TRI-BUILT Materials Group, LLC Evaluation Report A42970.10.12-R2
PO Box 70 ST. Lucie County, Permitting
FL160222112 '.
Rutherford, NJ 07070 Date of Issuance:10123/2012
[8001516-1485 Revision 2: 09/25/2017
his Evaluation Report is issued under Rule 61G20-3 and the applicable rules and regulations governing the use of
Dnstruction materials in the State of Florida. The documentation submitted has been reviewed by Robert Nieminen,
.E. for use of the product under the Florida Building Code. The product described herein has been evaluated for
Dmpliance with the 6eh Edition (2017) Florida Building Code sections noted herein.
TRI-BUILT Modified Bitumen Roof Systems
Labeling shall be in accordance with the requirements the Accredited Quality Assurance Agency noted
erein.
ONTINLIED COMPLIANCE: This Evaluation Report is valid until such time as the named product(s) changes, the referenced
luality Assurance documentation changes, or provisions of the Code that relate to the product change. Acceptance of
lis Evaluation Report by the named client constitutes agreement to notify Robert Nieminen, P.E. if the product
hanges or the referenced Quality Assurance documentation changes. Trinity) ERD requires a complete review of this
valuation Report relative to updated Code requirements with each Code Cycle.
ADVERTISEMENT: The Evaluation Report number preceded by the words "Trinity I ERD Evaluated" may be displayed in
dvertising literature. If any portion of the Evaluation Report is displayed, then it shall be done in its entirety.
JSPECTION: Upon request, a copy of this entire Evaluation Report shall be provided to the user by the manufacturer or
s distributors and shall be available for inspection at the job site at the request of the Building Official.
is Evaluation Report consists of pages 1 through 4, plus a 26-page Appendix.
epared by:
t J.M. Nieminen, P.E.
Registration No. 59166, Florida DCA ANE1983
FILE COPY
The facsimile seal appearing was authorized by Robert Nieminen,
P.E. on 09/25/2017. This does not serve as an electronically signed
document.
IFICATION OF INDEPENDENCE:
Exterior Research & Design, LLC. d/b/a Trinity I ERD does not have, nor does it intend to acquire or will it acquire, a financial interest
in any company manufacturing or distributing products it evaluates.
Exterior Research & Design, LLC. d/b/a Trinity I ERD is not owned, operated or controlled by any company manufacturing or
distributing products it evaluates.
Robert Nieminen, P.E. does not have nor will acquire, a financial interest in any company manufacturing or distributing products for
which the evaluation reports are being issued.
Robert Nieminen, P.E. does not have, nor will acquire, a financial interest in any other entity involved in the approval process of the
product.
This is a building code evaluation. Neither Trinityl ERD nor Robert Nieminen, P.E. are, in any way, the Designer of Record for any
project on which this Evaluation Report, or previous versions thereof, is/was used for permitting or design guidance unless retained
specifically for that purpose.
C)o
QI RIMTY I ERD
I APPENDIX (:-ATTACHMENT REQUIREMENTS FOR WIND UPLIFT RESISTANCE I
Table
Deck
Application
Type
Description
Page
1A-1
Wood
New or Reroof (Tear -Off)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
4
1A-2
Wood
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
5
1B
Wood
New, Reroof (Tear -Off) or Recover
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
5
1C
Wood
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
6
1D
Wood
New, Reroof (Tear -Off) or Recover
D
Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover
6
1E-1 Wood New or Reroof (Tear -Off) E Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover 7
1E-2
Wood
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
8
1F
Wood
New or Reroof (Tear -Off)
F
Non -Insulated, Bonded Roof Cover
8
2A
Steel or Structural concrete
New, Reroof (Tear -Off) or Recover ',;
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
9
2B
Steel or Structural concrete
New, Reroof (Tear -Off) or Recover -
C
Mech. Attached Insulation, Bonded Roof Cover
9
2C
Steel or Structural concrete
New, Reroof (Tear -Off) or Recover
D
Prelim. Attached Insulation, Mech. Attached Base Sheet, Bonded Roof Cover
10
3A
Structural concrete
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
11-14
3B
Structural concrete
New or Reroof (Tear -Off)
F
Non -Insulated, Bonded Roof Cover
14
4A
LWIC
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
15-16
4B
LWIC
New or Reroof (Tear -Off)
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
16
4C
LWIC
New or Reroof (Tear -Off).
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
17-19
SA
CWF
New or Reroof (Tear -Off)
A-1
Bonded Insulation, Bonded Roof Cover
- 20
513
CWF
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
21
5C
CWF
New, Reroof (Tear -Off) or Recover
B
Mech. Attached Base Insulation, Bonded Top Insulation, Bonded Roof Cover
5D
CWF
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
22
SE
CWF
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached Base Sheet, Bonded Roof Cover
%- 22
6A Gypsum New or Reroof (Tear -Off) A-1 Bonded Insulation, Bonded Roof Cover ._23
6B
Gypsum
New, Reroof (Tear -Off) or Recover
A-2
Mech. Attached Anchor Sheet, Bonded Insulation, Bonded Roof Cover
24
6C
Gypsum
New, Reroof (Tear -Off) or Recover
C
Mech. Attached Insulation, Bonded Roof Cover
24
6D
Gypsum
New, Reroof (Tear -Off) or Recover
E
Non -Insulated, Mech. Attached. Base Sheet, Bonded Roof Cover
24
7A
Various
Recover
A-1
Bonded Insulation, Bonded Roof Cover
25-26
7B
Various
Recover
F
Non -Insulated, Bonded Base Sheet, Bonded Roof Cover
26
The following notes apply to the systems outlined herein:
The roof system evaluation herein pertains to above -deck roof components. Roof decks and structural members shall be in accordance with FBC requirements to the satisfaction of the Authority Having Jurisdiction.
Load resistance of the roof deck shall be documented through proper codified and/or FBC Approval documentation.
2. Insulation / base sheet fasteners shall be of sufficient length for the following deck engagement:
➢ Wood: Minimum 0.75-inch penetration.
➢ Steel: Minimum 0.75-inch penetration and engage the top flute of the steel deck.
➢ Structural concrete: Minimum 1-inch embedment into pilot hole in accordance with fastener manufacturer's published installation instructions.
3. Unless otherwise noted, insulation may be any one layer or combination of polyisocya nu rate, polystyrene, wood fiberboard, perlite, gypsum -based roof board or mineral -wool roof board that meets the QA
requirements of F.A.C. Rule 61G20-3 and is documented as meeting FBC 1505.1 and, for foam plastic, FBC Chapter 26, when installed with the roof cover.
Exterior Research -and -Design, LLC. d/b/a Trinity IERD
Certificate of Authorization #9503
Prepared by: Robert Nieminen, PE-59166
67 EDITION (2017) FBC NON-HVHZ EVALUATION
TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485
- Evaluatio_n Report. A42970.30.12-R2 for FL16027-R2
Revision 2: 09/25/2017 1
Appendix 1, Page 1 of 26
TRINITY I ERD
15. Unless otherwise noted, refer to the following references for bonded base, ply or cap sheet applications.
TABLE 1: TRI-BUILT ROOF COVERS
Reference
Layer
Material
Application
BP -AA
Base Ply
FBC Approved ASTM D4601, Type II
HA at 20-40 Ibs/square
Ply
FBC Approved ASTM D2178, Type IV or VI
(Base and Ply sheets, Asphalt -Applied)
SBS-AA
(SBS, Asphalt -Applied)
Cap Ply
TriBuilt SBS Granular
HA at 20-40 Ibs/square
SBS-TA
Cap Ply
Tri13uiIt SBS Granular
Torch -Applied
(SBS, Torch Applied)
SBS-SA
%BaLQP,1V.Trig
lu It SA SBS ',Base {
Self -Adhering)
Self-Adhering(SBS,
T`1B-ulltSA SB -C-ap
APP-TA
Base Ply or Ply
TriBuilt APP Smooth
(APP, Torch -Applied)
Torch -Applied
Cap Ply
TriBuilt APP Smooth, TriBuilt APP Granular
APP-SA
(APP, Self -Adhering)
Cap Ply
TriBuilt SA APP Cap
Self -Adhering
16. Vapor barrier options for use over structural concrete deck followed by adhered insulation carry the following Maximum Design Pressure (MDP) limitations. The lesser of the MDP listings below vs. those in Table 3A
applies:
VAPOR BARRIER OPTIONS; STRUCTURAL CONCRETE DECK; ADHERED INSULATION PER TABLE 3A
Option #
Primer
Vapor Barrier
Insulation Adhesive
MDP (Psf)
Type
Attach
VB-1.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Inta-Stik or CR-20, 12-inch o.c.
-60.0
VB-2.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Insta-Stik, 12-inch o.c.
-75.0
VB-3.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
Millennium One Step Foamable Adhesive, 12-inch o.c.
-157.5
VB-4.
ASTM D41
TriBuilt SA SBS Cap
Self -Adhering
CR-20, 12-inch O.C.
-270.0
VB-5.
ASTM D41
TriBuilt SA SBS Base
Self -Adhering
Millennium One Step Foamable Adhesive, Millennium PG-1 Pump Grade
Adhesive, OlyBond 500 or CR-20, 12-inch o.c.
-290.0
17. Dens Deck shall be field -primed with PG100 prior to self -adhering membrane application. Refer to tables herein for other priming requirements.
18. "MDP" = Maximum Design Pressure is the result of testing for wind load resistance based on allowable wind loads. Refer to FBC 1609 for determination of design wind loads.
Exterior Research and Design, U.C. d/b/a Trinity IERD Evaluation Report A42970.30.12-R2 for FL16027-R2
Certificate of Authorization #9503 67 EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 3 of 26
�I TRINITY J ERD
- TABLE 5E-2: WOOD DECKS —NEW CONSTRUCTION, REROOF (TEAR -OFF) OR RECOVER
SYSTEM TYPE E: NON -INSULATED, MECHANICALLY ATTACHED BASE SHEET, BONDED ROOF COVER
System
Base Sheet
Roof Cover (Note 15)
MDP
No.
Deck (Note 1)
Base
Fasteners
Attach
Base Ply
Cap Ply
(Psf)
Min. 19/32-inch
Polyglass Elastobase, Polyglass Elastobase
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
W-1
plywood at max.
Poly, Polyglass G2 Base, CertainTeed
Roofgrip #14, Dekfast Hex with Dekfast #14
o.c. in two, equally spaced, staggered
more BP -AA or
SBS-AA, SBS-
-52.5
24-inch spans
Glasbase, Firestone MB Base, JM Perma-
or TruFast MP-3 with TruFast HD
center rows
APP-TA
TA, APP-TA
Ply 28, Tamko Glass Base or GAFGLAS #75.
Min. 19/32-inch
Polyglass Elastobase or Polyglass
#14 or TruFast MP-
Dekfast Hex with Dekfasto.c.
12-inch o.c. in 4-inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
W-2
plywood at max.
Elastobase Poly with poly top surface
3 with TruFast HD
in two, equally spaced, staggered
SA
SA, SBS-TA or
-52.5 ,
24-inch spans
center rows
APP-TA
Min.19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
(Optional) One or
SBS-AA, SBS-
W-3
plywood at max.
Elastobase Poly
Roofgrip #12
o.c. in two, equally spaced, staggered
more BP -AA or
TA, APP TA
60.0
24-inch spans
center rows
APP-TA
Min. 19/32-inch
Polyglass Elastobase or Polyglass
OMG Flat Bottom Plates (square) with
12-inch o.c. in 4-inch lap and 12-inch
One or more SBS-
SBS-SA, APP-
W-4
plywood at max.
Elastobase Poly with poly top surface
Roofgrip #12
o.c. in two, equally spaced, staggered
SA
SA, SBS-TA or
-60.0'
24-inch spans
center rows
APP-TA
TABLE 1,F: WOOD DECKS— NEW CONSTRUCTION OR REROOF"(TEAR-OFF)
SYSTEM TYPE F: NON -INSULATED, BONDED ROOF COVER
System
Roof Cover (Note 15)
MDP
No.
Deck
Primer
(Psf)
Joint Treatment
Base Ply
Ply
Cap Ply
W-5
Min. 15/32-inch plywood
(Optional) ASTM D41
None
SBS-SA
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
90.0
at max. 24-inch spans
APP-TA
or APP-TA
W-6
Min. 15/32-inch plywood
(Optional) ASTM D41
Plywood joints are covered with 4-inch wide strips of TriBuilt SA
TriBuilt SA SBS Base
(Optional) SBS-SA or
SBS-SA, APP-SA, SBS-TA
97.5
at max. 24-inch spans
SBS Base, rolled into place to create continuous bond.
APP-TA
or APP-TA
Exterior-Research-and-Design,-LL6. d/b/g Trinity I ERD- - _ _ _ _ — Evaluation Report A42970..10.-1-2-R2 for _FL36027=R2- _
Certificate of Authorization #9503 6T" EDITION (2017) FBC NON-HVHZ EVALUATION Revision 2: 09/25/2017
Prepared by: Robert Nieminen, PE-59166 TRI-BUILT Modified Bitumen Roof Systems; (800) 516-1485 Appendix 1, Page 8 of 26