Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST'E RECEIVED ederaLude oun flu 3 1 201E 8 TESTING INC. 250 SW 13tilAve Pompano Beach, FL 33069 Permitting Department St. Lucie Counh, Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com Field Density Tests of Compacted Solis Method D-6938 Project, Proposed Residence Lot 35, Creekside Date: October 5, 2018 Addres : 8649 Cobblestone Drive, Fort Pierce, FL Order #: 18DR892 Area Tested: Building Pad Permit #: f-@ 7 - 6 Materia. Type: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. FILECQ'P'y Addres : 1430 Culver Drive NE Compaction Req Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Elev. Moist Dry Density Proctor Value Optimum Moisture Compaction Pass Depth p % PCF PCF % I 1 Cehter of Building Pad 12" FL 7.1 106.2 107.3 14.0 99.0% Yes 2 1 N ,I Corner of Buildin Pad 12" 1 FL 7.7 1 106.0 107.3 14.0 1 98.8% Yes 3 JSd��Corner of Building Pad 12" FL 7.4 106.3 107.3 14.0 99.1 % Yes 4 5 6 J11 7 8 9 10 11 12 13 �' 14 �, .- ; i ,iV;c ..�.y Remark 6 l See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of Solli3earin� Legend for Elevation: / ,'�F PR = Proo roll 1,2,3 =1st, 2nd, 3rd Lift Submitted by: , ; i SL = Sprin'I g line FL = Final Lift Keith LeBlanc, P.E. SG = Sub ade BG = Below Grade Federal Engineering & Testingy�c�_ BC = Based urse BOF = Bottom of Footing Florida Reg. No. 59394 'r,,q r TOP = To of Pipe FG = Finished Grade Certificate of Authorization #5471� P 1111. As a mutual I rotection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions o extracts from or regarding our reports is reserved pending our written approval. A density lest determines the degree of compaction of the tested layer of material only. A densi do not preclu 1 d does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure 11I without settle ent. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to suppo he proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 l ) t hone 954-784-2941 � 800-848-1919 ede&al P Fax 954-784-7875 LA www.ted-eng.com 8 TESTING INC. 9 250 SW 13th Ar.e Pompano Beach, FL 33069 Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 35, Creekside Date:. October 5, 2018 . Address:, 8649 Cobblestone Drive,' Fort Pierce, FL Order #: 18DR892 Area Tes led: Building Pad Permit #: 0 7 - 6 9S7 Material ype: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Probe Moist Dry Proctor Optimum TEST LOCATION Elev. Density Value Moisture Compaction Pass Test # Depth % , PCF PCF /o 1 Center of Building Pad 12" FL 7.1 106.2 107.3 14.0 99.0% Yes 2 1 NW, Corner of Buildin Pad 1.2" FL 7.7 106.0 107.3 14.0 98.8% Yes 3 SE'�,, ornerof Building Pad 12" FL 7.4 106.3 107.3 14.0 99.1% Yes 4 5 6 7 8 9' 10 11 I ' 12 13 14 II Remark I : See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer -; This is a Compaction Test only on the top 12" of the pad and is not a verification of SolyBearig Capacity..: Legend fo Elevation: PR = Prot froll 1,2,3 = 1st, 2nd, 3rd Lift Submitted:by: �' SL = Spn gline" FL = Final Lift Keith.LzBlanc, P:E. ' j w f, SG = Sub)rade BG = Below Grade Federal Engineering & Testing, Inc. BC = BasIcourse BOF = Bottom of Footing Flarida�REo No. 59394., TOP = To1ir lllliof Pipe FG = Finished Grade Certificate of Authorization #5471 As a mutua1of to clients, the public and ourselves, all reports are submitted as the confidential propertyof,ciients,,and authorl7atian for publication of statements,. conclusions,i extracts from or regarding our reports is reserved pending our written approval. A density qst determines the degree of compacilon of the tested layer of material only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not precl, ide or guarantee that future settlement and cracking will not occur. A soil boring testis requiredao;certify,;ha the underly\ g soils will support the proposed structure without settI ment. If no soil borings have been performed to verify the underlying soils, we recommend that s8il;horings be perforrned to. evaluate the suitability of the underlying soil to sup p .'4 the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms; retesting' must be'perforrned on this work. PAGE 1 of 2 • Compacted Soils Method. D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing,, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed; by the client prior to construction to verify subsoil conditions. Our, scope of services only -included testing the top 12" of-added"fill material. -FET was not contracted to perform supervision ofthe building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No:other.analysis is implied or warranted. Job project specifications were not available at the time the work was'performed. Determination of the pass/fail compaction results are -based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifcations are required, Federal Engineering &Testing, Inc. shall be notified. j Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on 'other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested) prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been. a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2