Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST1 Phone 954-784-2941 800-848-1919 l�p� Fax 954-784-7875 Jedera, TING INC. SCAB 250 SW 13th Ave PomR no Beach, FL 33069 BY / wwH►.fed-eng.COm 14 ke Field Density Tests of t mpacted Soils Method D-6938 Client: M, I-Ry Construction Date: December 14, 2015 Address: 1/ 967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 15-2609 Project: Oroposed Single Family Home 1 � P 9 Permit #: Address: I,a0 Nettles.Blvd., Jensen Beach, FL 34957 Tech: CO Area Testetl Footing Compaction Req.: 95% Material TIpe: Pale Brown Sand with Some Shell Proctor Method: ASTM D-1557 Test # I' TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 SJtlth Footing at Center 12" BOF 10.2 102.8 106.1 11.9 96.9% Yes 2 Ngrth Footing at Center 12" BOF 10.4 102.6 106.1 11.9 96.7% Yes 3 fast Footing at Center 12" BOF 10.9 102.9 106.1 11.9 97.0% Yes 4 5�I. 61 71 19 j 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Disclaimer This is a Compaction Test only on the top 12" of the Footings and is not a verification of Soil, Bearing Capacity. Legend for Elevation: PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc; P.E. t� r�t SG = Subgrade BG = Below Grade Federal Engineering & Testing, Inc.- BC = Basecourse BOF = Bottom of Footing Florida -Reg. No. 59394 . TOP = Top of Pipe FG Finished Grade Certificate of Authorization,#5471 As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorizatibn for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms; retesting must be performed on this work. PAGE 1 of 2 i _i Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on -the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis,of the sail materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of'services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re- tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Pana 9 of t III f ei-a TESTING INC. 260 SW 13th Ave Pot,', ano Beach, FL 33069 Phone 954-784-2941 800-848-1919 Fax 954-784-7875 www.fed-eng.com III Field Density Tests of Compacted Soils Method D-6938 Client: Nj,el-Ry Construction Date: January 6, 2016 Address: 1, 967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 16-130 Project: ,,fro osed Single Family Home Permit #: Address: ; 0 Nettles Blvd., Jensen Beach, FL 34957 Tech: CO Area Tested,' Building Pad Compaction Req.: 95% . Material Typie. Pale Brown Sand with Some Shell Proctor Method: ASTM D-1557 Test # TEST LOCATION III I Probe Depth Elev. Moist ° /0 Dry Density PCF Proctor Value PCF ' Optimum Moisture Compaction Pass 1 I'I SE Corner of Pad 12" FL 11.5 101.9 106.1 11.9 96.0% Yes 2 Cent l`r of Pad 12" FL 11.4 102.1 106.1 11.9 96.2% Yes 3 I NW el orner of Pad 12" FL 11.7 102.0 106.1 11.9 96.1 % Yes 4 III 5 II I6 � 7 II 8 III 9 II 10I 11 !il 12 I'I 13 14 111 Rema�','kS: See Reverse Side (Page 2 of 2) for Disclaimer This is a Compaction Test only on the top 12" of the Pad and is not a verification.of'Soil Bearing Capacity. Legend for Elevation: PR = I1oofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Springline FL = Final Lift Keith LeBlanc, P.E.- SG = IISlubgrade BG = Below Grade Federal Engineering & Testing, Inc. BC = 6asecourse BOF = Bottom of Footing Florida, Reg. No. 59394 I TOP �-�`tual Top of Pipe FG = Finished Grade Certificate of Authorization #5d,71 protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, land agthorization,fIor publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. Aldensity does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this wo�. PAGE 1 of 2 Compacted Soils Method D-6938 Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed..Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re- tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2