Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORMPlanning &Development Services r_ t Building &Code Regulation Division RFC 2300 Virginia Ave, Rm 201 FI�FD. • Fort Pierce; FL 34982. per FFB: 2 6 ?01e . Phone: 772 462-2165 Fax: 772=462-6443 S4. �ttin s�Uae �� q m� � BLOWER DOOR,TEST FORM. w -B House Infiltration -Test Certification.. � Ln1 9� ��� Prescriptive and Performance Method. a.57l v Date: Permit M. Contractor:..... Job Address:.. l . �661Swe-- :Construction: New Construction '"Comp.lete ( ).Existing After Addition--. (q� �:, House InfiltrationTest Results SLC.Climate Zone 2. CFM (50) 5 : '.. Test Date: Volume ACH (50) =.CFM �(50).x 60-/-Volume Quired less than 3 ACH ' � M chanical Ventilation re Passing results Must be &ACH (50) or less ) Pass ( )Fail FBC, Energy. The building:or dwelling unit; shall be tested andberified as having an air leakage. rate of not'exceeding pair changes per hour in: Climate -Zone 1,:-2 and 3 air changes per hour.in Climate Zones 3.through 8.- Testing'shall be conducted With a, blower.door;at a pressure of:0,2 inches.w: g, (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (1), Florida Statutes or individuals licensed as set forth in Section 489.10.5 (3)(f); (g) or (i),or an approved third party,.' A written report of the results of test shall be signed by. the_ party:conducting the, test and provided to the code.officibl. Testing shall be performed at anytime after -creation of. all. pehetrations of. thebuilding thermal envelope.: . FBC, Residential Where:the.air.infiitration rate .of. a dwel.iing.ur' it.is less ihan.3 air.changes per hour when tested with a blower door at a . . pressure.of 0.2 inch w. _c.. (50:Pa) in accordance'with Section R402.4.:1.2 of the Florida Building Code,:Energ}r Conservation the dwelling.unit shall.be provided with:whole=house mechanical Ventilation in accordance with Section M1507.3:.. Testing Company / '7 %'� (. ( ` / ! Company Name: &FA Address: (.CD (%PW G. W► 69C .. (� V PISLr l hereby certify that the above House Infiltration.results demonstrate compliarice with FBC Energy Conservation requirements accord ce w th Section 11402.4:1.2 Climate Zone 2. ISO7_ O'GSI� \1 t : Planning& -Development Services C Building & Code Regulation DivisionF p 2300 Virginia Ave, Rm 201 Cop • Fort Pierce,.FL.,34982_ • er ?0 772Ak-2165 Fax 772- U-M43 SF Ong �e �B U�� par FBC ENERGY CONSERVATION CODE e �0�nty enF Duct Sealing Certification Prescriptive and Performance Method 'Date: Permit #: ` 2i O.� • Lot #: . - Address: o Contractor: \" C..hb.ra�St. Df.. Cons(ruction:. ' .Post Construction Test o Rough -in Test Test Conditions: Date: Floor Area (ft2):.. Time: 1 0.0 Primary Location of Supply Ductwork Indoor Temperature (F):. �Primery Location 'of Return Ductwork . . Outdoor Temperature (F):.. 7( Total Leakade-Test (Outside) = . Duct Leakage: ❑ Default , ❑Prop: Leak Free " Proposed On D .; [) 3. Test Pressure: (Pa) :. �. Baseline Duct Pressure option al : Pa mil. c2 Duct Press. (Pa) . Flow Ring - Fan Press Flow (cfm): Results: 4 Pass ❑. Fail Install Pa Total Leakage (cfm): . Total Leakage per100 sgft: GFGr� CFM25 z 100 divided by the CFA ' -Duct Leakage CFM1100 sqft. -