Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PROJECT INFORMATION
V7. EnergyGauge Summit® v3.13 INPUT DATA REPORT Project Information Project Name: 10129-FPL PSL Orientation: North �1 Project Title: PORT ST. LUCIE Building Type: Workshop Address: Florida Power &`Light Company Building Classification: New Finished building 52. > 700 Universe Boul, .01- State: FLORIDA No.of Storeys: 3 Zip: 33408 GrossArea: 92981 SF Owner: FLORIDA POWER & LIGHT—COIV No Acronym Description Type VLF Area [sf] Multiplier Total Area [sf] 1 Stairwells Stairwells - 3 Stories CONDITIONED 2334.5 1 2334.5 ❑ 2 1st fir first floor corridors CONDITIONED 1395.0 1 1395.0 ❑ corridors 3 1 st flr maint. 1 st flr maintenance CONDITIONED 11402.0 1 11402.0 ❑ workshops and crane bay 4 1st flr EM 1st floor multifunct/elec CONDITIONED 3834.0 1 3834.0 ❑ areas mant./movable offices 4/16/2608 EnergyGauge Summit® v3.13 1 5 1 st flr 1 st floor CONDITIONED 2209.0 1 2209.0 ❑ MM/GML multifunct/briefing/movabl e offices 6 1 st flr wkst 1 st floor CONDITIONED 2268.0 1 2268.0 ❑ 119/120 multifunct/briefing/movabl e offices 7 1 st flr M/TE multifunctional space CONDITIONED 992.0 1 992.0 ❑ 001 8 1 st flr MM 1 st floor MM offices CONDITIONED - 1125.0 1 1125.0 ❑ Offs 105-111, fixed locations 9 1 st flr FIN 1 st floor FIN offices CONDITIONED . 930.0 1 930.0 ❑ Offs 115-118, fixed locations 10 1st flr EM 1st floor EMoffices CONDITIONED 1131.9 1 1131.9 ❑ Offs 122-128, fixed locations 11 1st flr tlt rms 1st floor Toilet CONDITIONED 838.0 1 838.0 ❑ Rms/Storage Rms/Jan. - Rms 12 1 st flr equip. 1 st floor elec. rm/tel-data CONDITIONED" 508.9 1 508.9 ❑ rms rm/elev. mach rm 13 1st flr Mech 1st floor mechanical room PLENUM-`- ' 816.0 1 816.0 ❑ Rm 138 14 2nd flr I/C 2nd floor I&C Office CONDITIONED 1200.0' 1 1200.0 ❑ 205-209 205-209, Storage 210 15 2nd flr conf 2nd floor conference room CONDITIONED 310.0 1 310.0 ❑ rm 204 204 16 2nd flr conf conference room CONDITIONED 300.0 1 300.0 ❑ rm 220 17 2nd flr plot rm plotter room CONDITIONED 180.0 1 180.0 ❑ 223 18 2nd flr prg Programs Offices 218 & CONDITIONED 300.0 1 300.0 ❑ 218/219 219 19 2nd fir conf conference room CONDITIONED 432.0 1 432.0 ❑ rm 229 20 2nd fir Library Library and high density CONDITIONED 960.0 1 960.0 ❑ 230 , storage 21 2nd flr I/C I&C Offices 211-215A CONDITIONED 750.0 1 750.0 ❑ 211-215A 22 2nd flr Ping Planning Offices 224-228 CONDITIONED 750.0 1 750.0 ❑ 224-228 23 2nd flr second floor CONDITIONED 3336.0 1 3336.0 ❑ corridors corridors/storage rooms V2008 EnergyGaur ",immit® v3.13 2 24 2nd fir office spaces CONDITIONED 25 2nd flr Room Programming & Planning CONDITIONED 222 work stations 222 26 2nd fir I/C 216 I&C work benches CONDITIONED 27 2nd flr equip. 2nd floor elec. rm/tel-data CONDITIONED rms rm 28 2nd flr conf 2nd floor conference room CONDITIONED rm 252 252 29 2nd flr conf 2nd floor conference room CONDITIONED rm 253 253 30 2nd flr Mech 2nd floor mechanical PLENUM Rm 241 room 31 2nd flr ERF 2nd floor ERF room 233 CONDITIONED 233 32 2nd flr tlt rms 2nd floor Toilet CONDITIONED Rms/Locker Rms/Jan. Rms 33 2nd flr all Assembly CONDITIONED hands Areas/Kitchen/Vending/Br eak Room 34 3rd flr N 3rd floor workstation area CONDITIONED WkStn 321 (north) O 35 3rd flr S 3rd floor workstation area CONDI TO WkStns 342 (north) 36 3rd flr Mgr 3rd floor Manager Offices CONDITI 304-308 304-308 37 3rd flr Mgr 3rd floor Manager Offices CONDITION Y- 331-335 331-335 38 3rd flr Mgr 3rd floor Manager Offices CONDITIONED 338-341 338-341 39 3rd flr Mgr 3rd floor Manager Offices CONDITIONED 0- 311-314 311-314 40 3rd flr Cnf 3rd-floor Conf Rms 309 & CONDITIONED 0 309 str clst. 309A 41 3rd flr Cnf 3rd floor Conf Rms 319 CONDITIONED 319 42 3rd flr Cnf 3rd floor Conf Rms 320 CONDITIONED 320 43 3rd flr Cnf 3rd floor Conf Rms 316 CONDITIONED 316 4/16/2008 1867.2 1 1867.2 U 5400.0 1 5400.0 ❑ 3402.0 1 3402.0 ❑ 300.0 1 300.0 ❑ 432.0 1 432.0 ❑ 306.0 1 306.0 ❑ 832.0 1 832.0 ❑ 816.0 1 816.0 ❑ 1705.0 1 1705.0 ❑ 5528.0 1 5528.0 ❑ 11130.0 1 11130.0 ❑ 6120.0 1 6120.0 ❑ 800.0 1 800.0 ❑ 800.0 1 800.0 ❑ 712.0 1 712.0 ❑ 712.0 1 712.0 ❑ 398.0 1 398.0 ❑ 420.0 1 420.0 ❑ 420.0 1 420.0 ❑ 450.0 1 450.0 ❑ - - - -- --- - ------ - - - - ------ - ---- - -- EnergyGauge Summit® v3.13 3 44 3rd flr Cnf 3rd floor Conf Rms 317 CONDITIONED 450.0 1 450.0 ❑ 317 45 3rd flr Cnf 3rd floor Conf Rms 318 CONDITIONED 450.0 1 450.0 ❑ 318 46 . 3rd flr Cnf 3rd floor Conf Rms 315 CONDITIONED - 600.0 1 600.0 ❑ 315 47 3rd flr toilet 3rd floor Toilet Rooms CONDITIONED 681.5 1 681.5 ❑. rms 324/324 & Jan clst 323 48 3rd flr Mech 3rd floor mechanical room PLENUM 884.0 1 884.0 ❑ Rm 328 it 49 3rd flr equip. 3rd floor elec. rm/tel-data CONDITIONED- 260.0 1 260.0 ❑ rms rm 50 3rd flr third floor corridors CONDITIONED 3000.0 1 3000.0 ❑ corridors 51 3rd flr Cnf 3rd floor Conf Rms 336 & CONDITIONED 398.0 1 398.0 ❑ 336 str clst. 336A 52 1st flr Calibration areas CONDITIONED 5405.0 1 5405.0 ❑ Calibration - Spaces No Acronym Description Type Depth Width Height Multi Total Area Total Volume IN [ft] [ft] plier [sf] [cfl In Zone: Stairwells 1 Stair "A" Stair "A" 101, 201, 301 Stair - Active Traffic 25.00 11.50 15.00 3 862.5 12937.5 ❑ 2 Stair "B" Stair "B" 102, 202, Stair - Active Traffic 32.00 11.50 15.00 4 1472.0 220800 ❑ 302,402 In Zone: 1st fir corridors 1 Corridor 113, ]Corridors Corridor 56.50 6.00 10.00 2 678.0 2 Corridor 130 Corridors Corridor 112.00 6.00 10.00 1 672.0 3 Issue Counter Reception/lobby Lobby (General) - Reception 15.00 3.00 10.00 1 45.0 and Waiting In Zone: 1st flr maint. 1 Mech. Maint. CMaintenance workshop Workshop 88.00 84.00 20.00 1 7392.0 and crane bay 2 Elec. Maint. O1Maintenance workshop Workshop 55.00 55.00 20.00 1 3025.0 and crane bay 1/2008 EnergyGaur "ummit® v3.13 6780.0 ❑ 6720.0 ❑ 450.0 ❑ 147840.0 ❑ 60500.0 ❑ - 4 3 Storage 013 Storage Room Storage & Warehouse - 20.00 - u cove Storage 4 Breaker Testin:Maintenance Worksop Workshop 20.00 5 Motors/ValvesMaintenance Worksop Workshop 20.00 6 Motors/Valves Maintenance Worksop Workshop 20.00 In Zone: 1st flr EM areas 1 EM Area 129 multifunctional/electric Workshop 54.00 al workbench area In Zone: 1st flr MM/GML 1 MM/GML briemultifunctional space, Workshop 47.00 movable off and briefing In Zone: - 1st flr wkst 119/120 1 wk st 119/120 multifunctional space, Workshop 54.00 movable off and - wkbnchs In Zone: 1st flr M/TE 001 1 M/TE 001 multifunctional space Fine Material Storage 31.00 In Zone: 1st flr MM Offs 1 Offices 105-11fixed offices Office - Enclosed 15.00 2 Offices 110 fixed offices As Enclosed 18.00 In Zone: Ist fir FIN Offs 1 . Offices 115-11fixed offices - Enclosed 15.00 2 Offices 118 fixed offices Of n sed 15.00 In Zone: 1st flr EM Offs 1 Offices 122-12fixed offices Office - EWMN,15.40 In Zone: 1st flr tlt rms 1 Men's Tlt. 133 Toilet Room Toilet and s 13.00 2 Women's Th. 1Toilet Room Toilet and W 00 10.00 3 Storage Rm 01 Storage Medium/Bulky �z at 15.00 4 Break Area 13 break area Storage ®�� Lobby (General) - Rece 'o 15.00 and Waiting 5 Janitor's closet Janitor's closet Unknown 6.00 In Zone: 1st fir equip. rms 12.00 10.00 12.25 10.00 12.50 10.00 12.50 10.00 71.00 10.00 1 240.0 1 245.0 1 250.0 1 250.0 1 3834.0 47.00 10.00 1 2209.0 42.00 10.00 1 2268.0 2400.0 U 2450.0 El 2500.0 2500.0 38340.0 ❑ 22090.0 22680.0 32.00 10.00 1 992.0 9920.0 El 10.50 10.00 6 945.0 9450.0 10.00 10.00 1 180.0 1800.0 10.00 10.00 5 750.0 7500.0 12.00 10.00 1 180.0 1800.0 10.50 10.00 7 1131.9 11319.0 26.00 10.00 1 338.0 3380.0 20.00 10.00 1 200.0 2000.0 10.00 10.00 1 150.0 1500.0 7.00 10.00 1 105.0 1050.0 El 7.50 10.00 1 45.0 450.0 El 4/16/2008 EnergyGauge Summit® v3.13 5 I Elec. Rm 139 1st floor electrical Electrical Mechanical 15.00 room Equipment Room - General 2 Data/Tele 140 Data and Telephone Electrical Mechanical 10.75 room Equipment Room - General 3 Elevator Mach 1st floor Elevator Electrical Mechanical 13.00 Machine Room Equipment Room - General - 4 Elevator 103 Elevator Corridor 12.00 In Zone: 1st flr Mech Rm 138 1 Mech Rm 138 1st floor Mechanical Electrical Mechanical 34.00 room Equipment Room - General In Zone: 2nd flr I/C 205-209 1 Offices 205-20fixed offices Office - Enclosed 15.00 2 Stor Rm 210 storage Storage & Warehouse - 15.00 Inactive Storage In Zone: 2nd flr conf rm 204 1 Conf rm 204 conference room Confereride/meeting 20.00 (Multiple Functions) In Zone: 2nd flr conf rm 220 1 Conf rm 220 conference room Conference/meeting 20.00 (Multiple Functions) In Zone: 2nd flr plot rm 223 1 plotter rm 223 plotter room Medium/Bulky Material 12.00 Storage In Zone: 2nd flr prg 218/219 1 Prgms 218/219office enclosed Office - Enclosed 10.00 In Zone: 2nd flr conf rm 229 1 Conf rm 229 conference room Conference/meeting 27.00 (Multiple Functions) In Zone: 2nd fir Library 230 1 Library 230 Library and high Stacks (Library) 60.00 density storage In Zone: 2nd flr I/C 211-215A 1 Offices 211-21fixed offices Office - Enclosed 15.00 In Zone: 2nd flr Ping 224-228 1 Offices 224-22fixed offices Office - Enclosed 15.00 In Zone: 2nd flr corridors 1 2nd flr Corridocorridors 221, 239, Corridor 556.00 259, Bridge Access 217 In Zone: 2nd fir 244-251 5/2008 a � 12.50 15.00 1 187.5 2812.5 12.50 15.00 1 134.4 . 2015.6 7.00 15.00 1 91.0 1365.0 8.00 45.00 1 96.0 4320.0 24.00 15.00 1 816.0 12240.0 10.00 10.00 5 6.00 10.00 5 15.50 10.00 1 15.00 10.00 1 15.00 10.00 1 15.00 10.00 2 16.00 10.00 1 16.00 10.00 1 10.00 10.00 5 10.00 10.00 5 6.00 10.00 1 EnergyGau- -"limmit® v3.13 750.0 450.0 310.0 300.0 180.0 300.0 432.0 960.0 750.0 750.0 3336.0 I 7500.0 4500.0 3100.0 3000.0 1800.0 3000.0 4320.0 9600.0 7500.0 7500.0 33360.0 6 1 Offices 249-25fixed offices Office - Enclosed 15.30 2 Offices 244-24fixed offices Office - Enclosed 15.40 3 corridor 248 fixed offices Corridor 78.00 4 admin asst 247open Office - Open Plan 20.00 5 stor 248A storage Medium/Bulky Material 15.30 Storage In Zone: 2nd flr Room 222 1 Prg/Ping 222 multifunctional open Office - Open Plan 100.00 office space In Zone: 2nd flr I/C 216 10.30 10.00 3 472.8 12.20 10.00 3 563.6 5.50 10.00 1 429.0 15.50 10.00 1 310.0 6.00 10.00 1 91.8 54.00 10.00 1 5400.0 1 I/C WB 216 multifunctional space, Workshop 63.00 , 54.00 10.00 1 movable workstations In Zone: 2nd flr equip. rms 1 Elec. Rm 242 3rd floor electrical Electrical Mechanical 15.00 10.00 15.00 1 room Equipment Room - General 2 Data/Tele 243 Data and Telephone Electrical Mechanical 10.00 15.00 10.00 1 room Equipment Room - General In Zone: 2nd flr conf rm 252 1 Conf rm 252 conference room Conference/meeting 24.00 (Multiple Functions) In Zone: 2nd flr conf rm 253 1 Conf rm 253 conference room Conf eeting 17.00 (M tiFu ctions) In Zone: 2nd flr Mech Rm 241 1 Mech Rm 241 2nd floor Mechanical Electra echanical 32.00 room Equipm t - General In Zone: 2nd flr ERF 233 1 ERF Rm 233 multifunctional space, Workshop% 20.00. movable workstations 2 ERF Rm 233Alocker room Dressing/Loc _ r/Fitt 8.00 Room (Geller ' 3 room 231 Pressure Temperature Workshop 12.00 test area 4 room 232 I/C QC Locker Dressing/Locker ' 12.00 Room (General) In Zone: 2nd flr tlt rms 1 Men's Th. 236 Toilet Room Toilet and Washroom 26.00 2 Women's Th. 2Toilet Room 0z Toilet and Washroom 25.00 4/16/2008 3402.0 150.0 150.0 18.00 10.00 1 432.0 18.00 10.00 ' 1 306.0 26.00 15.00 1 832.0 21.00 10.00 1 12.00 10.00 1 12.00 10.00 1 13.00 10.00 1 13.00 10.00 1 9.00 10.00 1 EnergyGauge Summit® v3.13 420.0 96.0 144.0 156.0 338.0 225.0 4727.7 5636.4 4290.0 3100.0 918.0 54000.0 34020.0 2250.0 1500.0 4320.0 3060.0 12480.0 4200.0 960.0 1440.0 1560.0 3380.0 2250.0 7 3 Men's Lkr Rm locker room Dressing/Locker/Fitting 26.00 28.00 10.00 1 728.0 7280.0 Room (General) 4 Women's Lkr Mocker room Dressing/Locker/Fitting 25.00 8.00 10.00 1 200.0 2000.0 Room (General) 5 Janitor's closet Janitor's closet Unknown 6.00 7.50 10.00 1 45.0 450.0 6 Men's shwr 23;shower room Toilet and Washroom 13.00 13.00 10.00 1 169.0 1690.0 In Zone: 2nd flr all hands 1 All Hands 254 assembly room lecture Classroom/Lecture Hall 40.00 45.00 10.00 1 1800.0 18000.0 El hall 2 All Hands 255 assembly room lecture Classroom/Lecture Hall`- 40.00 40.00 10.00 1 1600.0 16000.0 El hall .,Jf 3 Brk Rm. 256 Break Classroom/Lecture "Hall 40.00 40.00 10.00 1 1600.0 16000.0 El Ro om/Assembly/Lectur e Hall 4 Kitchen/VendiiKitchen 258 and Food Service 'Bar/Lounge 44.00 12.00 10.00 1 528.0 5280.0 ❑ Vending 257 In Zone: 3rd flr N WkStn 1 Wkst area 321 open plan offices Office,- Open;Plan 106.00 105.00 10.00 1 11130.0 111300.0 In Zone: 3rd fir S WkStns 1 Wkst area 342 open plan offices Office - Open Plan 36.00 170.00 10.00 1 6120.0 61200.0 �] In Zone: 3rd flr Mgr 304-308 1 Mgr 304-308 private offices Office - Enclosed 10.00 16.00 10.00 5 800.0 8000.0 In Zone: 3rd flr Mgr 331-335 1 Mgr 331-335 private offices Office - Enclosed 10.00 16.00 10.00 5 800.0 8000.0 In Zone: 3rd flr Mgr 338-341 1 Mgr 338-341 private offices Office - Enclosed 10.00 16.00 10.00 4 640.0 6400.0 2 storage 337 storage Medium,Bulky Material 6.00 12.00 10.00 1 72.0 720.0 Storage In Zone: 3rd flr Mgr 311-314 1 Mgr 311-314 private offices Office - Enclosed 10.00 16.00 10.00 4 640.0 6400.0 2 storage 310 storage Medium/Bulky Material 6.00 12.00 10.00 1 72.0 720.0 Storage In Zone: t 3rd flr Cnf 309 1 Conf Rm 309 conference Conference/meeting 16.00 20.00 10.00 1 320.0 3200.0 El rooms/storage closets (Multiple Functions) 2 Stor 309A conference Storage & Warehouse - 6.50 12.00 10.00 1 78.0 780.0 rooms/storage closets Inactive Storage :/2008 EnergyGaur -limmit® v3.13 8 In Zone: 3rd fir Cnf 319 1 Conf Rm 319 conference Con erf once/meeting 20.00- rooms/storage closets (Multiple Functions) In Zone: 3rd flr Cnf 320 1 Conf Rm 320 conference Conference/meeting 20.00 rooms/storage closets (Multiple Functions) In Zone: 3rd flr Cnf 316 1 Conf Rm 316 conference Conference/meeting 25.00 rooms/storage closets (Multiple Functions) In Zone: 3rd flr Cnf 317 1 Conf Rm 317 conference Conference/meeting 25.00 rooms/storage closets (Multiple Functions) In Zone: 3rd flr Cnf 318 1 Conf Rm 318 conference Conference/meeting 25.00 rooms/storage closets (Multiple Functions) In Zone: 3rd flr Cnf 315 1 Conf Rm 315 conference Conference/meeting 25.00 rooms/storage closets (Multiple Functions) In Zone: 3rd flr toilet rms 1 Wmn's Tlt Rmwomen's toilet room Toilet and Washroom 25.00 2 Men's Th Rm 3VIen'S toilet room Toilet and Washroom 12.50 3 Jan clst 323 Janitor's closet Toilet A room 7.00 4 coffee stn 326 Janitor's closet Toilet and om 10.00 In Zone: 3rd flr Mech Rm 328 1 Mech Rm 328 3rd floor Mechanical Electrical piial 34.00 room Equipment R General In Zone: 3rd flr equip. rms 1 Elec. Rm 329 3rd floor electrical Electrical Mechan' 16.00 room Equipment Room Gene 2 Data/Tele 243 3rd floor Data and Electrical Mecham 10.00 Telephone room Equipment Room - G ral In Zone: 3rd fir corridors 1 Corridor 322/3corridors Corridor 00.00 In Zone: 3rd flr Cnf 336 1 Conf Rm 336 conference Conference/meeting 0 rooms/storage closets (Multiple Functions) 2. Stor 336A conference Storage & Warehouse - 6.50 rooms/storage closets Inactive Storage In Zone: 1st flr Calibration 21.00 10.00 1 420.0 18.00 10.00 1 450.0 18.00 10.00 1 450.0 18.00 10.00 1 450.0 24.00 10.00 1 600.0 10.00 10.00 1 25.00 10.00 1 7.00 15.00 1 7.00 10.00 1 26.00 15.00 1 10.00 15.00 1 10.00 10.00 1 6.00 10.00 1 20.00 10.00 1 12.00 10.00 1 250.0 312.5 49.0 70.0 884.0 160.0 100.0 3000.0 320.0 78.0 4200.0 4500.0 4500.0 4500.0 6000.0 2500.0 3125.0 735.0 700.0 13260.0 2400.0 1000.0 30000.0 3200.0 780.0 4/16/2008 EnergyGauge Summit® v3.13 9 I Calibration 00'work station area Workshop 21.00 46.00 10.00 -5 4830.0 48300.0 2 Equipment Ro(Cold Rm 003, Pump Fine Material Storage 12.50 11.50 10.00 4 575.0 5750.0 Rm 004, Equip 005, Equip 006 -_ Lighting No Type Category No. of Watts per Power Control Type No.of Luminaires Luminaire [W] Ctrl pts In Zone: Stairwells In Space: Stair "A" 1 Recessed Fluorescent - General Lighting 6 60 360 Manual On/Off 2 El No vent In Space: Stair "B" 1 Recessed Fluorescent - General Lighting 8 60 480 Manual On/Off 2 No vent In Zone: 1st flr corridors In Space: Corridor 113, 121 1 Recessed Fluorescent - General Lighting 5 62 310 Manual On/Off 2 El No vent In Space: Corridor 130 1 Recessed Fluorescent - General Lighting 11 62 682 Manual On/Off 2 El No vent In Space: Issue Counter 114 1 Recessed Fluorescent - General Lighting 1 62 62 Manual On/Off 2 No vent In Zone: 1st fir maint. In Space: Mech. Maint. 010 1 Recessed Fluorescent - General Lighting 35 242 8470 Manual On/Off 2 No vent 2 Recessed Fluorescent - General Lighting 34 60 2040 Manual On/Off 2 El No vent In Space: Elec. Maint. 012 1 Recessed Fluorescent - General Lighting 18 242 4356 Manual On/Off 2 0 No vent 2 Recessed Fluorescent - General Lighting 1 60 60 Manual On/Off 1 ❑ No vent In Space: Storage 013 V2008 EnergyGau- "unmit® v3.13 10 1�•- If I r �-r 1i 1 1 Recessed Fluorescent - General Lighting 4 60 240 Manual On/Off 1 No vent In Space: Breaker Testing 014 1 Recessed Fluorescent - General Lighting 4 60 240 Manual On/Off 1 No vent In Space: MotorsNalves 015 1 Recessed Fluorescent - General Lighting 4 60 240 Manual On/Off 1 ❑ No vent In Space: MotorsNalves 015 1 Recessed Fluorescent - General Lighting 4 60 240 Manual On/Off 1 ❑ No vent In Zone: 1st flr EM areas In Space: EM Area 129 1 Compact Fluorescent General Lighting 28 121 3388 Manual On/Off 2 ❑ In Zone: 1st fir MM/GML In Space: MM/GML briefing 112 1 Recessed Fluorescent - General Lighting 20 121 2420 Manual On/Off 2 ❑ No vent In Zone: 1st fir wkst 119/120 In Space: wk st 119/120 1 Recessed Fluorescent - General Lighting 16 121 1936 Manual On/Off 2 No vent In Zone: 1st fir M/TE 001 In Space: M/TE 001 1 Recessed Fluorescent - General Li 15 90 1350 Manual On/Off 2 ❑ No vent In Zone: 1st fir MM Offs In Space: Offices 105-111 1 Recessed Fluorescent - General Lighti 2 90 180 Manual On/Off 1 No vent In Space: Offices 110 1 Recessed Fluorescent - General Lighting 0. 3 90 270 Manual On/Off 1 No vent In Zone: 1st fir FIN Offs In Space: Offices 115-117 0 1 Recessed Fluorescent - General Lighting 90 180 Manual On/Off 1El No vent In Space: Offices 118 1 Recessed Fluorescent - General Lighting 90 180 Manual On/Off 1 No vent In Zone: 1st flr EM Offs In Space: Offices 122-128 4/16/2008 EnergyGauge Summit® v3.13 11 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 No vent In Zone: 1st fir tit rms In Space: Men's Tit. 133 1 Compact Fluorescent General Lighting 5 23 115 Manual On/Off 1 2 Compact Fluorescent General Lighting 4 35 140 Manual On/Off 1 El In Space: Women's Tit. 134 1 Compact Fluorescent General Lighting 5 23 115 Manual On/Off 1 2 Compact Fluorescent General Lighting 4 35 140 Manual On/Off 1 El In Space: Storage Rm 011 1 Recessed Fluorescent - General Lighting 2 60 120 Manual On/Off 1 El No vent In Space: Break Area 135 1 Recessed Fluorescent - General Lighting 1 60 60 Manual On/Off 1 El No vent In Space: Janitor's closet 137 1 Recessed Fluorescent - General,Lighting 1 60 60 Manual On/Off 1 El No vent In Zone: 1st fir equip. rms In Space: Elec. Rm 139 1 Recessed Fluorescent - General Lighting 4 60 240 Manual On/Off 1 No vent In Space: Data/Tele 140 1 Recessed Fluorescent - General Lighting 2 60 120 Manual On/Off 1 El • No vent In Space: Elevator Mach Rm 104 1 Recessed Fluorescent - General Lighting 1 60 60 Manual On/Off 1 El No vent In Space: Elevator 103 1 Recessed Fluorescent - General Lighting 1 100 100 Manual On/Off 1 No vent In Zone: 1st fir Mech Rm 138 In Space: Mech Rm 138 1 Recessed Fluorescent - General Lighting 11 60 660 Manual On/Off 1 El No vent In Zone: 2nd fir I/C 205-209 In Space: Offices 205-209 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 El No vent In Space: Stor Rm 210 5/2008 EnergyGau- "ummit® v3.13 12 r- - 1 Recessed Fluorescent - General Lighting 1 60 60 Manual On/Off 1El — -- -NO-Vent--�-- In Zone: 2nd fir conf rm 204 In Space: Conf rm 204 1 Recessed Fluorescent - General Lighting 4 91 364 Manual On/Off 1 No vent In Zone: 2nd flr conf rm 220 In Space: Conf rm 220 1 Recessed Fluorescent - General Lighting 4 91 364 Manual On/Off 1 ❑ No vent In Zone: 2nd flr plot rm 223 In Space: plotter rm 223 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 - No vent In Zone: 2nd flr prg 218/219 In Space: Prgms 218/219 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 ❑ No vent In Zone: 2nd flr conf rm 229 In Space: Conf rm 229 1 Recessed Fluorescent - General Lighting 6 91 546 Manual On/Off 1 No vent In Zone: 2nd flr Library 230 In Space: Library 230 1 Recessed Fluorescent - Gene ing 9 90 810 Manual On/Off 1 ❑ No vent In Zone: 2nd flr I/C 211-215A In Space: Offices 211-215A tUting 1 Recessed Fluorescent - General 2 90 180 Manual On/Off 1 ED No vent In Zone: 2nd flr Ping 224-228 0-. In Space: Offices 224-228 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 No vent 0 In Zone: 2nd fir corridors In Space: 2nd flr Corridors 1 Recessed Fluorescent - General Lighting 62 2790 Manual On/Off 2 El No vent In Zone: 2nd flr 244-251 In Space: Offices 249-251 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 No vent 4/16/2008 EnergyGauge Summit® v3.13 13 In Space: Offices 244-246 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 El No vent In Space: corridor 248 1 Recessed Fluorescent - General Lighting 8 62 496 Manual On/Off 1 El No vent In Space: admin asst 247 1 Recessed Fluorescent - General Lighting yN 2 90 180 Manual On/Off 1 No vent In Space: stor 248A 1 Recessed Fluorescent - General Lighting 1 62 62 Manual On/Off 1 No vent In Zone: 2nd flr Room 222 In Space: Prg/Ping 222 1 Recessed Fluorescent - General Lighting 39 121. 4719 Manual On/Off . 4 El No vent In Zone: 2nd flr I/C 216 C In Space: I/C WB 216 1 Recessed Fluorescent - General Lighting ' 24 121 2904 Manual On/Off 2 El No vent In Zone: 2nd flr equip. rms In Space: Elec. Rm 242 1 Recessed Fluorescent - General Lighting 2 60 120 Manual On/Off 1 El No vent In Space: Data/Tele 243 1 Recessed Fluorescent - General Lighting 1 60 60 Manual On/Off 1 No vent In Zone: 2nd fir conf rm 252 In Space: Conf rm 252 1 Recessed Fluorescent - General Lighting 4 91 364 Manual On/Off 1 No vent In Zone: 2nd flr conf rm 253 In Space: Conf rm 253 1 Recessed Fluorescent - General Lighting 3 91 273 Manual On/Off 1 El No vent In Zone: 2nd fir Mech Rm 241 In Space: Mech Rm 241 1 Recessed Fluorescent - General Lighting 9 60 540 Manual On/Off 1 No vent In Zone: 2nd flr ERF 233 In Space: ERF Rm 233 5/2008 EnergyGau- "ummit® v3.13 14 t- a r- , 1 Recessed Fluorescent- General Lighting 6 o-vent — In Space: ERF Rm 233A 1 Recessed Fluorescent - General Lighting 1 No vent In Space: room 231 1 Recessed Fluorescent - General Lighting 2 No vent In Space: room 232- 1 Recessed Fluorescent - General Lighting 1 No vent In Zone: 2nd flr tit rms In Space: Men's Tlt. 236 1 Compact Fluorescent General Lighting 4 2- Compact Fluorescent General Lighting 4 In Space: Women's Tit. 237 1 Compact Fluorescent General Lighting 3 2 Compact Fluorescent General Lighting 3 In Space: Men's Lkr Rm 234 1 Recessed Fluorescent - General Ligiting 9 No vent In Space: Women's Lkr 238 1 Recessed Fluorescent - Gener bfi 3 No vent In Space: Janitor's closet 137 1 Compact Fluorescent General L �toi 1 In Space: Men's shwr 235 1 Recessed Fluorescent - General Lighti 2 No vent In Zone: 2nd fir all hands In Space: All Hands 254 1 Compact Fluorescent General Lighting 14 In Space: All Bands 255 1 Compact Fluorescent General Lighting In Space: Brk Rm 256 1 Compact Fluorescent General Lighting 12 - In Space: Kitchen/Vending 4/16/2008 EnergyGauge Summit® v3.13 62 372 ManualOn/Off 1El 62 62 Manual On/Off 1El 62 124 Manual On/Off 1 62 62 Manual On/Off 1 23 92 ManualOn/Off 1 ❑ 35 140 Manual On/Off 1 23 69 Manual On/Off 1 ❑ 35 105 Manual On/Off 1 ❑ 60 540 Manual On/Off 1El 60 180 ManualOn/Off 1 60 60 Manual On/Off 1 60 120 Manual On/Off 1 121 1694 ManualOn/Off 2 ED 121 1452 ManualOn/Off 2 El 121 1452 Manual On/Off 2 ❑ 15 I Compact Fluorescent General Lighting 4 In Zone: 3rd flr N WkStn In Space: Wkst area 321 1 Recessed Fluorescent - General Lighting 81 No vent In Zone: 3rd fir S WkStns In Space: Wkst area 342 _ 1 Recessed Fluorescent - General Lighting 51 No vent In Zone: 3rd flr Mgr 304-308 In Space: Mgr 304-308 1 Recessed Fluorescent - General Lighting 2 No vent In Zone: 3rd flr Mgr 331-335 In Space: Mgr 331-335 1 Recessed Fluorescent - General Lig ting 2 No vent In Zone: 3rd flr Mgr 338-341 In Space: Mgr 338-341 1 Recessed Fluorescent - General Lighting 2 No vent In Space: storage 337 1 Recessed Fluorescent - General Lighting 1 No vent In Zone: 3rd fir Mgr 311-314 -_ In Space: Mgr 311-314 1 Recessed Fluorescent - General Lighting 2 No vent In Space: storage 310 1 Recessed Fluorescent - General Lighting 1 No vent In Zone: 3rd flr Cnf 309 In Space: Conf Rm 309 1 Recessed Fluorescent - General Lighting 4 No vent In Space: Stor 309A 1 Recessed Fluorescent - General Lighting 1 No vent In Zone: 3rd flr Cnf 319 In Space: Conf Rm 319 1 Recessed Fluorescent - General Lighting 4 No vent V2008 EnergyGauc "wnrnit® v3.13 121 484 Manual On/Off 1 121 9801 Manual On/Off 5 ❑ 121 6171 ManualOn/Off 4 El 90 180 ManualOn/Off 1 El 90 180 Manual On/Off 1 El 90 180 Manual On/Off 1 ❑ 62 62 Manual On/Off 1 El 90 180 Manual On/Off 1 . 62 62 ManualOn/Off 1El 91 364 Manual On/Off 1El 62 62 Manual On/Off 1El 91 364 Manual On/Off 1 16 In Zone: 3rd fir Cnf 320 - - - —In-Space:— on - -- - --- - 1 Recessed Fluorescent - General Lighting 4 91 364 Manual On/Off 1 No vent In Zone: 3rd fir Cnf 316 In Space: Conf Rm 316 1 Recessed Fluorescent - General Lighting 6 91 546 Manual On/Off 1 No vent In Zone: 3rd flr Cnf 317 In Space: Conf Rm 317 1 Recessed Fluorescent - General Lighting 6 91 546 Manual On/Off 1 ❑ No vent In Zone: 3rd fir Cnf 318 In Space: Conf Rm 318 1 Recessed Fluorescent - General Lighting 6 91 546 Manual On/Off 1 No vent In Zone: 3rd flr Cnf 315 In Space: Conf Rm 315 1 Recessed Fluorescent - General Lighting 6 91 546 Manual On/Off 1 No vent In Zone: 3rd flr toilet rms In Space: Wmn's Tlt Rm 324 1 Compact Fluorescent General Lighting 3 23 69 Manual On/Off 1 2 Compact Fluorescent General Lg 3 35 105 Manual On/Off 1El In Space: Men's Tlt Rm 325 1 Compact Fluorescent General L in 4 23 92 Manual On/Off 1El 2 Compact Fluorescent General Li ting 5 35 175 Manual On/Off 1 ❑ In Space: Jan clst 323 1 Compact Fluorescent General Light g 1 60 60 Manual On/Off 1 ❑ In Space: coffee stn 326 1 Compact Fluorescent General Lighting 0� 1 60 60 Manual On/Off 1 ElIn Zone: 3rd flr Mech Rm 328 In Space: Mech Rm 328 0 1 Recessed Fluorescent - General Lighting 60 540 Manual On/Off 1 No vent In Zone: 3rd fir equip. rms In Space: Elec. Rm 329 1 Compact Fluorescent General Lighting 60 120 Manual On/Off 1 In Space: Data/Tele 243 4/16/2008 EnergyGauge Summit® v3.13 17 1 Compact Fluorescent General Lighting 1 60 60 Manual On/Off 1 In Zone: 3rd flr corridors In Space: Corridor 322/327 1 Compact Fluorescent General Lighting 43=-, 62 2666 Manual On/Off 4 In Zone: 3rd -fir Cnf 336 In Space: Conf Rm. 336 " 1 Recessed Fluorescent - General Lighting 4 91 364 Manual On/Off 1 No vent In Space: Stor 336A 1 Recessed Fluorescent - General Lighting 1 62 62 Manua] On/Off 1 No vent In Zone: 1st fir Calibration In Space: Calibration 002 r 1 Recessed Fluorescent - General Lighting'- 15 124 1860 Manual On/Off 1 ❑ No vent In Space: Equipment Rooms 1 Recessed Fluorescent - General Lighting 2 90 180 Manual On/Off 1 No vent Walls No , Description Type Width H (Effec) Multi Area DirectionConductance Heat Dens. R-Value IN [ft] plier [sfl [Btu/hr. sf. F] Capacity [lb/cf] 1h.sEF/Btu] [Btu/sLF] In Zone: Stairwells 1 8" PRECAST PANEL 8" Precast Panel 32.00 61.50 1 1968.0 East 0.5963 18.676 140.00 1.7 ❑ 2 8" PRECAST PANEL 8" Precast Panel 25.00 51.50 1 1287.5 West 0.5963 18.676 140.00 1.7 ❑ 3 8" PRECAST PANEL 8" Precast Panel 12.00 10.00 1 120.0 North 0.5963 18.676 140.00 1.7 ❑ 4 8" PRECAST PANEL 8" Precast Panel 12.00 9.00 1 108.0 South 0.5963 18.676 140.00 1.7 ❑ In Zone: 1st fir corridors 1 8" PRECAST 8" Precast Panel, 6.00 8.00 2 48.0 North 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 1st fir maint. V2008 EnergyGau- '"nmmit® v3.13 18 1 8" PRECAST 8" Precast Panel 46.00 20.00 1 920.0 PANEL/MT - - - - -- STD@ 16"/R-13 BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel 46.00 20.00 1 920.0 PANEL/MTL STD@ 16"/R-13 BATT/5/8" GYP East 0.5963 18.676 140.00 1.7 West 0.5963 18.676 140.00 1.7 ❑ 3 8" PRECAST 8" Precast Panel 202.00 20.00 1 4040.0 South 0.5963 18.676 140.00 1.7 ❑ PANEL/MTL STD@ 16"/R-13 BATT/5/8" GYP In Zone: 1st fir EM areas 1 8" PRECAST 8" Precast Panel, 54.00 15.00 1 810.0 East 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 1st fir MM/GML 1 8" PRECAST 8" Precast Panel, 18.00 15.00 1 270.0 West 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 1st flr M/TE 001 1 8" PRECAST 8" Precast Panel, 31.0 ' 0 1 465.0 North 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 1st flr MM Offs 1 8" PRECAST 8" Precast Panel, 25.00 15 ; 1 375.0 West 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 1st flr FIN Offs 1 8" PRECAST 8" Precast Panel, 44.00 15.00Q 660.0 North 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 6.00 8.00 48.0 West 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 4/16/2008 EnergyGauge Summit® v3.13 19 3 8" PRECAST 8" Precast Panel, 6.00 8.00 1 48.0 PANEL/MTL Mtl Std@ 1611, R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 1st flr EM Offs 1 8" PRECAST 8" Precast Panel, 64.00 15.00 1 960.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. - BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 15.40 15.00 1 231.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 3 8" PRECAST 8" Precast Panel, 6.00 8.00 .1 48.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr I/C 205-209 1 8" PRECAST 8" Precast Panel, 56.00 15.00 1 840.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr conf rm 204 1 8" PRECAST 8" Precast Panel, 20.00 15.00 1 300.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 15.50 15.00 1 232.5 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr conf rm 220 1 8" PRECAST 8" Precast Panel, 20.00 15.00 1 300.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr plot rm 223 1 8" PRECAST 8" Precast Panel, 12.00 15.00 1 180.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 5/2008 EnergyGau- "ummit® v3:13 East 0.0656 19.214 95.80 15.2 North 0.0656 19.214 95.80 15.2 ❑ 11 East 0.0656 19.214 95.80 15.2 ❑ . 11 West 0.0656 19.214 95.80 15.2 ❑ 11 West 0.0656 19.214 95.80 15.2 ❑ 11 West 0.0656 19.214 95.80 15.2 ❑ 11 North 0.0656 19.214 95.80 15.2. ❑ North 0.0656 19.214 95.80 15.2 ❑ 11 North 0.0656 19.214 95.80 15.2 ❑ 11 20 ri ." In Zone: 2nd fir prg 218/219 -1-8' - . _ _ -AS 8"-PrecasfPane , - - M:00 r5:00 �- PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr conf rm 229 1 8" PRECAST 8" Precast Panel, 16.00 15.00 1 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 27.00 15.00 1 PANEL/MTL, Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr Library 230 1 8" PRECAST 8" Precast Panel, 68.00 15.00 1 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr I/C 211-215A 1 8" PRECAST 8" Precast Panel, 6000 15.00 1 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr Ping 224-228 1 8" PRECAST 8" Precast Panel, 50. .00 1 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd fir 244-251 000� 1 8" PRECAST 8" Precast Panel, 64.00 1 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. 0 BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 45.00 15.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 2nd flr all hands 4/16/2008 240.0 North 0.0656 19.214 95.80 15.2 ❑ 405.0 East 0.0656 19.214 95.80 15.2 ❑ 1020.0 East 0.0656 19.214 95.80 15.2 0 900.0 , North 0.0656 19.214 95.80 15.2 ❑ 750.0 North 0.0656 19.214 95.80 15.2 ❑ 960.0 South 0.0656 19.214 95.80 15.2 ❑ 675.0 East 0.0656 19.214 95.80 15.2 0 EnergyGauge Summit® v3.13 21 1 8" PRECAST 8".Precast Panel, 45.00 15.00 1 675.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 140.00 15.00 1 2100.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. t= BATT/5/8" GYP In Zone: 3rd fir N WkStn 1 8" PRECAST 8" Precast Panel, 170.00 15.00 1 2550.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 3rd flr S WkStns West 0.0656 19.214 95.80 15.2 South 0.0656 19.214 95.80 15.2 ❑ 11 North 0.0656 19.214 95.80 15.2 ❑ 11 1 8 PRECAST 8 Precast Panel, 170.00 15.00 1 2550.0 North 0.0656 19.214 95.80 15.2 ❑ 11 PANEL/MTL Mtl Std@ 16", R-13 STD@1.6"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 3rd flr Mgr 304-308 1 8" PRECAST 8" Precast Panel, 16.00 15.00 1 240.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 518" Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 50.00 15.00 1 750.0 PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 3rd flr Mgr 331-335 1 8" PRECAST 8" Precast Panel, 16.00 15.00 1 240.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 50.00 15.00 1 750.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 3rd flr Mgr 338-341 1 8" PRECAST 8" Precast Panel,' 16.00 15.00 1 240.0 PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP V2008 EnergyGaur ",tmmit® v3.13 North 0.0656 19.214 95.80 15.2 ❑ 11 West 0.0656 19.214 95.80 15.2 ❑ II North '0.0656 19.214 95.80 15.2 ❑ 11. East 0.0656 19.214 95.80 15.2 ❑ 11 South 0.0656 19.214 95.80 15.2 - ❑ II 22 ra 2 8" PRECAST 8" Precast Panel, 46.00 15.00 1 690.0 East 0.0656 19.214 95.80 15.2 ❑ STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 3rd flr Mgr 311-314 1 8" PRECAST 8" Precast Panel, 16.00 15.00 1 240.0 South 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 40.00 15.00 1 600.0 West 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 3rd flr Cnf 309 1 8" PRECAST 8" Precast Panel, 26.25 15.00 1 393.8 West 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@ 16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 3rd flr Cnf 336 1 8" PRECAST 8" Precast Panel, 26.25 15.00 1 393.8 East 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 040 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP In Zone: 1st flr Calibration 1 8" PRECAST 8" Precast Panel, 46.00;j;!: 1 690.0 North 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@ 16", R-13 STD@16 /R-13 Batt., 5/8 Gyp. BATT/5/8" GYP 2 8" PRECAST 8" Precast Panel, 33.00 1 0 495.0 West 0.0656 19.214 95.80 15.2 ❑ PANEL/MTL Mtl Std@16", R-13 STD@16"/R-13 Batt., 5/8" Gyp. BATT/5/8" GYP WlZO No Description Type Shaded U C Vis.Tra W H (Effec) Multi Total Area [Btu/hr sf F] A [ft] plier [sf] 4/16/2008 EnergyGauge Summit® v3.13 23 In Zone: 1st flr Calibration In Wall: West Wall 1 1/4" dual pane User Defined No 014500 0.52 0.57 4.00 4.00 1 16.0 high e In Zone: 1st flr EM areas In Wall: East Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 3 48.0 high e In Zone: 1st flr EM Offs In Wall:' North Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 . 4.00 3 48.0 high e In Zone: 1st flr FIN Offs In Wall: North Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 high e In Zone: 2nd flr 244-251 In Wall: East Wall v: 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 3 48.0 high e In Wall: South Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 3 48.0 high e In Zone: 2nd flr all hands In Wall: South Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 5 80.0 high e In Wall: West Wall 1 114" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 high e In Zone: 2nd flr conf rm 204 In Wall: West Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 high e . In Zone: 2nd flr conf rm 220 In Wall: North Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 high e In Zone: 2nd flr conf rm 229 In Wall: East Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 high e V2008 EnergyGau- "lunmit® v3.13 24 �,, , i. we s r. In Zone: 2nd flr IT 205-209 --- In Wa11-West Wall - - -- -- -- - 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 3 48.0 high e In Zone: 2nd flr Library 230 In Wall: East Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 0 high e In Zone: 2nd flr Ping 224-228 _ In Wall: North Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 3 48.0 ❑ high e In Zone: 2nd fir plot rm 223 In Wall: North Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 0 high e In Zone: 3rd flr Cnf 309 In Wall: West Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 high e In Zone: 3rd flr Cnf 336 In Wall: East Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 1 16.0 high e In Zone: 3rd flr Mgr 304-308 In Wall: West Wall 1 1/4" dual pane User Defined 0 0.4500 0.52 0.57 4.00 4.00 3 48.0 high e In Zone: 3rd flr Mgr 311-314 �O In Wall: West Wall 1 1/4" dual pane User Defined No 500 0.52 0.57 4.00 4.00 3 48.0 high e In Zone: 3rd flr Mgr 331-335 In Wall: East Wall 1 1/4" dual pane User Defined No M50 0.52 0.57 4.00 4.00 3 48.0 high e In Zone: 3rd flr Mgr 338-341 In Wall: East Wall 1 1/4" dual pane User Defined No 0.7%52 0.57 4.00 4.00 3 48.0 high e 4/16/2008 EnergyGauge Summit® v3.13 25 In Zone: 3rd flr N WkStn In Wall: North Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 4 64.0 high e _ .In Zone: 3rd fir S WkStns In Wall: South Wall 1 1/4" dual pane User Defined No 0.4500 0.52 0.57 4.00 4.00 9 144.0 high e - Doors No Description Type Shaded? Width H (Effec) Multi Area Cond. Dens. Heat Cap. R-Value IN fftj plier (sfl [Btu/hr. sf. F1 flb/cfj [Btu/sf. Fj Ih.sf.F/Btul In Zone: Stairwells In Wall: East Wall 1 exterior entry doo: Hollow core flush No 3.17 7.17 - 1 22.7 0.7553 0.00 0.00 1.32 In Wall: West Wall 1 exterior entry doo: Hollow core flush No" 3.17 7.17 2 22.7 0.7553 0.00 0.00 1.32 ❑ In Zone: 1st flr corridors In Wall: North Wall 1 exterior entry doo: Hollow core flush No 3.17 7.17 1 22.7 0.7553 0.00 0.00 1.32 In Zone: 1st flr maint. In Wall: East Wall 1 exterior insulated Aluminum door, No 14.00 14.00 1 196.0 0.1919 43.67 0.53 5.21 El 1.25 in. polystyrene In Wall: West Wall 1 exterior insulated Aluminum door, No 14.00 14.00 1 196.0 0.1919 43.67 0.53 5.21 Ej 1.25 in. polystyrene In Wall: South Wall 1 exterior insulated Aluminum door, No 10.00 10.00 3 100.0 0.1919 43.67 0.53 5.21 1.25 in. polystyrene 2 exterior entry doo: Hollow core flush No 3.17 7.17 3 22.7 0.7553 0.00 0.00 1.32 3 exterior insulated Aluminum door, No 14.00 14.00 1 196.0 0.1919 43.67 0.53 5.21 1.25 in. polystyrene V2008 EnergyGau- "ninmit® v3.13 26 Roofs No Description Type Width H (Effec) Multi Area Tilt Cond. Heat Cap Dens. R-Value A [ft] plier [sf] [deg] [Btu/hr. SE F] [Btu/sf. F] ]Ib/cf] [h.sLF/Btu] In Zone: Stairwells 1 PRECAST 6" Hollow Core 28.50 24.00 1 684.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE ROOF PLANKS Planks, R-22 Ins., Roof Membrane In Zone: 1st flr equip. rms 1 PRECAST 6" Hollow Core 9.50 12.00 1 114.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr N WkStn 1 PRECAST 6" Hollow Core 94.00 94.00 1 8836.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr S WkStns I PRECAST 6" Hollow Core 78.00 78.00 1 6084.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd fir Mgr 304-308 1 PRECAST 6" Hollow Core 5 6.00 1 300.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., 0 ROOF PLANKS Roof Membrane In Zone: 3rd flr Mgr 331-335 I PRECAST 6" Hollow Core 5 .00 15.00 1 750.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr Mgr 338-341 1 PRECAST 6" Hollow Core 46.00 .00 1 690.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr Mgr 311-314 I PRECAST 6" Hollow Core 46.00 15.0 1 690.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr Cnf 309 4/16/2008 EuergyGauge Summit® v3.13 27 1 PRECAST 6" Hollow Core 26.00 15.50 1 403.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd fir Cnf 319 1 PRECAST 6" Hollow Core 21.00 20.00. ? 1 420.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd fir Cnf 320 1 _PRECAST 6" Hollow Core 21.00 20.00 `'` 1 420.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr Cnf 316 1 PRECAST 6" Hollow Core 18.00 25.00 1 450.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr Cnf 317 1 PRECAST 6" Hollow Core 18.00 . 25.00 1 450.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW -CORE Planks, R-22 Ins., > ROOF PLANKS Roof Membrane _ In Zone: 3rd flr Cnf 318 W 1 PRECAST 6" Hollow Core 18.60" 25.00 1 450.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr Cnf 315 1 PRECAST 6" Hollow Core 24.00 25.00 1 600.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr toilet rms. 1 PRECAST 6" Hollow Core 26.00 28.00 1 728.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd flr Mech Rm 328 1 PRECAST 6" Hollow Core 36.00 25.00 1 900.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: .3rd flr equip. rms 1 PRECAST 6" Hollow Core 10.00 26.00 1 260.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane In Zone: 3rd fir corridors J2008 EnergyGau- '11mmit® v3.13 28 A. 1 PRECAST 6" Hollow Core 6.00 500.00 1 - - - 3000.0 0.00 0.0388 10.91 51.74 25.8 ❑ a s- _ - - ROOF PLANKS Roof Membrane In Zone: 3rd flr Cnf 336 1 , PRECAST 6" Hollow Core 26.00 16.00 1 416.0 0.00 0.0388 10.91 51.74 25.8 ❑ HOLLOW CORE Planks, R-22 Ins., ROOF PLANKS Roof Membrane Skylights No Description Type U SHGC Vis.Trans W H (Effec) Multiplier Area Total Area [Btu/hr sf F] IN [ft] [Sf] [Sf] In Zone: In Roof: EJ Floors No Description Type Width H (Effec) Multi Area Cond. Heat Cap. Dens. R-Value /jet] [ft] plier [sf] [Btu/hr. sf. F] [Btu/sf. F] [Ib/cf] jh.sf.F/Btu] In Zone: Stairwells V0 1 slab on grade slab on grade 11.50 1 563.5 0.4000 34.00 113.33 2.50 ❑ In Zone: 1st fir corridors 1 concrete over crawl Concrete floor, 250.00 1 1500.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber pad In Zone: lst fir maint. 1 In Zone: slab on grade 1st fir EM areas slab on grade 107.00 07.00 1 11449.0 0.4000 34.00 113.33 2.50 ❑ 1 concrete over crawl Concrete floor, 6.00 38 0 1 2304.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber pad _ In Zone: 1st fir MM/GML 1 concrete over crawl Concrete floor, 72.00 28. 2016.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber pad In Zone: 1st flr wkst 119/120 4/16/2008 EnergyGauge Summit® v3.13 29 1 concrete over crawl Concrete floor, 42.00 54.00 1 2268.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber pad In Zone: 1st flr MUTE 001 1 concrete over crawl Concrete floor, 32.00 31.00 : --.-1 992.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber pad In Zone: 1st fir MM Offs _ 1 concrete over crawl Concrete floor, 10.40 15.00 7 156.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber (, . pad In Zone: 1st flr FIN Offs 1 concrete over crawl Concrete floor, 10.40 15.00 7 156.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber pad In Zone: 1st flr EM Offs 1 concrete over crawl Concrete floor, 10.40 15.00 7 156.0 0.5987 9.33 140.00 1.67 ❑ space carpet and rubber' pad In Zone: 1st flr tlt rms 1 concrete over crawl 6IN Hollow Core 26.00 36.00 1 936.0 0.1.882 30.00 100.00 5.31 ❑ space Over Crawlspace' In Zone: 1st flr equip. rms 1 concrete over crawl 6IN Hollow Core 26.00 36.00 1 936.0 0.1882 30.00 100.00 5.31 ❑ space Over Crawlspace 2 slab on grade slab on grade 8.00 12.00 1 96.0 0.4000 34.00 113.33 2.50 ❑ In Zone: 1st flr Mech Rm 138 1 concrete over crawl 61N Hollow Core 24.00 34.00 1 816.0 0.1882 30.00 100.00 5.31 ❑ space Over Crawlspace In Zone: 1st flr Calibration 1 concrete over crawl Concrete floor, 10.40 15.00 7 156.0 0.5987 9.33 140.00 1.67 ❑ space carpet and. rubber pad Systems AHU-1 air handler first floor maintenance bay Variable Air Volume Built-up System No. Of Units 1 Component Category Capacity Efficiency IPLV 5/2008 EnergyGau- "ummit® v3.13 i 30 1 Cooling System 509000.00 2 Air Handling System -Supply 12800.00 AHU-2 air handler first floor offices and work areas Variable Air Volume Built-up System No. Of Units 1 Component Category Capacity Efficiency IPLV 1 2 Cooling System Air Handling System -Supply 506000.00 12800.00 0.87 AHU-3 air handler second floor. Variable Air Volume Built-up System No. Of Units 1 Component Category Capacity Efficiency IPLV 1 2 Cooling System Air Handling System -Supply 1136000.00 28500.00 0.79 ❑ AHU-4 air handler third floor. Variable Air Volume Built-up System No. Of Units 1 Component Category Capacity Efficiency IPLV 1 2 Cooling System itW Air Handling System -Supply 0000 1136000.00 28500.00 0.79 El AC-1 Calibration Area, R a -006 Constant Volume Two Pipe Fan -Coil Built-up System No. Of Units 1 Component Category A01ib. Capacity Efficiency IPLV 1 2 Cooling System Air Handling System -Supply 109600.00 5250.00 0.57 AC-2/AC-3 Stairwell "A" & "B" cool g an ventilation Constant Volume Packaged System No. Of Units 2 Component Category Capacity Efficiency IPLV 1 2 Cooling System Air Handling System -Supply 13600.00 13.00 330-.00 0.80 ❑ El 4/16/2008 EnergyGauge Summit® v3.13 31 Plant Equipment Category Size Inst.No Eff. IPLV 1 Hermetic screw or scroll chiller Cooling Equipment -. 200.0 [Tons] 2 5.52 [COP] 6.66 Water Heaters W-Heater Description Capacit3Cap.Unit I/P Rt. Efficiency Loss 1 Electric water heater 20 [Gal],,. 5 [kW] 80.0000 [Ef] [Btu/h] ❑ Ext-Lighting Description Category No. of Watts per Area/Len/No. of units Control Type Wattage _ Luminaires Luminaire [sf/ft/No] [w] 1 F13 Outdoor Emer. Main entries - '.,> 2 6 3.00 Photo Sensor control 12.00 ❑ 2 F13 Outdoor Emer. Main entries- 2 6 3.00 Photo Sensor control 12.00 ❑ 3 F13 Outdoor Emer. Other (doors) than main 2 6 3.00 Photo Sensor control 12.00 ❑ entries 4 F13 Outdoor Emer. Other (doors) than main 2 6 3.00 Photo Sensor control 12.00 ❑ entries 5 F13 Outdoor Emer. Other (doors) than main 2 6 3.00 Photo Sensor control 12.00 ❑ entries 6 F13 Outdoor Emer. Other (doors) than main 2 6 3.00 Photo Sensor control 12.00 ❑ entries 7 F13 Outdoor Emer. Other (doors) than main 2 6 3.00 Photo Sensor control 12.00 ❑ entries 8 F 11 Exterior Light Outdoor sales open areas 25 200 10010.00 Photo Sensor control 5000.00 ❑ (inc vehicle sale lots) Piping No Type yp Operating Insulation Nomonal pipe Insulation Is Runout? Temperature Conductivity Diameter Thickness [F] [ Btu-in/h.sf.F] [in] [in] :/2008 EnergyGau- "*immit® v3.13 32 .. ,z to, 'r 1 Cooling Systems (Chilled Water, Brine and Re 44.00 0.24 - -- -__ 6.00 __ 1.50 No ❑ rgerant)--- 2 Domestic and Service Hot Water Systems 130.00 0.34 1.00 1.00 No ❑ Fenestration Used Name Glass Type No. of Glass SHGC VLT Panes Conductance [Btu/h.sf.F] ASHULTp1ClrW User Defined 3 0.4500 0.5200 0.5700 ❑ d-Vy-Fg frm Materials Used Mat No Acronym Description Only R-Value RValue Thickness Conductivity Density SpecificHeat Used [h.sf.F/Btu] IN [Btu/h.ft.F] [lb/cf] [Btu/1b.Fl 264 Mat1264 ALUMINUM, 1/16 IN No 0.0002 0.0050 26.0000 480.00 0.1000 0 214 Mat1214 POLYSTYRENE, EX� ?� No 5.2100 0.1042 0.0200 1.80 0.2900 ❑ 1-1/4IN, 151 Matl151 CONC HW, DRD, 140LB �0 No 0.4403 0.3333 0.7570 140.00 0.2000 ❑ 4IN 178 Mat1178 CARPET W/RUBBER PAD s 1.2300 El 265 Mat1265 Soil, 1 ft N 2.0000 1.0000 0.5000 100.00 0.2000 ❑ 48 Mat148 6 in. Heavyweight concrete N 0.5000 0.5000 1.0000 140.00 0.2000 ❑ 1001 ApLbMat1001 GYP OR PLAS 0.5663 0.0521 0.0920 50.00 0.2000 ❑ BOARD,5/8IN0- 1002 ApLbMat1002 Outside surface resistance 0.3300 ID1003 ApLbMat1003 8 in. Heavyweight concrete NN 0.6670 0.6670 1.0000 140.00 0.2000 ❑ 1004 ApLbMat1004 INSIDE SURFACE AIR Yes 0.6800 ❑ FILM, VERT. WALLS 1005 ApLbMat1005 INSIDE SURFACE AIR Yes 0.7600 ❑ FILM, HORIZ. ROOFS 1007 ApLbMat1007 R-13 Generic Insulation No 13.0000 0.2837 0.0218 0.30 0.2000 ❑ 4/16/2008 EnergyGauge Summit® v3.13 33 1008 ApLbMat1008 R-22 Generic Insulation No 22.0000 0.4802 0.0218 0.30 0.2000 ❑ 1010 ApLbMat1010 61N Hollow Core Roof Plank No 2.4038 0.5000 0.2080 100.00 0.2000 ❑ 1011 ApLbMat1011 3/8 in. Felt and membrane No 0.2845 0.0313 0.1100 70.00 0.4000 ❑ 1012 ApLbMat1012 Air space resistance Yes 0.9100 ❑ Constructs Used No Name Simple '�tonstruct Massless Conductance Heat Capacity Density RValue Construct. [Btu/h.sf.F] [Btu/sf.F] [lb/cf] [h.sf.F/Btu] 1002 Aluminum door, 1.25 in. polystyrene No -I• No 0.119 0.53 43.67 5.2 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 264 ALUMINUM, 1%16 IN--- 0.0050 0.000 ❑ 2 214 POLYSTYRENE;-EXP., '1-1/41N, 0.1042 0.000 ❑ ' 3 264 ALUMINUM, 1/1.&IN 0.0050 0.000 ❑ No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sLF] [Btu/sf.F] [lb/cf] [h.sLF/Btu] 1004 Concrete floor, carpet and rubber pad No No 0.60 9.33 140.00 1.7 ❑ Layer Material Material Thickness . Framing No. [ft] Factor 1 151 CONC HW, DRD, 140LB, 41N 0.3333 0.000 ❑ 2 178 CARPET W/RUBBER PAD 0.000 ❑ No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.F] [Btu/sf.F] [Ib/cf] [h.sf.F/Btu] 1025 Hollow core flush No Yes 0.76 1.3 ❑ Layer Material Material Thickness Framing No. [ft] Factor 1 276 Hollow core flush (1.75") 0.000 ❑ V2008 EnergyGaup--nmmit® v3.13 34 Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu Ii sf.F][IlTfl—[Imsf.F/Bf —u[ 1060 8" Precast Panel, Mtl Std@16", R-13 Batt., No No 0.07 19.21 95.80 15.2 ❑ 5/8" GYP• Layer Material Material Thickness Framing No. IN Factor 1 1002 Outside surface resistance 0.000 ❑ 2 1003 8 in. Heavyweight concrete 0.6670 0.000 ❑ 3 1007 R-13 Generic Insulation 0.2837 0.000 ❑ 4 1001 GYP OR PLAS BOARD,5/8IN 0.0521 0.000 ❑ 5 1004 INSIDE SURFACE AIR FILM, VERT. 0.000 ❑ WALLS No Name Simple Massless Conductance Heat Capacity Density RValue Construct Construct [Btu/h.sf.F] [Btu/sf.F] [lb/cfl [h.sf.F/Btuj 1061 6" Hollow Core Planks, R-22 Ins., Roof No No 0.04 10.91 51.74 25.8 ❑ Membrane Layer Material Material Thickness Framing No. [ft] Factor 1 1002 Outside surface�rs�is 0.000 ❑ 2 1011 3/8 in. Felt and me ne 0.0313 0.000 ❑ 3 1008 R-22 Generic Insulati 0.4802 0.000 ❑ 4 1010 61N Hollow Core Roof lank 0.5000 0.000 ❑ 5 1005 INSIDE SURFACE AIR FI Z. 0.000 ❑ ROOFS 4/16/2008 EnergyGauge Summit® v3.13 35 No Name Simple Construct Massless Conductance Heat Capacity Construct [Btu/h.sf.F] [Btu/sEF] Density [Ib/cf] RValue [h.sf.F/Btu] 1062 8" Precast Panel No No 0.60 18.68 140.00 1.7 ❑ Layer Material Material Thickness Framing No. IN Factor 1 1002 Outside surface resistance 0.000 ❑ 2 1003 8 in. Heavyweight concrete 0.6670 0.000 ❑ 3 1004 INSIDE SURFACE AIR FILM, VERT. 0.000 ❑ WALLS No Name Simple Construct Massless Conductance Heat Capacity Construct [Btu/h.sf.F] [Btu/sf.F] Density [lb/cf] RValue [h.sf.F/Btu] 1064 61N Hollow Core Over Crawlspace No' No 0.19 30.00 100.00 5.3 ❑ Layer Material Material Thickness Framing' No. [ft] Factor 1 1010 61N Hollow Core Roof Plank 0.5000 0.000 ❑ 2 265 Soil, 1 ft 1.0000 0.000 ❑ 3 1012 Air space resistance 5.0000 0.000 ❑ No Name Simple Construct Massless Conductance Heat Capacity Construct [Btu/h.sf.F] [Btu/sf.F] Density [lb/cf] RValue [h.sf.F/Btu] 1066 slab on grade No No 0.40 34.00 113.33 2.5 ❑ Layer Material Material Thickness Framing No. IN Factor 1 48 6 in. Heavyweight concrete 0.5000 0.000 ❑ 2 . 265 Soil, 1 ft 1.0000 0.000 ❑ 5/2008 EnergyGau- 'ummit® v3.13 36 M e.t 1