Loading...
HomeMy WebLinkAboutRESPONSE TO REVIEW-COMMENTS Knight, McGuire &Associetes, Inc. Consulting Engineers and Planners 80 Royal Palm Pointe, Suite 401 Vero Beach, Florida 32960 David S. Knight, P.E. Phone: (772) 569-5505 cott B. McGuire, P.E. RECEP• D OCT 12 1015 Fax: (772) 569-1455 ctober 7, 2015 �CANN Lydia Galbraith & Ed Roseberry, Plans Examiners BY fanning and Development Services Dept. •Lude c6an Building & Permitting, St. Lucie County 300 Virginia Avenue Fort Pierce, FL 34982 e: Queen Island Preserve— Lot 5 Permit Application: 1508-0425 i ear Madam and Sir: I'n response to your review comments dated August 31, 2015, and September 24, 2015, respectfully, for the above mentioned project, we have affected the followings changes to the nginal submitted drawings: STRUCTURAL 1. Structural Plans must be stamped"NOT FOR CONSTRUCTION"... i lans are now stamped "CONSTRUCTION SET". General Notes (Sheet S-1) revised. 2. tructural Plans sheet S-1 Design Criteria shows 160mph...Architectural shows 170mph... j 60mph Vult is the correct design wind speed for the project location and occupancy lassification; the architectural drawings shall have to reflect this... 3. Structural Plans Design Criteria mean roof height at 35'...Architecturals at 37-8" ...... tructural and Architectural Plans now demonstrate the same mean roof height(Sheet S- - Design Criteria & Site Plan - Building Height Analysis). 4. ubmit Soil Report in duplicate... oils Report included with this submittal. 5. Please detail depth of saw-cuts for Frangible Slabs Refer to detail "FRANGIBLE SLAB DETAIL" sheet S-3. 6. Dlease show compliance with R322.2.2 for Flood Vents in enclosed areas below base flood... ighest Adjacent Natural Grade is at 8.80 NAVD (refer to revised Site Plan); we have set he lowest Garage elevation at 11.00 to comply with the code without the need for enting. This shall place the Finish Floor elevation for the structure at 22.50' NAVD. This hange affects pile elevations, as revised on Sheet S-2. i ZONIN 1. 'Please indicate the overhang of the bathroom on 1st floor as dotted line on the survey... Cantilevered First Floor Bathroom has been re-designed to be outside the building setback; associated roof overhang shall not extend more than 30" into the setback. efer to Site Plan &Structural Plans Sheets S-4, S-5. ,Responses to any comment not listed above shall be addressed by the Architect. If you have any questions or need additional information please do not hesitate to contact me. �I incerely, ' David S. Knight, P.E.