Field Density Tests of Compaicted-Sol[s_Method D-6938
Project; Il Proposed Residence Lot 61, C'reekside Date: October 5, 2018
Address. 8644 Cobblestone Drive, Fort Pierce, FL Order #: 18DR889
Area Tested: Building Pad Permit #: /�' y (� _ _ 6,
Materiq,l Type: Pale Brown Sand with Traces of Shell Tech: BK
Client: 1,1 D.R. Horton, Inc.
Addre s: 1430 Culver Drive NE Compaction Req.:
11 Palm Bav, FL 32907 Proctor Method:
95%
ASTM D-1557
Test
#
I TEST LOCATION
Probe
Depth
Elev.
.
Moist
oi
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
CI.
enter of Building Pad
12"
FL
7.9
108.2
109.6
12.0
98.7%
Yes
2
SE Comer of Building Pad
12"
FL
8.8
108.3
109.6
12.0
98.8%
Yes
3
I
W Corner of Building Pad
12"
FL
8.4
109.1
109.6
12.0
99.5%
Yes
4
5
I'I
6
i
7
i
8
9
10
I
11
12
13
14
3OHiV 4-6
Rem rks: See Reverse Side Page 2 of 2) for Additional Information for Disclaimer
This Is a Compaction Test only on the top 12" of the pad and is not a verification of S" Bearin' ° %ap��city.; y
Legen for Elevation:
PR = �oofroll 1;2,3 =1st, 2nd, 3rd Lift Submitted by: 4d;
:
SL = S'� ringline FL = Final Lift Keith LeBlanc, P'E`.%p,
SG = ubgrade BG = Below Grade Federal EnglneSnrLW'& stir, j-no.�
BC = asecourse BOF = Bottom of Footing Florida Reg. No.'�59��9L
TOP =�..al
op of Pipe FG = Finished Grade Certificate of Authorizaiory#/-' 7;.,
As a m protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
conclusi ins or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material
only. A c ensity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results
do not p eclude or guarantee that future settlement and cracking will not occur. A soil boring test Is required to certify that the underlying soils will support the proposed structure
without ettlement. If no soil borings have been performed to verify the underlying soils, we, recommend that soil borings be performed to evaluate the suitability of the underlying
soil to s 'pport the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2
} Phone 954-784-2941
800-848-1919
eder Fax 954-784-7875
& TESTING INC. www.fed-eng.com
250 SW 13th AvOompano Beach, FL 33069
Field Density Tests of Compacted Soils, Method D-6938
Project: I Proposed Residence Lot 61, Creekside,,- Date: October 5, 2018
Address: 8644 Cobblestone Drive, Fort Pierce, FL Order#: 18DR889
Area Test ' d: Building Pad Permit #: Jbv
Material T l� pe: Pale Brown Sand with Traces of Shell Tech: .BK
Client: D.R. Horton, Inc.
Address: 1430 Culver Drive NE Compaction Req.: 95%
Palm Bay, FL 32907 Proctor Method: ASTM D-1557
Test
##
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
Cen
er of Building Pad
12"
FL
7.9
108.2
109.6
12.0
98.7%
Yes
2
SE ! orner of Building Pad
12"
FL
8.8
108.3
109.6
12.0
98.8%
Yes
3
NW'ICorner of Building Pad
12"
FL
8.4
109.1
109.6
12.0
99.5%
Yes
4
I�
5
6
i
7
j
8
�I9
10
I
11
12
13
jl
14
Remar S: . See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification oF_Soil aring apacity.
Legend f r Elevation:
PR = Pro�froll 1,2,3 = 1st, 2nd, 3rd-Lift Submitted by- A
:.
SL = Spr'ngline FL = Final Lift Keith LeBlanc, P.2.,
SG = Su ,grade BG = Below Grade Federal,Engineering & Testing, Inc.
BC = Ba ecourse BOF = Bottom of Footing Florida Reg..,No. 59394
TOP = T �p of Pipe FG = Finished Grade Certificate,�of-/authorization #5471
As a mutu '� protection to clients, the public and ourselves, all reports are submitted as the confidential properly of clients, and authorization for publication of statements,
conclusion or extracts from or regarding our reports is reserved pending our written approval. A density test detenniries tha degree of compabtion of the tested layer of material
only. A den ity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil-materfals below tfie.proposed structure. The results
do not prec ude or guarantee that future settlement and cracking will not occur. A soil boring testis required to certify &i the underlying sci<'s will :support the proposed structure
without se ement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be psr66)ed t6 evaluate the suitability of the underlying
soil to sup ort the proposed, structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work.
PAGE 1 of 2
Compacted Soils Method 13-69381'Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test .was to determine the degree of compaction of the tested layer of
material only. In no way shall 'a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the''client prior to construction.to verify subsoil conditions. Our scope of services only included •testing the top
12" of added fill •material. FETuwas not contracted to,perform supervision of the building pad preparation. This testing of the
added fi- include an analysis of the.underlying soil materials to determine if they are capable of supporting
the proposed structure. without settlement. This density compaction test does not warranty any underlying soil materials or
conditions beloi the'tested top 121nches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation'areas of the proposed structure to verify the underlying
soil conditions. .
Environmental analysis of the- soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved -areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on,other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations,
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior
to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.