HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTBUI
We,
subs
Date
site
fee
be
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
IT #: i, )7 0 S cl 7 JOB ADDRESS:
)ER/CONTRACTOR: D MAO Works
9:2 o r �-j mal cT. � sL- s T �ctct(3,f qwg
eN�a Iri(tn�
CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC.
CONTROL LICENSE #: JB175775
undersigned, hereby certify that we have pretreated the above described construction for;
anean termites in accordance with the standards of the National Pest Control Association.
iC
feet if area treated: I J Chemicals used: DOMINION 2L
age of solution: .05% Total gallons used:
Treatment: �— 5_ [ S Time of Treatment: • O
noting Slab
1st Treatment 1st Treatment
Re -Treat Re -Treat
)riveway POOls
1st Treatment ist Treatment
Re -Treat Re -Treat
)ther 6c,l OcAl S Peri ter for Final Inspection
� ist Treatment
Re -Treat J V
Signature of Exterminator Date
There must be a completed form for each required treatment or re -treatment and this form must be, on the job
be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -Inspection
1.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board
provided to receive duplicate Treatment Certificates as each required protective treatment Is comp/eted,
g a copy for the person the permit is issued to and another copy for the building permit files The Treatment
ate shall provide the product used, identlty of the applicator, time and date of the treatment, site location, area
chemical used, percent concentration and number of gallons used, to establish a verifiable record of
ve treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
7leted prior to final building approval.
ie County requires for the final inspection for CO, a Permanent Sticker to be placed on
.ctrical panel box cover, listing all the treatments and dates of applications.
7/24/2014