Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTIONFAV
FLORIDA ENER&-*WK&1Q8Y—��'6YODE FOR BUILDING CONSTRUCTION
° SECTION 8 • SIMPLIFIED ANNUAL ENERGY METHOD
FORM 800A•89 ADMINISTERED BY THE DEPARTMENT OF COMMUNITY AFFAIRS
Non- i esidentlal Buildings ALL CLIMATE ZONES
PROJ -CT NAME: 6/eA-&4A 5o ft•tsT
ZONE:
ADDRESS: 1i1Jii -'tJS 474'4'L -
BUILDING CLASSIFICATIONS : O C
CITY lP CODE:
BUILDING PERMIT NO:
BUILDER: eA-1'f e(-rVriw .
PERMITTING OFFICE: Or- Si.
OWN -R: Z3E.4J a•Pr A d�bW ss o� c, o-e.
JURISDICTION NO.:
BUILDING
INFORMATION
,11 WALLS
ROOF/CEILING
FLOORS
DOORS
GLASS
TYPE
U
AREA
TYPE
U
AREA
TYPE
U
AREA
TYPE
U
AREA
TYPE
U
AREA
Concrele'(CBS)
r
Under attic
Slab -on -grade
Wood
Single, wall
Wood fra
e
Single Assembly
Raised Wood
Metal
Double, wall
r
,
Metal frame
Other:
Raised concrete
Insulated
Single, tool '
Insulalio
111-value
Insulation R-value
Insulation R-value
Other
Double, roof
SYSTEMS INFORMATION
,l
AIR CONDITIONER
HEATING SYSTEM
HOT WATER
TYPE III
EFFICIENCY TONS
TYPE EFFICIENCY
BTUIH
TYPE
Unitary &r,
<65,OC
eat Pump
0 Btu Ih
p r
Q, SEER
Central Heal Pump STRIP tt 9A 7-
Electric
<65,000B1u/h -
HSPF
Resistance
LvJ
>_65,000
Water cooled
Btu/h
EER —
—65,000 Bluth
COP
Ded. Heat Pump
❑
Evapor
ivety cooled
EER
EER
Water cooled
COP
Gas
Natural
❑
PTAC
EER
Evaporatively cooled
COP
LPG
❑
Chillers
COP
PTHP
COP
Oil
❑
Other:
Gas/Oil (circle one)
HRU
❑
<225,0001300,000BIu/h
AFUE
Other:
LIGHTI
KW:
>_ 225,0001300,000 Bluth
EI
I!
PRESCRIPTIVE MEASURES (Must be met or exceeded by all buildings.)
COMPONENTS
SECTION
I REQUIREMENTS
CH CK
Windows
'502.4
Maximum of 0.5 cIm per linear tool of operable sash crack.
Doors
502.4
Maximum of 11.0 cbn en Ifnord tool of opnmhlo sash crack.
JointslCra'ks
502.4
To ho cautkod, gaskolod, wo"ItHorsiripprid. or olhorwise snnlnd.
Ilehuat
ll
503.3
Supply air restricted !o set cold/hot dock lemperaluie to meet load of worst case zone.
Vonlilstion'I
503.4
Supplied with readily accessible switch lot shut-oll andlor volume reduction when ventilation Is not
required,
HVAC EIII
luncy
503.4
Minimum elliclencius — Healing: Tables a-b, 5-6; Cooling: bblos 5.7. 5.8, 5.9.
Transport Energy
503.5
Minimum of 8.0.
Balancing l
j
503.6
Provide means for balancing HVAC air system 8 water distribution system.
HVAC Con(Iols
503.7
Separate readily accessible manual or automatic thermostat for each system.
HVAC Duc
Construction
II
503.9
Constructed in accordance with industry standards 8 local mechanical codes. Ducts must be insulated
to minimum R = A 1115 (hr 'F fI rlBtu).
Piping Ins u
alion
503.10
In accordance with Table 5.10.
Water Hea
ers
504.2
Must bear ASHRAE label indicating compliance with ASHRAE Standard 90 or comply with efficiency and standby
loss requirements. Switch or clearly marked circuit breaker (electric) or cutoff (gas) must be provided. Heat traps
required. Must meet minimum water heating equipment efficiencies In Table 5-11 after 111190.
Swimming
8 Spas
Hot Water
Pipes
Pools
I
504.2
504.4
Spas 8 heated pools must have covers. Non-commercial pools must have pump timer.
Gas spa 8 pool heaters must have minimum thermal efficiency of 75% (78% after 111190).
Insulation is required for recirculating systems. Piping heal loss is limited to 17.5 Btulh/linear foot of
pipe; see Table 5.12.
Water fixtures
l
504.5
Water (low restricted to maximum of 3 gpm at 80 psig; toilets maximum 3.5 gallon flush. Public lavatory
fixture maximum flow of .5 gpm or .5 gallon if has self -closing valve,
Lighting
;l
505.1
Ballast efficacy factors are listed In Table 5.14.
SECTION18 COMPLIANC
Budget (T ble 8-1):
Building Ivv,BTU /SF:
Conditione�ii sq. ft.: Ei%k
Compliance with Section 8 was d
methodology or by Dual Calculation:
807.2LrSupermarkets
807.3 IRestaurants
.807.41(itchens
SECTION 4 COMPLIANCE All plans and specifications shall beVIgnedang sealed by a Florida registered engineer or
Computer program used: architect with the exceptions prov for clion 481.229. F.& and Section 471.003. F.&
Section 5 Budget: I hereby certify That Iha plans and to
to s c vered by lhle eatculalio re In eompllonee
Section 4 Total: with the Florida Energy Code.
SIGNATURE:
istrated by a Prescriptive Measures DATE:
Review or the plans and specifications covered by this alcu ation Indicates compliance with
the Florida Energy Code. Before construction Is completed, this building will be Inspected for
809.2 Basic Features compliance In accordance with section 553.908 F.S.
809.3 Dual Calculation BUILDING OFFICIAL:
Budget DATE:
B-65
0",
FORM 800•A•89
FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
SECTION. 8 -- SIMPLIFIED ANNUAL ENERGY METHOD
ADMINISTERED ar -THE DEPARTMENT OF COMMUNITY AFFAIRS
ENERGY CONSUMING WINTER SPRING AND FALL. SUMMER.
ELEMENTS ITAINA U• f AREA ■ MTR MBTU U. AREA f MTR MBTU U• AREA MTR - MBTU
WALLS Uw
A
B ROOF Ur
C RAISED FLOOR A
INTERIOR WALLS
--FA
GLASS SOLAR
to]
EH
GLASSCONDUCTION Ua
E
OUTSIDE AIR
F
(GI
PEOPLE HEAT
■ ■ LIGHTING HEAT
Aw {WWM
Ar jRWM
Ki
( CFM iVWM+ l
At * PWM� l
II HVAC MOTOR HEAT BHP =MW1.1-
IN•ID[ C ND. A
N kcLVQ9p INC.O.P.
( Uw i Aw iWSFMT 1
(_SC f Aa JSSFM i l
fir 1 Z Q I 1L .1) 1 1 V/ 1 /
( BHP iMSFM= l
1
�J
" %
9NNAW
0���
( SC i Ao =-SSM T 1
1 �
A9 . CSM T
( CFM T VSM+ 1
( At x PSM + 1
( BHP i MSM i . 1
co
i
rn
If
K I WINTER SUBTOTAL g c5_Q
eAoos• +
Heat
L START-UP HEAT r At SUH
M SUBTOTALS QH or © H
x
N I HEAT%COOL SYS, MTR HSM
_
P SEASONAL SUBTOTALS H �-
'ENERGY SUMMARY
H C C 3. .
x x x
HSM CSM .q-o CSM
CHI D Qclm C
add
add
HEATING I gyo.,,�_ ,
<_-YS <] COOLING
LIGHTING LRE WATTS -6 MBTU toge er
RAW ENERGY 0
WATER HEATING HW OR BUHWX Ar MBTU + ,3
Q D z-/.0
HVAC DEVICE MRE X BHP MBTU
MOTOR COOLING TWR ll(/%C.o
RAW PUMPS +
ENERGY ANUS - VAV PIA
ANUS - CY
OTHER
TOTALI N il-li
R TOTAL MBTU
R TOTAL MBTU _ CSIFLOOR
AREA At = �TjDESIGN ENERGY U ALLOWABLE ENERGY BUDGET -Table 8-1
. q��e.�