Loading...
HomeMy WebLinkAboutJOB SPECIFICATIONDREAMWORKS REMODELING L.L.C. DREAMWORKS JOB SPECIFICATIONS 07/19/18 12:14 PM 772-283-7742 JOB NAME: LUGTENBERG, HAMS & EVE Page # 1 JOB # 12242 Bid Area Description Price Phase: 1 REMODEL Bid Item: 700 PERMIT SPECS FILE Cf-%P,�� * MASTER BATH PLUMBING - REMOVAL OF BATH SINK & CAP OFF PLUMBING - CAP OFF EXISTING TUB PLUMBING PLUMBING - REMOVE EXISTING CULTERED MARBLE TUB,SKIRT & SPLASH REMOVAL OF EXISTING DECK PLATFORM REMOVE FRAMING UNDER CULTURED MARBLE TUB,STEPS AND SKIRT PLUMBING - REMOVAL OF EXISTING TOILET PLUMBING - REMOVAL OF EXISTING BIDET PLUMBING - CAP OFF EXISTING BIDET ELIMINATE & CAP OFF EXISTING TUB & WATER SUPPLY CONCRETE CUTTING CUT CONCRETE TO RELOCATE WATER AND DRAIN FOR NEW TUB AND RELOCATE TOILET CONCRETE - FILL FLOOR TO MEET ELEVATION PLUMBING - RELOCATE TOILET - ROUGH CENTER ON WALL PARALLEL TO DOOR - SEE PLAN PLUMBING - INSTALL NEW TWO PIECE TOILET INCLUDES NEW WAX RING AND CHANGING SUPPLY LINE, ESCUTCHEON AND ANGLE STOP. PLUMBING - INSTALL BATH SINK & FAUCET RECEIVED JUL 2 0 2018 4 ST. Lucie County Permittin 0 Job Specifications - Dreamworks Remodeling L.L. C. Continued JOB # 12242 Area Description PLUMBING - INSTALL RUBBER PAN AND DRAIN PLUMBING - INSTALL NEW SHOWER VALVE & ROUGH IN HEAD LOCATION RIGHT WALL - (HIS) PLUMBING - INSTALL SHOWER TRIM LOCATION RIGHT WALL - (HIS) PLUMBING - INSTALL NEW SHOWER VALVE & ROUGH IN HEAD & HANDSHOWER LOCATION LEFT WALL - (HERS) PLUMBING - INSTALL SHOWER TRIM & HANDHELD LOCATION LEFT WALL - (HERS) PLUMBING - INSTALL FREE-STANDING TUB/DRAIN SAME LOCATION PLUMBING - INSTALL FREE-STANDING TUB FILLER 07/19/18 Page # 2 Bid Price ELECTRIC LABOR INSTALL (10) LED RECESSED LIGHT TRIMS. INSTALL (1) NUTONE EXHAUST FAN. RELOCATE (1) RECEPTACLE FOR IN DRAWER RECEPTACLE. INSTALL (1) IN DRAWER RECEPTACLE. * STORAGE ROOMS IN GARAGE NON -AC SPACE REMOVE GARAGE DOOR & OPENER REMOVE GARAGE DOOR ,OPENER AND HARDWARE RELOCATE VACUUM SYSTEM RELOCATE VACUUM SYSTEM LOCATION TOO RELOCATE ATTIC ACCESS REMOVE AND RELOCATE ATTIC ACCESS. REPAIR CEILING HANG AND FINISH DRYWALL , * LOCATION TBD FRAMING - 3 5/8 WALL FRAME NEW WALLS TO CLOSE OFF FIRST BAY IN GARAGE TO CREATE ROOM, FRAME HALL WAYAND DOORWAY FOR NEW GARAGE ENTRYAND FRAME NEW CLOSET WITH BI -FOLD DOOR FOR HOT WATER HEATER FRAMING - FUR & BUCK FUR OUT BLOCK WALL ON EXTERIOR WALL TO HANG DRYWALL Job Specifications - DYeamworks Remodeling L.L. C. 07/19/18 Continued JOB # 12242 Page # 3 of 3 Bid Area Description Price INSULATION - INSTALL NEW INSULATION NEW FRAMED WALLS & EXISTING BLOCK WALL DRYWALL - HANG & FINISH HANG AND FINISH DRYWALL -112 ON INTERIOR WALLS & 518 ON WALL COMMON WITH EXISTING GARAGE DOOR - INSTALL INTERIOR DOOR & CASING IMPACT SLIDER INSTALLATION LOW E IMPACT GLASS WITH WHITE FRAME. DOOR- SGD770 SLIDING DOOR IMPACT PGT IMPACT SLIDER, COLOR WHITE, CLEAR GLASS ,LOW-E ENERGY MAX AND SCREEN ELECTRIC LABOR REMOVE GARAGE DOOR OPENER. RELOCATE CENTRAL VACUUM. INSTALL FAN JUNCTION BOX ON SWITCH' INSTALL FAN PROVIDED BY OTHERS. INSTALL (4) RECEPTACLES AS PER CODE INSIDE NEW BED ROOM. INSTALL (1) SWITCH FOR HALF SWITCHED RECEPTACLE. INSTALL (1) CONVENIENCE OUTLET ON OUTSIDE OF NEW BEDROOM WALL. REWORK EXISTING SWITCHES FOR OUTSIDE LIGHT. INSTALL CABLE OUTLET. Bid Item Total: 18,697.96 Grand Total: 18,697.95