HomeMy WebLinkAboutBLOWER DOOR TEST FORMSCANNED
BY
Planning; & Developmeliyt �q�i'vj�s���f��1..
C _ Building & Code Regulation Division
. 2300 Virginia. Ave, Rm 201 FILE PY
• Fort Pierce; FL 34982
Phone:712-462=2165 Fax:772-462=6443 RECEIVED
BLOWER. DOOR TEST FORM
F EB t' 9 2018
.
House Infiltration Test Certification. Permitting oeoartrnent .
St. i. 1i
.. Lucie
Prescriptive and Performance. Method .
i. f
Date: (g....(_. Permit #:: L.�Sb
Contractor: .. I. O .
Job �ddress: $FGOE -
Construction. (. ) New.Construction =.Complete ( ) Existing After Addition
Hou ',e Infiltratio Te t Results SLC Climate Zone 2.
i
(50) CF .... Test Date:
Vol Ine = .. 5
ACH (50) = CFM (50) x'66 /.Volume s Mechanical Ventilation required less than 3 ACH
Pass'ng results must. be & ACH .(50) :or less ) Pass ( ) Fail
FBC, Energy
:.
-The building.or dwelling unit shall be tested'and.vedfied as having an air leakage rate of not'exceeding 7 air changes per
hour i�p Climate Zone 1,. 2 and'3 air changes per hour.in' Climate Zones 3 through-B. Testing shall be conducted with a
blow�� door at a pressure of:0.2 inches w. g,. (50 Pascals). Testing shall be conducted by either.individuals as'defined in
Section 553.993(5) or (1), Florida Statutes or individuals licensed as set, foifth in Section-489..105 (3)(f),, (g) or (i).or an
approved third party.. � A:w.ritten report of the results of the test.shall be signed by:the party conducting the test and
provided to the code.official.- Testing shall be performed at any time after.creation of ail. penetrations of the building .
therim p/ envelope. :
FBC, Residential. .
where, ,the.air,infiltration rate of a dwelling unit is less than.3 a.ir.changes per hour when tested with a blower door at, a . .
J
pressure of 0.2 inch; w.-c. (50 Pa) in accordance :with Section R402.4.1.2 of the Florida Building Cdde, Energy Conservation
the d ,elling'unit shall.be provided with whole=house mechanical ventilation in accordance with Section M1507.3.
.Testing Company n �C
Company Name: Address. ��X woo V J
r w Fl�
.I hereb�i certify that the above: House_Infiltration results demoiistrate .compliance with FBC Energy Conservation
requirements in accord ce wi . Section R402.4:1.2 Climate Zone 2.
Signat�ire:
Printe (Name:
License Certification #:
I.
/Vu/—vDe;'—
S
Date: 'd- /) 8 /
�9M
' Post Construction Test
Teo Conditions: g Dale:
Time: (4D
Indoor Temperature (F): `7
Oti%door Temperature (F):
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
772-462-2165 Fax 772-462-6443
FBC ENERGY CONSERVATION CODE
Dud Sealing Certification
Prescriptive and Performance Method
Permit #: 1 h L ^ D
Address:
❑ Rough -in Test
R�CEI%XV
FILE
F1 t
n
Pad t
Peron le Coin
St.
Lot #: v
(ILS7ak Q_ !J �r `
Floor Area (ft2):
Primary Location of Supply Ductwork
Primary Location of Return Ductwork
I Kp_ !2(
N ji-
Total Leakage Test (Outside) 2
Dudt Leakage: ❑ Default ❑ Prop. Leak Free `Proposed On
TesilPressure: (Pa) (
Basbline Duct Pressure (optional) (Pa)k4\a 1 2�
Du IPress. (Pa) Flow Ring Fan Press Flow (cfm) Results: ass ❑ Fail
Installed
Total Leakage (cfm):
I
Total Leakage per 100 sgft:
I
I CFM25 x 100 divided by the CFA = Duct Leakage CFM/100 sqft.
y Name: GFA International, Inc.
certify that the above Duct Sepll
Address: 607 NW Commodity Cove, Port St. Lucie, Florida 34986
Leakage results demonstrate compliance with 5'h Edition FBC Energy Conservation requirements in accordance with
'�-'� License/Certificate #: