Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 34, Creekside Date: October 5, 2018
1
Addres 8645 Cobblestone Drive, Fort Pierce, FL Order #: 18DR891
Area TP'sted: Buiidina Pad ...mr 0 !_ pers / G 3S]
Materia
Client:
Addres
Type: Brown Sand with Traces of Shell r Te k- K
D.R. Horton, Inc.
: 1430 Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1557
Probe Moist Dry Proctor Optimum
TEST LOCATION Depth Elev. ,fie Density Value Moisture Compaction Pass
PCF PCF %
Test
#
1
C�nter of Building Pad
12"
FL
7.9
107.5
108.0
14.0
99.5%
Yes
2
N lI Corner of BuildingPad
12"
FL
10.2
1,07.9
108.0
14.0
99.9%
Yes
3
S
II Corner of Buildin Pad
12"
FL
6.0
107.1
108.0
14.0
99.2%
Yes
4
5
6
I
7
I
8
i
9
10
I'
11
�
12
13
14
II
O
•f;
,el
Re
PR =
SL =
SG =
BC =
TOP
Asan
only. A
do not I
without
soil to a
'ks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verificatioq of Soi earing�Capaci ;, 593`3�
for Elevation: ,> '
oofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by: ..'�•r-a,c"
ringline FL = Final Lift Keit LeBlanc, P.E. ,'
abgrade BG =Below Grade Federal Engineering & Testing �inc!���
isecourse BOF = Bottom of Footing Florida Reg. No. 59394
Fop of Pipe FG = Finished Grade Certificate of Authorization #5471'1/1 P t , , t e 9' `d
ial protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
is or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material
nsity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results
elude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure
ttlement. If no soil borings have been performed to verity the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
port the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2
ede-val
8 TESTING INC.
250 SW 13th A Te Pompano Beach, FL 33069
A-7 O 5-7Phone 954-784-2941
FILE800-848-1919
Fax 954-784-7875
www.fed-eng.com
Field Density Tests of Compacted Soils Method D-6938
Project:
Proposed. Residence Lot 34, Cteekside
Date:
October 5, 2018
Address:
'i 8645 Cobblestone Drive, Fort,Pie'rce, Fl-
Order #:
18DR891
Area Tes
ed: Building Pad
Permit #:
Material
ype: Brown Sand with Traces of Shell
Tech:
BK
Client:
D.R. Horton; Inc:
Address:;
1430 Culver Drive NE
Compaction Req.:
95%
Palm Bay, FL 32907
Proctor Method:
ASTM D-1557
Test
#
I TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
Ce
'Iter of Building Pad
12"
FL
71.9
107.5
108.0
14.0
99.5%
Yes
2
NWJ
Ii
Corner of Building Pad
12"
FL
10.2
107.9
108.6
14.0
99.9%
Yes
3
SEIiIQorner
of Building Pad
12"
FL
6.0'
107.1
108.0
14.0
99.2%
Yes
4
5
I
.
6
7
jI
81�
9
II
�I10
11
II
12
'I
13
I'
14
Remar s: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a veriflcatjojrbf Soil paring_Qapacity.
Legend or Elevation: ; '
PR = Pr ofroll 1,2,3 1st, 2nd, 3rd Lift Submitted by:
- -4: �?
SL = Sp ingline FL = Final Lift Keith' -LeBlanc, P.E. - �9
�/
SG = S ;grade BG = Below Grade Federal Engineering 4 Testing, inc.
BC = B secourse BOF = Bottom of Footing Florida Re' .'No, g9394
TOP = iliop of Pipe FG = Finished Grade 'Certificate of• Authorization #5474
As a mut al protection to clients, the public and ourselves, all reports are submitted 'as the confidential property of clients, and�aufhoniation for publination of statements,
conclusio � or extracts from or regarding our reports Is reserved pending our written approval. A density test determ' 16;s the degree of compaction of'the iested layer of material
only. A de i sity does not replace a soil bearing capacity determination. These density tests do not certify the underiylnb� i9i(materills ge!ow the proposed structure. The results
do not prei;lude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that tne�undedying soils wilfsupuort the proposed structure
without settlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings b'e,per cirglq-, '� ev8Wate,tlie suitability of the underlying
soil to support the proposed structure. After laying dormant for a period of 90 days orafter heavy rain/storms, retesting must be. por farmed..on4his work.
PAGE 1 of 2
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify'subsoil conditions. Our scope of service's only included testing jthe top
12" of added fill material. FET was not contracted ,to perform supervision of the building pad preparation. This testing of the
added fill material does not include an analysis'.of the underlying soil. materials to determine if they are capable -of supporting
the proposed structure without settlement. This density compaction test does not, warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed .
structure, we recommend performing soil borings below all foundation areas of the proposed "structure to verify the un erlying
soil conditions.
I
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials: The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specification's are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain, waters, -construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will'void this test and the site must be re -compacted and re -tested I prior
to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so -in the near future.
�I
�I
Page 2 of 2
J
ILECO ,
�I iyED Phone 954-784-2941
V� a .era I^T 4) � imR 800-848-1919
Fax 954-784-7875
& TESTING INC. PeS itLtu9 °ePartme Wfed-eng.COrrt
250 SW 13th %}ve Pompano Beach, FL 33069 c/e Coax-,
Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence Lot 34, Creekside Date: October 5, 2018
Address' 8645 Cobblestone Drive, Fort Pierce, FL Order #: 18DR891
Area Te ited: Building Pad Permit #: '7—(� 3�rJ
Material ype: Brown Sand with Traces of Shell Tech: BK
Client: D.R. Horton, Inc.
Addres . 1430 Culver Drive NE Compaction Req.: 95%
li Palm Bay, FL 32907 Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
J'I
Probe
Depth
Elev.
Moist
o
�O
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
Ccnl
ter of Building Pad
12"
FL
7.9
107.5
108.0
14.0
99.5%
Yes
2
NW
Corner of Building Pad
12"
FL
10.2
107.9
108.0
14.0
99.9%
Yes
3
Sli Corner of Building Pad
12"
FL
6.0
107.1
108.0
14.0
99.2%
Yes
4
I
5
it
6
7
8
li i
9
!I
10
11
12
it13
o",t';i
,.
14
PR=F
SL=S
SG
BC=E
TOP =
AsaML
only. A
do not I
without
soil to s
S: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verificatiort of SolyBearinglIUpadIhA. i9394
tr Elevation: it ;
3froll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
ngline FL = Final Lift KeitA LeBlanc, P.E.
grade BG = Below Grade Federal Engineering &
ecourse BOF = Bottom of Footing Florida Reg. No. 59394 rfi';
�
,p of Pipe FG = Finished Grade Certificate of Authorization #547r1'i
protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material
ity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results
ide or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils will support the proposed structure
ament. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
A the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2