Loading...
HomeMy WebLinkAboutFOUNDATION & FLOOR PLANHANGAR LOAD CALCULATIONS: fEK ester ¢a1€. 3600 S.F. @ 2 VA = 7000VA HANGAR DOOR 6400VA 10 RECEPTACLES 1800VA TOTAL 15200VA 15.2.00VA = 64AMPS 240 USE NEW 100 AMP SERVICE METAL ROOF GUTTER AND, DOWN SPOUT SYSTEM METAL SIDING PRE—ENGINEERED — STEEL STRUCTURE 8' PURLINS 6' WHITE VINYL F' -D BLANKET INSULATIDI, SEE SLAB SCHEDULE a bs-YI o �j 14w ) _.I. TYPICAL WALL SECTION SCALE 1 1/2' = 1'-0' L-t: r-I •a I vZ;_ G:.(s ue-Lr Aos.'%/Cw/ �l4HT �i1✓�. 4�r-.raa...a�.� t/�y PRODUCT REVIEW PRODUCT OPENING DESIGN PRODUCT MANUFACTURER MODEL# APPROVAL# GLASS ATTACHMENT METHOD PRESSURES DESIGN TYPE (WORST CASE) PRESSURES DOOR ZONE 4-28 -50 TILTECO INC. QW/8080 FLN IMPACT 3/8" DIAMETER THRU BOLTS @ 12" D.C., 6' ON ZONE 5-34 STEEL DOOR 23223.1 _ CORNERS, WITH A 2- MIN. AND I-1/2" �EMBEDMENT IT'y-t B.uttt; 5c gQF-p2tltrNG ROLL -UP -26 -32 DI SERIES S00 FL# NOW DOOR I 6964.3 IMPACT ji /ceV "� T /4 '- 14 x 1 "C_oNb 4" fee" SEE ENGINEERING FOR POWERLIFT-50 X 15 PIPER AIRCRAFT HYDRAULIC DOOR /06 N1 Ktiea or III 4HRi- Nfyq"/ UNp6RCoP�,.L nab P �gt�cr, 4F-�.v+cam THE SEAL HEREON IS PROVIDED ONLY TO INDICATE OUR REVIEW AND APPROVAL FOR USE OF PRODUCTS LISTED FOR THIS STRUCTURE. THE ACCEPTANCE OF THESE PRODUCTS AND METHODS OF ATTACHMENT ARE BASED ENTIRELY UPON TEST DATA PROVIDED BY THE MANUFACTURER, WHICH CARRIES ITS OWN ENGINEER'S - IF/i CL1 Gr,2N® - 3 *r 3C uEF !o Celew COP ? CD ro FINISH GRADE FOUNDATION SCHEDULE FOUNDATION DESIGN IS BASED UPON METAL REACTIONS BY UNITED STRUCTURES OF AMERICA JOB # SLS-VAL-DEB-HANGAR DATED 1/10/18 WITH AN ASSUMED SOIL BEARING CAPACITY OF 2000 PSF. S-1 4" (3000 PSI) POURED CONCRETE SLAB WITH FIBERMESH REINFORCING OM CLEAN COMPACTED TREATED FILL. F-1 12" DEEP X 16" WIDE MONLTIHIC FOOTING WITH 2 # 5 BARS CONTINUOUS. F-2 W-0" SQUARE X 2'-0" DEEP PAD FOOTING WITH # 5 BARS AT 6" O.C. EACH WAY BOTTOM AND # 5 BARS @ 12" O.C. EACH WAY TOP. F-3 5'-0" SQUARE X 2'-0" DEEP PAD FOOTING WITH # 5 BARS AT 6" O.C. EACH WAY BOT LOM AND # 5 BARS @ 12" O.C. EACH WAY TOP. F-4 8'-0" SQUARE X 2'-0" DEEP PAD FOOTING WITH It 5 BARS AT 6" O.C. EACH WAY BO_I TOM AND # 5 BARS @ 12" O.C. EACH WAY TOP. a. +Jc i h• x Lf L' 8oi`fzi 5 NA-U, ss- zz LOTJG ZD -O~ 60. O./ zo'- 0 n 4" " -o Q. -� 4-0 rM Car(eflOORD for Des10n_Lq�d Comnlianca 1. DESIGN CODE: Florida _�6yID6+an tII coda 2017 Edition wrZO supplements using ABCE 7-70 2. Structure Design is: 'k Enclosed _ Partially Enclosed „_, Open Sugding 3. Risk Category: `I Y II --__III —IV Exposure Category: —B X-C _,D Adjuatment 0D$ffl dentt r1 / 4. Design Wind VOIWtyXk-mph _ _ ,ASD ___ LRFD End Zone Width 4' ft. 5. Mean Roof Height: I ,ft. Roof Pitch: 1 :12 Parapat _-,ft. 6. Components & Cladding Design Pressure used: (PSF, based on Actual sq. ft. Q 3 A MRIJ (worst case) Zone 1:-4�_47 Zone 2:-53.1 Zone 3, 9-.YZone 4:-��Lone 6�44,akarage: A&,f 7. Design Loads: Floor. 7 3;` PSF Roof/Dead: — PSF Roof/Live Zo PSF Balcony: —PSF Dock: _PSF Deck: - _,- PSF Stairs: ,-,_,_ PSF Fence: _ PSF Railing: _ PSF 8, Were Shear Wails Considered for Structure? X Yes _Not Applicable Explain Why Not: S. Is a Continuous Load Path provided? X Yes —Not applicable Explain Why Not: 10. Soil boring Test required — Yee X No (based upon section 1803.2 exception) IF L­t--vja--T-( orJ SCANNED, ,o y St. Lucie 03, CA/, ST. LUC E COU UILDING DI REVIEWED FOR L NCE EVIEWED BY ATE n . PLANS AND PERT (14 MUST BE KEPT ON SITE OR NO INSP TION(S) WILL BE f �1 .w E COMP" zo FILE .1 0 N ARCHITECT Architectonic Inc 806 DELAWARE AVENUE FORT PIERCE, FLORIDA 34950 T: 772 460 7751 F: 772 460 4244 W W W.ARCH ITECTON ICINC.COM STATE REG # AA26003348 COPYRIGHT 2017 PROJECT BRENNER HANGAR - ST. LUCIE COUNTY, FLORIDA CLIENT CONSULTANTS I REGISTRATION I MICHAEL J. SEAL, AIA AR96898 REVISIONS NO. DATE REVISION KEY PLAN RECEIVED OCT 12 2018 Permitting Department $t. Lucie County SHEET TITLE / SHEET NUMBER dr- li PROJECT NUMBER DATE j/z 31� IS ��} yZ/ % o 2i�6MoQtL.L [mvotq