741 Cobblestone Drive, Fort Pierce, FL Order #: 18DR1070
Area Tested: Building Pad Permit #:
Material Type: Dark Orangish Gray Sand with Some Shell Tech: TS
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.:
Palm Bay, FL_ 32907 Proctor Method:
95%
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
p
. Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
,
Compaction
Pass
1
NW
1 orner of Building Pad
12"
FL
10:0
109.8
113.5
11.0
96.7%
Yes.
2
Cent
r of Building Pad
12"
FL
'9.9
.112.1
113.5
11.0
98.8%
Yes
3
ISE J,11Inrller
of Building Pad
12"
FL
10.1
111.7
113.5
11:0
98:4%
Yes
4
5
6
7
8
9
10
,I
j
11
12
13
14
------------
KemarKs: See Reverse Side Pa e 2 of 2 for Additlotial Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a .verification of Soil Besb&xoaarS••..
�I
Legend for E iwation: A
94 � 0
PR = Proofro 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
y����
SL = Springlinie FL = Final Lift Keith LeBlanc, P.E. ;� T Wp/f i
SG = Subgra a BG = Below Grade Federal Engineering & T
BC = Baseco I rse BOF = Bottom of Footing Florida Reg. No. 59394 •' �` ®RIO,' `N- ;•
TOP = Top o,#1Pipe FG = Finished Grade Certificate of Authorization-#5 ,tOW� _ 0P "
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of stalements,
conclusions or a,tracts from or regarding our reports Is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of
material only. A density does not replace a soil bearing capacity determination. These density tests do not certify.the underlying soil materials below the proposed structure.
The results do nQat preclude or guarantee that future settlement and cracking will not occur. A'soil boring testis required:to certify that the underlying soils will support the
proposed structurje without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the
suitability of the J° derlying soil to support the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this
work.