HomeMy WebLinkAboutENERGY EFFICIENCY CODE FOR BUILDIN G CONSTRUCTIONFLORIDA ENERGY EFFICIENCY CODE F012 BUILDING CONSTRUCTIO'NlJi1��i�^d�V�6rF�P
V SECTION It • SIMPLIFIED ANNLRAL Ef`2ERGY METHOD
r--ollfil.100A-119 ADMINISTERED UY THE OU'ARTMENT OF COrvlfdUNITY AFFAIIIS
Non-f bsidonffal Buildings ALL CLIMATE ZONES
PROJECT NAME: ST. t-vcie. al'SP64tK.5;wtre.5
ZONE:
BUILDING CLASSIFICATIOId S : —
II
ADDRESS:
CITY ZIP CODE: PT• 5 j• tare-:�_ !R /3 /1
BUILDING PERMIT NO.:
BUILDER:
PERMITTING OFFICE: ST. LVC,1'0—
OWNO:
JURISDICTION NO.:
II BUILDING
INFORMATION
WALLS
ROOFlCEII_ING
FLOORS
DOORS
GLASS
TYPE iil
Concretr<'I(CBS)
Wood halm,
Metal Ira'me
Insulation R•value
U
C
__
AREA
_
x-/
TYPE
Under attic
Single Assembly
Other:
Insulation R•value
U AREA
QC��
_
TYPE
Slab -on -grade W
Raised Wood
Raised concrete
Insulation R-value
U
%�
AREA
TYPE
Wood
Metal
Insulated
Other
U
AREA
TYPE
Single, wall
Double, wall
Single, roof
Double, roof
U
AREA
C
!,
SYSTEMS INFORMATION
AIR
CONDITIONER
— ,TT —If JG S, STEr:4
HOT WATER
TYPE II
EFFICIENCY TONS
TYPE EFFICIENCY BTUIH
TYPE
llllilaly y Iteal trump
< 65,000 Btu I h
!
SEER [_
conlial Ilew Pullip �M
Electric
d
�
? 65;000 Btu Ih
._
EER
< 65,000 Dlulh HSPF
Resistance
❑
I
Wate i cooled
-'--
EER
65,000 Bluth COP
•Ded. Heal Pump
Gas
Evzpdratively cooled
EER
d COPl cooled
WaterNatural
❑
PTAC Ir
EER
Evapoialively cooled COP
LPG
❑
Chillerslq
_ COP
PTI IP _ COP
Oil
❑
Ulhcl:, I1I__�
IIriu
El '
(_
<225.0001300,000Bhalh AFUE
>_ 225.000/300.000 Rhanl El _
Other:
LIGHTING KW:
°' PRESCRIPTIVE MEASURES (flI.ust be met or exceeded by all buildings.)
I, COMPONENTS
SECTIOtJ
REQUIREMENTS
CHECK
1
Windo-ks
502.4
Maximum of 0.5 clm per linear loot of operable sash crack.
Doors I"'
S02.4
Maximum of 11.0 chn per linear fool of operable sash crack.
JointslCracks
502.4
to be caulked, g:lskulcd, wealhrrsllipprrl, or olhnrwise sealed.
!)03.3
Supply ail lcsllicled ;o sul coldlhul duck lumpurduw to umul load of worst case tune.
Wnli:lj',
VcnliLilion
I„
503.4
., I I y : � ..,.,
"u 1 )lied with rcadil our iblo switch lot 5hul-olf and/or volume leduction when vcntiI300n is not
required.
HV/;C [fficiency
503.4
Minimum ellicioncies — Healing: Tables 5.5, 5.6: Cooling: Tables 5.7. 5.8, 5.9.
Tran::p;oil Energy
503.5
Minimum of 8.0.
Balanding
503.15
Provide means for bnlancinq HVAC nir syslrrn Fx walrr distribution system.
I IVAC Controls
503./
Sepaiale readily accessible nianual of aujoinalic Illernioslal lot each system.
HVAC Duct
503.9
Constructed in accordance with industry standards 8 local mechanical codes. Ducts must be insulated
Consliuction
In minimum R = A 1115 (hr •F ft'inlu).
Piping''Insulabon
503.10
In accordance with Table 5.10.
ivall`I ICI lualel.:
504.2
r,lll:il hC:11 Aar II IAE label is llliC:II111f1 colllptl;llice wills ASI fl IAE atlatldaid JU or comply will) elfici0ncy and standby
,
lu: ; requilemenls. Switch or r-leatly malkud circuit breaker (electric) or cu1•ol1(gas) musl be provided. Heal traps
requited. Mu:;l oleo/ nlininuun wnh;r hr.;ding cquipuuna ellicidncics in Tlhlc fi•I I Bllef 111190,
/
Swinlining Pool
Rp;k:
50.1.2
Spas 8 hraled pools nu)sl h;lva co ors. Norl•COITIT110( ,11 pools must have pump timer.
Hut Y}filer
O:c: taps F: pool hralw.^, nnra Ir.rn: minimum Ihuun:d r.11iriuncy of 75 % (7t:".� aller I I1I90).
n
PipesIl
504.4
Insulation is required far recirculating systems. Piping heal loss is limited 10 17.5 Dlulhllinear loot of
Pipe; see Table 5-12.
W:dul'�li*Iwo::
W-1 :,
W;dul How nraltclud In 111.,EIItl,tttl nl :I glnn al IIn pslp; ludo/:: maximum :1.5 gallon Ilu::h. Public: lavatory
lixium maximum Itow of .:i gpin or .5 gallon it ha:: soil -closing valve.
-
Lighlibg
505.1
Ballast efficacy factors are listed in Table 5.14.
SECTION 8 COMPLIANCES
Budcjlcl (Table 8.1):
SECTION 4 COMPLIANCE
Building MurUISF•: _ zi4.3!
Conlpulel ploglanl usod:
Section 5 Budget:
Con?,ilioned sq. ft.:
I I
Section 4 Total:
Compliance with Section 8 was demonstrated
by a Prescriptive Measures
methodology or by Dual Calculation:
'807.2 Supermarkets
8 809.2 Basic Features
I807.3 Restaurants
809.3 Dual Calculation
807.4 Kitchens
-
Budget
All plans and spocilicalions shall be signed and scaled by a Florida registered engineer or
w Chilarl will, Iho uxrrpliou:; ptnA(Ir In, ' ocfian 4r11.229. F.S. and Soclion 471.003, F.S.
I hwuby cunily that Iha plans and • cilic• is covorud by this Calculation are in compliance
with the Florida Energy Coda.
SIGNATUnE:
DATE: tS
Review of the plans and specifications covered by this calculation indicates compliance with
the Florida Energy Code. Bolero construction is completed, this building will be Inspected for
compliance in accordance with Section 553.903 F.S.
BUILDING OFFICIAL:
DATE:
III '
f; 3-65
FORM 800•A•89- .
co
1
C,
ON
SECT ION. . 8 -- SIMPLIFIED ANNUAL ENERGY METHOD
AOMIHISTERED tiY THE DEPARTMENT OF COUX-1UNITY AFFAIRS
EFiERGY CONISUMING wINTER SPRING AND FALL SUMMER
ELE 'E3$7S TASLa US = AREA IJTR - IABTU U• AREA f MTR T USTU . Ue * AREA = IATR o IiBTU
WALLS
P"+I Ii00F
C
RAISED FLOOR a
' INTERIOR WALLS
GLASS SOLAR
OR.
N
F
s
D
GLASS CONDUCTION
E
OUTSIDE AIR
F
�. PEOPLE HEAT
LIGHTING HEAT
a
HYAC MOTOR HEAT
{4EI0C CORD. 80A E
M T in' DCD IN C.O.P.
Uw I
Ur = Ar zRy' Mw
Ut At = FWkd
SC
A
%SWM'
'j
I420
.7)0
IA 4-/(9
7.4,
I
Us Ac CWhl
i.13 � D 1-/10 -
+
CFM YVWb1'?'
( At x PWM-4 l
WATTS*LWI.{-
BHP f' mw d— .• I
Uw
Aw
#— Y rM'
+
Ur
Ar
iRSFfA+
oS
70%
1 q. 0
1 )3,�'
Uf
AF--,F
, O'S
5"1
-. 5
I _ tia 2
SC
As
=SSFM
-
I
.
,to
240
14•$.
314s .
+
Uc % Av 'CSFp+
io
CFM YVSFM
At :PSFM-6
-I�B �.3 2734
ATTS*LSFM-•
ISVb 3.31 505
( BHP iMC-FM= I
Uw % kw NWSM g
Ur Ar P.S;A
•off i < 51 69 1 7141,
2
Ut At = FS1A
•�6 3. r I
SC
* Aa
x SS44
14-(0 3187.2
Wo
1 I_
I
4
I
I
.1
Ua A
■ CSM
-7. 2
6
CFM T VSM
53.E
At x P S M o
S fJ
• 5", �l
YIATTS =r. Ll!S;A a
L c-1-
• BHP MSM
..
1.
IDS A
�
fv1A
V"
�{ WINTER SUBTOTAL
cnoo�•
Heat
START-UP HEAT
At
i S U H
ehoaao
I
=
Cool.
Heat-Q3,
Cool
Cool
if SUBTOTALS I or
HI
CL6
HI
C II (QI1�7)
C�249�9
x
HSMI
x
x
SMI
x
CSM �0
x
..CSm. ,Lo
BEAT/COOL SYS. FdiRI
HI" _
CI Z/(�-
H
C q(f-f
C . q 1$9
PI SEASONAL SUBTOTALS
c
v
ENERGY SUMMARY ~�
t—"
LIGHTING
RAW ENERGY
WATER HEATHLIG
HVAC
MOTOR
RAC'!
ENERGY
I DEVICE
COOLING TWR
I PUMPS
ANUS - VAY
ANUS - Cy
OTHER
I L R E
IHW OR BUHW
I
MRE
TOTAL
FABTU
=sll�
HSTU
F?IBTU
TOTAL biBTU FLOOR AREA At _ DESIGN ENERGY401 (S
HEATING 1 p
Q(( -!540 _ COOLING
see
together
m
R�--
TOTAL _MB T U
2ce��01
U ALLOWABLE ENERGY. BUDGET -Table 8•1