Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTJ O Y � 1 Aedera' I . 8 TESTING INC. 250 SW 131N Ave Pompano Beach, Fl. 33069 8 CANNED BY LM(U �PY Phone 954-784-2941 { y EC 800-848-1919 Fax 954-784-7875 www.fed-eng.com r„ parmittinq Field Density Tests of Compaicted-Sol[s_Method D-6938 Project; Il Proposed Residence Lot 61, C'reekside Date: October 5, 2018 Address. 8644 Cobblestone Drive, Fort Pierce, FL Order #: 18DR889 Area Tested: Building Pad Permit #: /�' y (� _ _ 6, Materiq,l Type: Pale Brown Sand with Traces of Shell Tech: BK Client: 1,1 D.R. Horton, Inc. Addre s: 1430 Culver Drive NE Compaction Req.: 11 Palm Bav, FL 32907 Proctor Method: 95% ASTM D-1557 Test # I TEST LOCATION Probe Depth Elev. . Moist oi Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 CI. enter of Building Pad 12" FL 7.9 108.2 109.6 12.0 98.7% Yes 2 SE Comer of Building Pad 12" FL 8.8 108.3 109.6 12.0 98.8% Yes 3 I W Corner of Building Pad 12" FL 8.4 109.1 109.6 12.0 99.5% Yes 4 5 I'I 6 i 7 i 8 9 10 I 11 12 13 14 3OHiV 4-6 Rem rks: See Reverse Side Page 2 of 2) for Additional Information for Disclaimer This Is a Compaction Test only on the top 12" of the pad and is not a verification of S" Bearin' ° %ap��city.; y Legen for Elevation: PR = �oofroll 1;2,3 =1st, 2nd, 3rd Lift Submitted by: 4d; : SL = S'� ringline FL = Final Lift Keith LeBlanc, P'E`.%p, SG = ubgrade BG = Below Grade Federal EnglneSnrLW'& stir, j-no.� BC = asecourse BOF = Bottom of Footing Florida Reg. No.'�59��9L TOP =�..al op of Pipe FG = Finished Grade Certificate of Authorizaiory#/-' 7;., As a m protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusi ins or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of material only. A c ensity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the proposed structure. The results do not p eclude or guarantee that future settlement and cracking will not occur. A soil boring test Is required to certify that the underlying soils will support the proposed structure without ettlement. If no soil borings have been performed to verify the underlying soils, we, recommend that soil borings be performed to evaluate the suitability of the underlying soil to s 'pport the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 } Phone 954-784-2941 800-848-1919 eder Fax 954-784-7875 & TESTING INC. www.fed-eng.com 250 SW 13th AvOompano Beach, FL 33069 Field Density Tests of Compacted Soils, Method D-6938 Project: I Proposed Residence Lot 61, Creekside,,- Date: October 5, 2018 Address: 8644 Cobblestone Drive, Fort Pierce, FL Order#: 18DR889 Area Test ' d: Building Pad Permit #: Jbv Material T l� pe: Pale Brown Sand with Traces of Shell Tech: .BK Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: 95% Palm Bay, FL 32907 Proctor Method: ASTM D-1557 Test ## TEST LOCATION Probe Depth Elev. Moist % Dry Density PCF Proctor Value PCF Optimum Moisture % Compaction Pass 1 Cen er of Building Pad 12" FL 7.9 108.2 109.6 12.0 98.7% Yes 2 SE ! orner of Building Pad 12" FL 8.8 108.3 109.6 12.0 98.8% Yes 3 NW'ICorner of Building Pad 12" FL 8.4 109.1 109.6 12.0 99.5% Yes 4 I� 5 6 i 7 j 8 �I9 10 I 11 12 13 jl 14 Remar S: . See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer This is a Compaction Test only on the top 12" of the pad and is not a verification oF_Soil aring apacity. Legend f r Elevation: PR = Pro�froll 1,2,3 = 1st, 2nd, 3rd-Lift Submitted by- A :. SL = Spr'ngline FL = Final Lift Keith LeBlanc, P.2., SG = Su ,grade BG = Below Grade Federal,Engineering & Testing, Inc. BC = Ba ecourse BOF = Bottom of Footing Florida Reg..,No. 59394 TOP = T �p of Pipe FG = Finished Grade Certificate,�of-/authorization #5471 As a mutu '� protection to clients, the public and ourselves, all reports are submitted as the confidential properly of clients, and authorization for publication of statements, conclusion or extracts from or regarding our reports is reserved pending our written approval. A density test detenniries tha degree of compabtion of the tested layer of material only. A den ity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil-materfals below tfie.proposed structure. The results do not prec ude or guarantee that future settlement and cracking will not occur. A soil boring testis required to certify &i the underlying sci<'s will :support the proposed structure without se ement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be psr66)ed t6 evaluate the suitability of the underlying soil to sup ort the proposed, structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. PAGE 1 of 2 Compacted Soils Method 13-69381'Disclaimer Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced project on the reverse side. The purpose of our test .was to determine the degree of compaction of the tested layer of material only. In no way shall 'a compaction test replace a soil bearing capacity determination. A soil boring test must be performed by the''client prior to construction.to verify subsoil conditions. Our scope of services only included •testing the top 12" of added fill •material. FETuwas not contracted to,perform supervision of the building pad preparation. This testing of the added fi- include an analysis of the.underlying soil materials to determine if they are capable of supporting the proposed structure. without settlement. This density compaction test does not warranty any underlying soil materials or conditions beloi the'tested top 121nches of material. If no soil borings have been performed in the location of the proposed structure, we recommend performing soil borings below all foundation'areas of the proposed structure to verify the underlying soil conditions. . Environmental analysis of the- soil materials is not part of the scope of services. If environmental analysis of the soils is required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted. Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of the AASHTO T-180 standard for paved -areas such as roadways and parking lots. If different specifications are required, Federal Engineering & Testing, Inc. shall be notified. Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on,other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excavations, overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested prior to construction. As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of clients and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved pending written approval. It has been a pleasure working with you and we look forward to doing so in the near future. i U Page 2 of 2