Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION
FAV FLORIDA ENER&-*WK&1Q8Y—��'6YODE FOR BUILDING CONSTRUCTION ° SECTION 8 • SIMPLIFIED ANNUAL ENERGY METHOD FORM 800A•89 ADMINISTERED BY THE DEPARTMENT OF COMMUNITY AFFAIRS Non- i esidentlal Buildings ALL CLIMATE ZONES PROJ -CT NAME: 6/eA-&4A 5o ft•tsT ZONE: ADDRESS: 1i1Jii -'tJS 474'4'L - BUILDING CLASSIFICATIONS : O C CITY lP CODE: BUILDING PERMIT NO: BUILDER: eA-1'f e(-rVriw . PERMITTING OFFICE: Or- Si. OWN -R: Z3E.4J a•Pr A d�bW ss o� c, o-e. JURISDICTION NO.: BUILDING INFORMATION ,11 WALLS ROOF/CEILING FLOORS DOORS GLASS TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA TYPE U AREA Concrele'(CBS) r Under attic Slab -on -grade Wood Single, wall Wood fra e Single Assembly Raised Wood Metal Double, wall r , Metal frame Other: Raised concrete Insulated Single, tool ' Insulalio 111-value Insulation R-value Insulation R-value Other Double, roof SYSTEMS INFORMATION ,l AIR CONDITIONER HEATING SYSTEM HOT WATER TYPE III EFFICIENCY TONS TYPE EFFICIENCY BTUIH TYPE Unitary &r, <65,OC eat Pump 0 Btu Ih p r Q, SEER Central Heal Pump STRIP tt 9A 7- Electric <65,000B1u/h - HSPF Resistance LvJ >_65,000 Water cooled Btu/h EER — —65,000 Bluth COP Ded. Heat Pump ❑ Evapor ivety cooled EER EER Water cooled COP Gas Natural ❑ PTAC EER Evaporatively cooled COP LPG ❑ Chillers COP PTHP COP Oil ❑ Other: Gas/Oil (circle one) HRU ❑ <225,0001300,000BIu/h AFUE Other: LIGHTI KW: >_ 225,0001300,000 Bluth EI I! PRESCRIPTIVE MEASURES (Must be met or exceeded by all buildings.) COMPONENTS SECTION I REQUIREMENTS CH CK Windows '502.4 Maximum of 0.5 cIm per linear tool of operable sash crack. Doors 502.4 Maximum of 11.0 cbn en Ifnord tool of opnmhlo sash crack. JointslCra'ks 502.4 To ho cautkod, gaskolod, wo"ItHorsiripprid. or olhorwise snnlnd. Ilehuat ll 503.3 Supply air restricted !o set cold/hot dock lemperaluie to meet load of worst case zone. Vonlilstion'I 503.4 Supplied with readily accessible switch lot shut-oll andlor volume reduction when ventilation Is not required, HVAC EIII luncy 503.4 Minimum elliclencius — Healing: Tables a-b, 5-6; Cooling: bblos 5.7. 5.8, 5.9. Transport Energy 503.5 Minimum of 8.0. Balancing l j 503.6 Provide means for balancing HVAC air system 8 water distribution system. HVAC Con(Iols 503.7 Separate readily accessible manual or automatic thermostat for each system. HVAC Duc Construction II 503.9 Constructed in accordance with industry standards 8 local mechanical codes. Ducts must be insulated to minimum R = A 1115 (hr 'F fI rlBtu). Piping Ins u alion 503.10 In accordance with Table 5.10. Water Hea ers 504.2 Must bear ASHRAE label indicating compliance with ASHRAE Standard 90 or comply with efficiency and standby loss requirements. Switch or clearly marked circuit breaker (electric) or cutoff (gas) must be provided. Heat traps required. Must meet minimum water heating equipment efficiencies In Table 5-11 after 111190. Swimming 8 Spas Hot Water Pipes Pools I 504.2 504.4 Spas 8 heated pools must have covers. Non-commercial pools must have pump timer. Gas spa 8 pool heaters must have minimum thermal efficiency of 75% (78% after 111190). Insulation is required for recirculating systems. Piping heal loss is limited to 17.5 Btulh/linear foot of pipe; see Table 5.12. Water fixtures l 504.5 Water (low restricted to maximum of 3 gpm at 80 psig; toilets maximum 3.5 gallon flush. Public lavatory fixture maximum flow of .5 gpm or .5 gallon if has self -closing valve, Lighting ;l 505.1 Ballast efficacy factors are listed In Table 5.14. SECTION18 COMPLIANC Budget (T ble 8-1): Building Ivv,BTU /SF: Conditione�ii sq. ft.: Ei%k Compliance with Section 8 was d methodology or by Dual Calculation: 807.2LrSupermarkets 807.3 IRestaurants .807.41(itchens SECTION 4 COMPLIANCE All plans and specifications shall beVIgnedang sealed by a Florida registered engineer or Computer program used: architect with the exceptions prov for clion 481.229. F.& and Section 471.003. F.& Section 5 Budget: I hereby certify That Iha plans and to to s c vered by lhle eatculalio re In eompllonee Section 4 Total: with the Florida Energy Code. SIGNATURE: istrated by a Prescriptive Measures DATE: Review or the plans and specifications covered by this alcu ation Indicates compliance with the Florida Energy Code. Before construction Is completed, this building will be Inspected for 809.2 Basic Features compliance In accordance with section 553.908 F.S. 809.3 Dual Calculation BUILDING OFFICIAL: Budget DATE: B-65 0", FORM 800•A•89 FLORIDA ENERGY EFFICIENCY CODE FOR BUILDING CONSTRUCTION SECTION. 8 -- SIMPLIFIED ANNUAL ENERGY METHOD ADMINISTERED ar -THE DEPARTMENT OF COMMUNITY AFFAIRS ENERGY CONSUMING WINTER SPRING AND FALL. SUMMER. ELEMENTS ITAINA U• f AREA ■ MTR MBTU U. AREA f MTR MBTU U• AREA MTR - MBTU WALLS Uw A B ROOF Ur C RAISED FLOOR A INTERIOR WALLS --FA GLASS SOLAR to] EH GLASSCONDUCTION Ua E OUTSIDE AIR F (GI PEOPLE HEAT ■ ■ LIGHTING HEAT Aw {WWM Ar jRWM Ki ( CFM iVWM+ l At * PWM� l II HVAC MOTOR HEAT BHP =MW1.1- IN•ID[ C ND. A N kcLVQ9p INC.O.P. ( Uw i Aw iWSFMT 1 (_SC f Aa JSSFM i l fir 1 Z Q I 1L .1) 1 1 V/ 1 / ( BHP iMSFM= l 1 �J " % 9NNAW 0��� ( SC i Ao =-SSM T 1 1 � A9 . CSM T ( CFM T VSM+ 1 ( At x PSM + 1 ( BHP i MSM i . 1 co i rn If K I WINTER SUBTOTAL g c5_Q eAoos• + Heat L START-UP HEAT r At SUH M SUBTOTALS QH or © H x N I HEAT%COOL SYS, MTR HSM _ P SEASONAL SUBTOTALS H �- 'ENERGY SUMMARY H C C 3. . x x x HSM CSM .q-o CSM CHI D Qclm C add add HEATING I gyo.,,�_ , <_-YS <] COOLING LIGHTING LRE WATTS -6 MBTU toge er RAW ENERGY 0 WATER HEATING HW OR BUHWX Ar MBTU + ,3 Q D z-/.0 HVAC DEVICE MRE X BHP MBTU MOTOR COOLING TWR ll(/%C.o RAW PUMPS + ENERGY ANUS - VAV PIA ANUS - CY OTHER TOTALI N il-li R TOTAL MBTU R TOTAL MBTU _ CSIFLOOR AREA At = �TjDESIGN ENERGY U ALLOWABLE ENERGY BUDGET -Table 8-1 . q��e.�