HomeMy WebLinkAboutFIELD DENSITY CONTRACTOR:LJ �Phone e er- SCANNED By & TESTING INC. Lucie � � Pompano Beach, FL 33069 954-784-2941 800-848-1919 Fax 954-784-7875 WWW.fed-eng.com 250 SW 13th Avg .Field Density Tests of Compacted Soils Method D-6938 Project: Proposed .Residence Lot 28, Creekside Date: August 15, 2018 Address: ''i 8617 Cobblestone Drive, Fort Pierce, FL Order #: 18DR739 Area Test's d: Building Pad Permit #: W 7 Eoe,' Z Material T d pe: Pale Brown Sand with Traces of Shell Tech: BK Client: D.R. Horton, Inc. Address: Culver Drive NE Compaction Req.: 95% 11430 p� Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test # TEST LOCATION Probe Depth Elev. Moist oho: Dry Density PCF Proctor Value PCF Optimum Moisture /osture Compaction Pass 1 Cent'J r of Building Pad 12" FL 8.8 103.1 106.4 12.0 96.9% Yes 2 NW 11 orner of Building Pad 12" FL 8.9 102.7 106.4 12.0 96.5% Yes 3 SE Corner of Building Pad 12" FL 7.4 106.2 106.4 12.0 99.8% Yes 4 !� 5 �� 6 7 II 8 I 10 !� 11 12 13 i 14 Remarks: Ii See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification of S it Bear'ng Capacity. Legend forElevation: I' PR = Proofr III 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Spring) ne FL = Final Lift 1K,-0ith*Le8lanc,'P E. y , G ���� SG = Subgr, de BG = Below Grade _ Feder, ..Engint?ering &�Te�ti�g, Inc. BC = Basecdurse BOF =Bottom of Footing Florida Reg.,No. 59394 - TOP =Top of Pipe FG = Finished Grade Certificate oaf Authorization # 5471 As a mutual pr tection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and,aufhorization for -publication of statements, conclusions or E 6acts from or regarding our reports is reserved pending our written approval. A density tes{deti?minest7e degree of•compacfkn.of the tested layer of material only. A density Joes not replace a soil bearing capacity determination. These density tests do not certify the use Tying; soil'matena s; below; he.proposed structure. The results do not preclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify tfiat the underlyinR i, lA w- O'support the proposed structure without settlem t. If no soil borings have been performed to verify the underlying soils, we recommend that soil boring,' tie.p@rfonned tb gv2�uate the suitability of the underlying soil to support t e proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be; perfoniied on this work. PAGE 1 of 2 Compacted Soils .MethodM—`6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A,soil boring test ust.be performed by the .client prior to construction to verify subsoil conditions. Our scope of services only included testing ,the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not partof the -scope of services. If environmental analysis of the ;soils is required, we can provide a proposal for performing an environmental analysis of the soil, materials. The scope of services is for determination -of the degree of compaction of the tested -layer -of material -only. No other analysis is implied or,warranted. Job project specifications were not available at the time the work -was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specificat%ons are required, Federal Engineering &.Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters,. construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential propertyof clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. I ! It has been a pleasure working with you and we look forward to doing so in the near future. _ J i J - Page 2 of 2