Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTBUI We, subs Date site fee be Planning & Development Services Building & Code Regulation Division 2300 Virginia Ave Fort Pierce, FL 34982 772-462-2172 Fax 772-462-6443 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT IT #: i, )7 0 S cl 7 JOB ADDRESS: )ER/CONTRACTOR: D MAO Works 9:2 o r �-j mal cT. � sL- s T �ctct(3,f qwg eN�a Iri(tn� CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC. CONTROL LICENSE #: JB175775 undersigned, hereby certify that we have pretreated the above described construction for; anean termites in accordance with the standards of the National Pest Control Association. iC feet if area treated: I J Chemicals used: DOMINION 2L age of solution: .05% Total gallons used: Treatment: �— 5_ [ S Time of Treatment: • O noting Slab 1st Treatment 1st Treatment Re -Treat Re -Treat )riveway POOls 1st Treatment ist Treatment Re -Treat Re -Treat )ther 6c,l OcAl S Peri ter for Final Inspection � ist Treatment Re -Treat J V Signature of Exterminator Date There must be a completed form for each required treatment or re -treatment and this form must be, on the job be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -Inspection 1.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board provided to receive duplicate Treatment Certificates as each required protective treatment Is comp/eted, g a copy for the person the permit is issued to and another copy for the building permit files The Treatment ate shall provide the product used, identlty of the applicator, time and date of the treatment, site location, area chemical used, percent concentration and number of gallons used, to establish a verifiable record of ve treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall 7leted prior to final building approval. ie County requires for the final inspection for CO, a Permanent Sticker to be placed on .ctrical panel box cover, listing all the treatments and dates of applications. 7/24/2014