Loading...
HomeMy WebLinkAboutFIELD DENSITY TEST°1 JUL 14 2015 Phone 954-784-2941 edera"t r 800-848-1919 WAMED Public works Fax 954-784-7875 8 TESTING INC. By St:. Lucie County, i-i- www.fed-eng.com 250 SW 13th Ave „ompano Beach, FL 33069 RuLude (( oun Field Density Tests of Compacted Soils Method D-6938 Client: el-Ry Construction Date: July 8, 2015 Address: 110967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: " 15-1266 Project: ;Proposed Single Family Home Permit #: Address: 1110701 S. Ocean Drive, Lot 697, Jensen Beach, FL Tech: AM Area Teste�: Footing for Stem Wall Compaction Req.: 95% Material T�;pe: Light Gray Sand with Traces of Shell Proctor Method:. ASTM D-1557 Test # TEST LOCATION li�I Probe Depth Elev. MoistDry '/o Density PCF Proctor Value' .PCF Optimum Moisture % Compaction Pass — 1 NE Co,,ner of Footing 12" FL 3.3 102.0 103.5 11.0 98.6% Yes 2 1 South,,IIII ide of Footing 12" FL 4.0 . 100.7 103.5 11.0 97.3% Yes 3 NW C I Irner of Footing 12" FL 4.5 102.5" 103.5 11.0 99.0% Yes 4 i 5 it it6 7 8 i 9 10 III 11 12 13 II 14 l Remarksjjj See Reverse Side (Page 2 of 2) for Disclaimer ,, , , This is a Compaction Test only on the top 12" of the footings and is not a verification' ot Soil Bearing Capacity. Legend for I.levation: f/ PR = Proof i II 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: SL = Sprin line FL = Final Lift KeithIeBlanc, SG = Subg ade BG = Below Grade Federal=Engineering.&-Testing, Inc. BC = Base urse BOF = Bottom of Footing Florida Reg. No. 59394 TOP = Toptf Pipe FG = Finished Grade Certificat6of Authorization #5471 As a mutual 'lotection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and-,nuthorization fof publication of statements, conclusions o�extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of oompaction`bf,the tested layer of material only. A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms; retesting must be performed on this work. II� i PAGE 1 of 2 �.r Compacted Soils Meth od`D-6938.Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the ,reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test', must be performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top 12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting the proposed structure without settlement. This density, compaction test does not warranty any underlying soil materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying soil conditions. Environmental analysis of the soil materials is not part of the scope of ,services. If environmental analysis of the soils is =rcgvlred; we -can -provide a proposal ,for performing an environmental analysis 'of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re- tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our:client and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. It has been a pleasure working with you and we look forward to doing so in the near future. Page 2 of 2