Loading...
HomeMy WebLinkAboutENERGY EFFICIENCY CODE FOR BUILDIN G CONSTRUCTIONFLORIDA ENERGY EFFICIENCY CODE F012 BUILDING CONSTRUCTIO'NlJi1��i�^d�V�6rF�P V SECTION It • SIMPLIFIED ANNLRAL Ef`2ERGY METHOD r--ollfil.100A-119 ADMINISTERED UY THE OU'ARTMENT OF COrvlfdUNITY AFFAIIIS Non-f bsidonffal Buildings ALL CLIMATE ZONES PROJECT NAME: ST. t-vcie. al'SP64tK.5;wtre.5 ZONE: BUILDING CLASSIFICATIOId S : — II ADDRESS: CITY ZIP CODE: PT• 5 j• tare-:�_ !R /3 /1 BUILDING PERMIT NO.: BUILDER: PERMITTING OFFICE: ST. LVC,1'0— OWNO: JURISDICTION NO.: II BUILDING INFORMATION WALLS ROOFlCEII_ING FLOORS DOORS GLASS TYPE iil Concretr<'I(CBS) Wood halm, Metal Ira'me Insulation R•value U C __ AREA _ x-/ TYPE Under attic Single Assembly Other: Insulation R•value U AREA QC�� _ TYPE Slab -on -grade W Raised Wood Raised concrete Insulation R-value U %� AREA TYPE Wood Metal Insulated Other U AREA TYPE Single, wall Double, wall Single, roof Double, roof U AREA C !, SYSTEMS INFORMATION AIR CONDITIONER — ,TT —If JG S, STEr:4 HOT WATER TYPE II EFFICIENCY TONS TYPE EFFICIENCY BTUIH TYPE llllilaly y Iteal trump < 65,000 Btu I h ! SEER [_ conlial Ilew Pullip �M Electric d � ? 65;000 Btu Ih ._ EER < 65,000 Dlulh HSPF Resistance ❑ I Wate i cooled -'-- EER 65,000 Bluth COP •Ded. Heal Pump Gas Evzpdratively cooled EER d COPl cooled WaterNatural ❑ PTAC Ir EER Evapoialively cooled COP LPG ❑ Chillerslq _ COP PTI IP _ COP Oil ❑ Ulhcl:, I1I__� IIriu El ' (_ <225.0001300,000Bhalh AFUE >_ 225.000/300.000 Rhanl El _ Other: LIGHTING KW: °' PRESCRIPTIVE MEASURES (flI.ust be met or exceeded by all buildings.) I, COMPONENTS SECTIOtJ REQUIREMENTS CHECK 1 Windo-ks 502.4 Maximum of 0.5 clm per linear loot of operable sash crack. Doors I"' S02.4 Maximum of 11.0 chn per linear fool of operable sash crack. JointslCracks 502.4 to be caulked, g:lskulcd, wealhrrsllipprrl, or olhnrwise sealed. !)03.3 Supply ail lcsllicled ;o sul coldlhul duck lumpurduw to umul load of worst case tune. Wnli:lj', VcnliLilion I„ 503.4 ., I I y : � ..,., "u 1 )lied with rcadil our iblo switch lot 5hul-olf and/or volume leduction when vcntiI300n is not required. HV/;C [fficiency 503.4 Minimum ellicioncies — Healing: Tables 5.5, 5.6: Cooling: Tables 5.7. 5.8, 5.9. Tran::p;oil Energy 503.5 Minimum of 8.0. Balanding 503.15 Provide means for bnlancinq HVAC nir syslrrn Fx walrr distribution system. I IVAC Controls 503./ Sepaiale readily accessible nianual of aujoinalic Illernioslal lot each system. HVAC Duct 503.9 Constructed in accordance with industry standards 8 local mechanical codes. Ducts must be insulated Consliuction In minimum R = A 1115 (hr •F ft'inlu). Piping''Insulabon 503.10 In accordance with Table 5.10. ivall`I ICI lualel.: 504.2 r,lll:il hC:11 Aar II IAE label is llliC:II111f1 colllptl;llice wills ASI fl IAE atlatldaid JU or comply will) elfici0ncy and standby , lu: ; requilemenls. Switch or r-leatly malkud circuit breaker (electric) or cu1•ol1(gas) musl be provided. Heal traps requited. Mu:;l oleo/ nlininuun wnh;r hr.;ding cquipuuna ellicidncics in Tlhlc fi•I I Bllef 111190, / Swinlining Pool Rp;k: 50.1.2 Spas 8 hraled pools nu)sl h;lva co ors. Norl•COITIT110( ,11 pools must have pump timer. Hut Y}filer O:c: taps F: pool hralw.^, nnra Ir.rn: minimum Ihuun:d r.11iriuncy of 75 % (7t:".� aller I I1I90). n PipesIl 504.4 Insulation is required far recirculating systems. Piping heal loss is limited 10 17.5 Dlulhllinear loot of Pipe; see Table 5-12. W:dul'�li*Iwo:: W-1 :, W;dul How nraltclud In 111.,EIItl,tttl nl :I glnn al IIn pslp; ludo/:: maximum :1.5 gallon Ilu::h. Public: lavatory lixium maximum Itow of .:i gpin or .5 gallon it ha:: soil -closing valve. - Lighlibg 505.1 Ballast efficacy factors are listed in Table 5.14. SECTION 8 COMPLIANCES Budcjlcl (Table 8.1): SECTION 4 COMPLIANCE Building MurUISF•: _ zi4.3! Conlpulel ploglanl usod: Section 5 Budget: Con?,ilioned sq. ft.: I I Section 4 Total: Compliance with Section 8 was demonstrated by a Prescriptive Measures methodology or by Dual Calculation: '807.2 Supermarkets 8 809.2 Basic Features I807.3 Restaurants 809.3 Dual Calculation 807.4 Kitchens - Budget All plans and spocilicalions shall be signed and scaled by a Florida registered engineer or w Chilarl will, Iho uxrrpliou:; ptnA(Ir In, ' ocfian 4r11.229. F.S. and Soclion 471.003, F.S. I hwuby cunily that Iha plans and • cilic• is covorud by this Calculation are in compliance with the Florida Energy Coda. SIGNATUnE: DATE: tS Review of the plans and specifications covered by this calculation indicates compliance with the Florida Energy Code. Bolero construction is completed, this building will be Inspected for compliance in accordance with Section 553.903 F.S. BUILDING OFFICIAL: DATE: III ' f; 3-65 FORM 800•A•89- . co 1 C, ON SECT ION. . 8 -- SIMPLIFIED ANNUAL ENERGY METHOD AOMIHISTERED tiY THE DEPARTMENT OF COUX-1UNITY AFFAIRS EFiERGY CONISUMING wINTER SPRING AND FALL SUMMER ELE 'E3$7S TASLa US = AREA IJTR - IABTU U• AREA f MTR T USTU . Ue * AREA = IATR o IiBTU WALLS P"+I Ii00F C RAISED FLOOR a ' INTERIOR WALLS GLASS SOLAR OR. N F s D GLASS CONDUCTION E OUTSIDE AIR F �. PEOPLE HEAT LIGHTING HEAT a HYAC MOTOR HEAT {4EI0C CORD. 80A E M T in' DCD IN C.O.P. Uw I Ur = Ar zRy' Mw Ut At = FWkd SC A %SWM' 'j I420 .7)0 IA 4-/(9 7.4, I Us Ac CWhl i.13 � D 1-/10 - + CFM YVWb1'?' ( At x PWM-4 l WATTS*LWI.{- BHP f' mw d— .• I Uw Aw #— Y rM' + Ur Ar iRSFfA+ oS 70% 1 q. 0 1 )3,�' Uf AF--,F , O'S 5"1 -. 5 I _ tia 2 SC As =SSFM - I . ,to 240 14•$. 314s . + Uc % Av 'CSFp+ io CFM YVSFM At :PSFM-6 -I�B �.3 2734 ATTS*LSFM-• ISVb 3.31 505 ( BHP iMC-FM= I Uw % kw NWSM g Ur Ar P.S;A •off i < 51 69 1 7141, 2 Ut At = FS1A •�6 3. r I SC * Aa x SS44 14-(0 3187.2 Wo 1 I_ I 4 I I .1 Ua A ■ CSM -7. 2 6 CFM T VSM 53.E At x P S M o S fJ • 5", �l YIATTS =r. Ll!S;A a L c-1- • BHP MSM .. 1. IDS A � fv1A V" �{ WINTER SUBTOTAL cnoo�• Heat START-UP HEAT At i S U H ehoaao I = Cool. Heat-Q3, Cool Cool if SUBTOTALS I or HI CL6 HI C II (QI1�7) C�249�9 x HSMI x x SMI x CSM �0 x ..CSm. ,Lo BEAT/COOL SYS. FdiRI HI" _ CI Z/(�- H C q(f-f C . q 1$9 PI SEASONAL SUBTOTALS c v ENERGY SUMMARY ~� t—" LIGHTING RAW ENERGY WATER HEATHLIG HVAC MOTOR RAC'! ENERGY I DEVICE COOLING TWR I PUMPS ANUS - VAY ANUS - Cy OTHER I L R E IHW OR BUHW I MRE TOTAL FABTU =sll� HSTU F?IBTU TOTAL biBTU FLOOR AREA At _ DESIGN ENERGY401 (S HEATING 1 p Q(( -!540 _ COOLING see together m R�-- TOTAL _MB T U 2ce��01 U ALLOWABLE ENERGY. BUDGET -Table 8•1