Loading...
HomeMy WebLinkAboutSUB-SOIL INVESTIGATION REPORTP )VW 1 i I I I Subsoil Investigation Report Client: Contact. Address: Project. Address: Date., , prepared by: Richard &. Linda Puckett IYlack Mattos 110967 S. Ocean Drive Jensen Beach, FL 34957 1?aoposed Single Family Home 10701 South Ocean Drive, Lot 677 Jensen Beach, FL 34957 Friday, May 27, M6 iaterials Testing f Inspections I Environmental ede" r`a,,1-.,- .. TESTING INC. P h o ri e: 954 -784 -2I941 8A0-848-9�9.'19 Fax `954-784-7,875 Table of Contents, ClientInformation ------------ ---------------------- —----- —----------------------- ----- pg. I Project Information ------------------------ —----------------------------------- —----- -- pg. i General Soil Descriptions ------ ------------------ —------------- ------- --------------- pg. I Foundation Recommendations ---- -------- -------_-------- ___----- _------------ __ pg 2 SoilParameters -------- —-------------------- -------- —--- -=-=----------- =-------=:_--=- pg. 3 Excavations--------------------------------------- -------- =----=----------- ------=-------- pg. 3 Settlement------------------------------ ------------------------- =----=------- —---- --- _-- pg. 4 Grading-------------------------------- ------ —---------------- ---------------------- pg, 4 Appendices--- -------------------- —------------------ =--=----------=------------- -----=---=- pg. 5 Soil Boring Log(s) Project Location Soil Boring Location(s) Soil Classifications Sampling Procedures Limitations of Liability For Your Information i Our, findings in this report are based "on soil conditions encountered in the'test bore locations only, proposed structure ,to be built, (if available At this stage), Florida.Building Code requirements and standard: engineering practices. If'your report is preliminary (i:e, vacant land or building to be demolished) additional borings are required within a footprint of the proposed structure once the location &.layout of the pioposed-structure is known. Please read this report in its entirety and follow all recommendations. Failure 'to do so may result in'the permitting agency (Building Department, etc.) withholding the Certificate of Occupancy. This will cause delays :and additional costs. The Permitting Agency will require a final certification or•signing-off of the project priorto issuirig the'Certificate of Occupancy. .All of our recommendations need to be followed to receive .a final certification from `F E.T., including: densities,on :each:lift, demucking verification, piling inspection; etc., whichever recommendation applies to your'project. Please schedule us at. least 24 hours .in 'advance for all tests and inspections, If you, choose to use -another Engineering: Firm, you must verify' -will provide you with the proper certification in writing; as; outlined iii our teport. Our Arm. will only provide a certification letter if it. has verified all work as recommended in o&-report. I 0 MIAMFDAD Construction Material. American:Goncrete Miami Dade FloA a.Depaament, Engineering Council institute, County 6i transportation, Attmi RE: Dear A tb (75) ofs( MAY 77, 2016 A & Lindi,Piitkett "S; Ocean DhV,e. i'B6ach; FL 34057 Mack Mitios SubOil likVeifigit" Wn i Propi*dd Single'Famil' H onie 107 . OF'Soxith'bceanDrive, Lot 677 J6AOdn-BOA6h, Job nt to your request Federal. EAgih6erihgr'& T6stingjInc.Ias completed, a:su'b Tqf6renped site. The 'purpose: of our . .in vestigation gatibn was to verify, subs( ition. and',dqsign. FOPPe 954-784-1941 800-8484.919 FAX 654-784-78751 fed=enqxom Number j6-sj3-,24,5 I'jnypstigatio-O on OS/25"2"'0'1*6'.at the .conditions- relative to foundation, 1 of. two (2)FS,PTborings. were,pefforned,according to' ASTM'-D-1586. drilled rilleddo ntoadepthoftwenty-f1ve feet elow the ekigt.in4, kfotid. surface.. ($ee attached field sketch for locations). The -following in is'ageneral , description stratas fcIirihq subject site:. 1 9 lwater,table elevation, was meagu red:iminediAtely at. the completion, of each I boring and was found it an -average )f four (4),- feetbelow existing ground surface. FluctuAtioll in Water level should he, anticipated due to seasonal )ns and run off as well. -as varying- ground elevation, construction dpwatering And pumping activities in the area. ntiacto.f.must familiarize himself'with sitetconditioAs intheevent groundwate'r controls and dewatering, is needed. flooding. may result underhurricaneconditions and should be taken :int consideration. -in the design of the .,4.6,-,contractor '6haill.,rliAktsure that groundwater levels, on:aOjaceni. properties are not affected by the contractors ring activities:: SDec!AJtv groundwater ;contractors shall lie consulted for -all work bdl6w the groundwater, level:. Friday, -May 27; 2016 1,0701;.South Ocean+DdVe;. Lot 677 Jensen Beach, FL 3495.7 .Page 2 The boring log(s) attachedpresent a detailed description of the soils, encountered at each 4ocatibn. -The soil strati shown on the, boring log(s) is based on the examination, of the "recovered soil: samples and :interpretation :of the. field log(s). It indicates_ only the approximate boundaries between. soil types. The actual transitions between a soil types may'be.gradual. From a geote ,clinical 'engineering perspective, the: site is suitable for, the;. construction �of the proposed structure, :provi that the surface -sand layers are compacted in place .and proof rolled. Localized areas .of loose materials. if present, N become evident'during: site clearing, grubbing ' d,.proof rolling, and must be -removed prior to filling operations. Based on our understanding of the proposed structure and the information obtained. from our field boring log(s); recommend, the following procedures for foundation design`:: 1) Strip the :entire footings :and.building construction areas plus five (5) feet past the outer perimeter oftopsoil ground vegetation (when encountered). down to clean,granular material, Any underground structures, ut lines;. root systems and drainage `trenches;- etc. must be removed in their entirety from be the prop( construction areas. The city arborisis should be contacted, pnor,to any land clearing toverify compliance any local nodes: 2) Saturate and compact all construction areas. with.a heavy -self propelled vibraiory.roller to, a -minimum, of 9`. the ASTM, D-1557 .modified proctor method. Make :a minimum of ten (1.0) ;passes, with :the, roller in direction. 3) Care should be taken when using vibration incase of.existing structures in'the vicinity of.the construction area.. If vibration cannot be used for 'compactiom- static c6invaction may be applied. However, in this case, the: compacted layer should not exceed 6 inches :in thickness:. 4) Back -fill construction areas. to .proper elevation if needed using .a. clean granular material placed in lifts nqt to exceed twelve (12) inches in'thickness. and compacted as per item.2'.- 5) Representative samples of the on -site and proposed fill matenal•should be collected..and'tested to determine the classification and compactron.characieristics: 6) All construction fill material above ,the: water table shall `be clean 'granular soil, free of organics or other deleterious,material, and shall. contain no more than. twelve (12),percent fines passing a U.S. Standard No. 200 sieve:(U:Q751nm),,ai.id have a Unified Soil. Classification,(USCS) designation. of GP, GW' GP=GM;. GW=GM,'SP or SW. No particle -size -greater than three-(3).inchessha'lfbe used'in the top 12;_inches,of the.building pad. 7) Fill `Material 'below the water table shall be washed free draining, gravel such as FDO.T' No. 57 stone; or 'equivalent to about 12 -inches above the water table unless, dewatering is used. When dewatering is used, fill material -shall bel clean granular`soil, free of organics or. other ,deleterious `material, and shall contain no more than twelve (1-2) percent fines.pas'sing a U.S. Standard No 200 sieve (Q.0:75mm). Fridayr May27, 201E 10701 South Ocean Drive„Coi 67.7 IenQ- Beach FL 34957 �`AIGIHEEAING " I Verify all densification procedures by taking an, ,adequate number of field density tests in each layer of compacted material. Density 'tests shall "be" performed on the slab areas, footing 'areas, interior .bearing wall footings and. column Tad footings. This must be scheduled immediately after Tamp and Spray and/or Compaction, but before Reinforcing Steel Placement. If reinforcing steel'i s already:in-place, it. must be removed from -All. areas to be tested prior to performing,derisities. After the installation, of any plumbing and electrical piping; we recommend that the disturbed area be recompacted_and additional densities tests•be'performed to verify proper compaction of the disturbed areas. 0) All of the above Geotechnical work shall ­be, performed under• the supervision of Federal Engineering. & T.esting's geotechnical engineer or his representative to verify compliance with our specifications and the Florida"Building"Code. Please call us at 95.4-784-2941 for schediilmg: 1) In the event of existing structures, existing footings or proposed.drainage lines, provisions shall be made by the structural engineer and" site contractor to protect, all footings fromundermining and exposure. The. geotechnical engineer shallbenotified of these conditions to evaluate the •applicability of his recommendations. The above -foundation recommendations being achieved and verified; it "is our opinion that the. proposed structure be designed for a shallow foundation system with •a permissible soil bearing pressure not" to exceed 2500 P.S.F..Building pad certification requires satisfactory completion and verification of all the above foundation recommendations.. Slabs placed upon compacted fill may be designed using: a modulus of subgrade� reaction value of 200 pci. The. following soil p' _rameters shall be used, for retaining wall designs: • Soil unit weight moist-------------- ----- 110 pcf Soil unit weight buoyant-------------------------- ---------------- ------- ---- 60cf p---I ---- --- -'Angle of internal friction-- --------------------------------------- —_ ----- 3.0° Active Earth pressure coefficient (Ka)---------- - 033 •'Passive Earth pressure coefficient (Kp),----=-------------------------------------- ------ 3.0 Angle of wall .friction• for steel piles----------------------------------------- =------_-----. 300 • Angle of wall friction for concrete"/ brick walls------------------i-----------. 200 • Angle of wall friction: for uncoated steel ---------------------------------------------------. 150 shall not .extend within one (1') foot of the angle of repos& next to :existing footings or structures unless" Trenching shall be in compliance with the Florida Building Code, OSHA and Trench Safety. Act Shorings :shall be""designed and: inspected'by a Florida licensed professional "engineer: Provis' ons -shall be made by the" architect,,engineer of record and contractor 'to address differential settlements when tying new to existing structures. Mixing of -different foundation types shall "not be used unless. provided with expansion joints to address'differential settlement. Friday. May27, 2016 10701 South. Ocean.Driye, Lot 677 Jensen Beach;. FL 34257 Page 4 Detailed settlement 'analysis was. beyond .the scope of thin 'report. Comparing, the field test data. obtained in explorationwith our ;experience with structures similar to t$ose,p'roposed for this project,. the ;estimated magnitui these settlements -is. OS to l inch. Due to the granular nature of the subsurfacematerials, the foundation settlen should occur` as the loads.are applied and should be virtually negligible by,the end of the building shell completion. All outside ground surfaces must be sloped away;from the structure to, avoid water accumulation -and ponding. All waters shall be discharged away from, all building foundations. Verify al1'water, sewer, - I" i ing, ,sprinkler and drai .lines are. properly:functioning with no.leaks,inahe vicinity of the°foundation. Regardless of 'the, thoroughness of a geotechnical exploration, ,there is:. always the possibility 'that conditions may different from those of the test -'locations; therefore, Federal Engineering & Testirig, Inc. does not guarantee any sub condition between the bore test; holes. A, site plan showing -the location of the proposed structurewas:not;provided. at time the soil. borings were performed, Once plans and.ve. cifications have: been finalized: and drawn, Federal Engineer Testing, Inc. shall be provided. a copy of the .finalized plans .and. specifications for review. For a more,accu portrayal .of subsurface .conditions; the site contractor <should: perform test, pits. Jf different conditions are encounte Federal Engineering. & Testing_Inc., .shall be.notif ed to review'the findings and make,any recommendations as nee( In accepting this report the client understands that all data from the; soil borings is .intended for..foundation :analysis c and is: not to'be used for- excavating, backflling.`or, ,pricing estimates, The site. contractor must, familiarize .themsel with the job site conditions. Environmental analysis -of the soil materials is not part of the scope of services If `environmental analysis of the soils is required, we: can provide a proposal .for performing- an environmental analysis of the .soil materials. For Environnien, .1 due,dil gence,,a Phase Zatiftr Phase MEiivironmental Site Assessment is recommended. As a mutual. protection to clients, the public and; ourselves; all reports. are, submitted: as the =:confidential property of clients, and, authorization for publication of statements, conclusions or extracts from or regarding our, reports,s reserved pending.our'written approval. Federal Engineering, & Testing, 'Inc. appreciates the opportunity- to be of service to you ,at this _phase of your project. Please-feel.free..to contact,us if we maybe,of'further service to you: I Friday May 27, 2016 i 10701 South Ocean Vdve,,Lot 677 Jensen Peach, FL 34957 Page Appendices edotwal ii TtSTINGINC. SpTlegit'llor'irig Report Client: Richard & Linda,Puckett Project: Pko.posed'S'ingle.,Family,4ome Address: 10701 South .Ocean Drive, Iot 671 Jensen.Beadh, A 34957 Phone 954484-2i .80 48- Fax 954-784 if cal fediien.il Date of Test- May 25, 2016; Hobe N64 B4 Location,: See Attacbed.Drawing (FTY -THEDepth Soil Descriptions- iiainniet B) Blows' t'N!l 1 V- 31" Cphcrete A 2. Y -, 5! Coarse Brown Sand with Traces of Rock &Shell 6 -3 7 4 5! - 8.! Grayish OliveSand 5- 6 10 6 5 6 6 7 1,2 7 '8 M 10 1:0 9 1 .9 810, . 16 7 11 —8, A -A A 81 201 Groy"Sand A A 131 A A A, A -A 14 16. 32 16, 16 17 17 A A A. -18: A. A A A. 2, Q ., k A 21 13 1.5, 3.0 20',- 25" CoarseGray Sand with, Shell IS 1.2 2.3-, A A A 24 A A ' 25 A, A 26 27' 2.8 29 30 X �,`�t4 2, Water Level. 310' Below,tand.SukfAce Fe Atiger -Fl a' N VA 'Certificate 111 n.. 5,471 ed'e'ra 11 & TESTING INC. 'PT70(Bdrifig ROMA Richard & Unda ]Puckett- -Proposed -Single "Family Horne 1,6761 $outh, bc'ea- n D firv'e, t6q,677 -Jensen-Beach, FL 34957 Phone 95,44844041 { Y 800-848-1919 Fax 954-794r.7875r Of T4t: `1VIay.25,10.1.6 Nqi: B-2, HoM.. See,A-ttached Drawing, !Re#th.'(FT) Soil Descrip"d 'on S 11ammerblo'm off - I, 31. Concrete A. .7 2, 31' - 5,',611 Come PaleBrown Sand; wiih Traces of Rock-&.,ghel. 8 9 15 3 id 8- .10. 11 18 10 -11. 22 7 7 10 9; 8 19 8 10 9Tb 17 11 A A 12 8,! -171' Gray Sand A A A U A A. '14 A A A- 15 14 15: 1.6 15" 416, 50 1,7 A A ,IS 171 20'- Olive Sand. A A ,1,9 A A '20 ,�261 -J4�' 6oar A A. 2, 1 —A 17' 16. 34 22, .,se,Gr4Y'Sand'widi.S,hdll, 23 A A 24 241�-1251 Gray',Clay A A A 25 A. A 26 27 29 20- 30, Watef.�Leveh . 4!01!. Bdlowlznd: Surface .A =Auger Inc: S47j m H Richard & Linda Puckett SUbObi gati6h Subsoil '.. Ode Y'nop js ?tdt. tb:slq'aie) H Soil .Ball .Balling LoeAddn. MAp 13M A VkP6nipand-Bi Project-- Propo Project Address: '10701 J1611§0 FL 33069 (954) 784-29, Single Family, Hqfilo A O'cean..."Drivej to'j ach,. FL,34957 F I ENGINEERING H Soil Classifications Correlation. of Pendradon. , ReOstaitge with Relativ6,00fis"Ify Alid Consistency ZV, n s,- - - Dynanfic CofiePenetipbietei Penetrometer RejOld)i0i ..Stan'&rd Penetration Hammer NO*$ Relative,Density 0-.Io 0-4 V-61Y Loose I I �- 15 5 -10 Loose 26-45 11, = 20 'Firm 45 - 75 24 30 Veryfinn 31,50 Dens& >1-10. > 50 VeryDense Sits 8 ClaSx Dynamic Gene Penetroinetek" standard Pefietr4tion • -Penetrometer Resistance kamnier Bldw� -y 0-6 O: 2. fs vdiy $0, 7-1,5 -5 Soft 16-10 6'- 10. Firm 34 - 45 11 - 15 Stiff, 46-90 16 30', Very' iff L -1 91; -150 34 50: 1][4rd 1 . 90.0 , rs m ip Modifiers" Very. Slight Trace 0 - 2 %o Slight -Trace 2-5 % Trace 5 -,Io % Little Trace 19 -1 5, % Some 15- 30 % With >30% Silt "Clay Opoldicy, 0-5% Silty PClayey 5.r 10% 0/6 l6u Silty/'Clayey 30 - 59 % the ENGINEERING Drilling & Sampling fil, borings were installed in accordance with Standard Penetration Tests: -procedures as set forth in ASTM D-1586. >entative. samples were collected utilizing spilt -barrel ,techniques in accordance with the procedures .set forth in ration Tests and Spilt=Barrel Sampling .of Soil in ASTM D71586. The °following field tests, measurements and tory analysis. were.performed/collected during the installation of each soil boring. i ation Tests the sampling, procedures, Standard Penetration Tests were performed at five (5) foot intervals to obtain the rd penetration value (lv) of the'subsurface soil. The standard penetration value (N) is .identified as the number of of a 140 ,pound hammer falling thirty (30) inches, required to advanee'the -spilt-barrel sampler' orie (1) foot into the face soil. The sampler was lower intoahe bottom of'the;preyiously cleaned'�drill hole, and .advanced by blows.from mmen The :number- of blows :was: recorded 'for., each of the three ,(3) successive .increments of six (6) inches ition.. 'flit "N" value is, ob'Whedby.addingthe second and third incremental. numbers. Level depthswere obtained during the test. boring operations. In relatively �ervious soils, such as sandy soils, the ed. depths; are .usually` pliable groundwater -levels. Seasonal variations, tidal :conditions, temperature, land -use and rainfall conditions may nfluence the: depthsWgroundwater levels: All sples collected were: classified'm.accordance with the Unified.Soil Classification System criteria to determined uamm soil r>���aterial properties and compared with published literature of the USDA Soil Conservation Survey. Ground Surface Elevations Ground surface .elevations have not been provided for the, roposed boring locations.. Therefore, all references to depth of the arious strata. and materials encountered were from existing grade at the time of the.drilling"operatioris. I Limitations of Liability Warranty We warianf that the services performed by Federal Engineering,and Testing, ,be. (F.E.T.')' are conducted' in a manner consistent with the level of'skill and care ordinarily exercised'by members of the profession currently practicing under similar conditions. No other warranties, expressed or implied, are made. While the services of F.E.T. are an:integral and valuable part of the design and construction process, we do not warrant: guarantee; or insure the quality or completeness of services or satisfactory performance, provided by other members'of the.construction process and/or the, construction plans and specifications which we have not prepared, nor the ultimate performance of building site materials. As mutual .protection to clients, 'the public; and ourselves, all reports are-submiited as the confidential property:of clients; and, authorization for publication of statements, conclusions or extracts front or regarding our reports is -reserved: pending our written approval. Reports "are not.intended•for 3rd party.use: Substtrface'Exploration .Subsurface exploration is tionrially accomplished by test;'borings. :The soil boring log includes sampling information, description of the materials recovered, approximate depths of boundaries between soil and rdek•strata'and .groundwater data. The log represents conditions specifically at the location and_timethe boring was -made. The boundaries between different, soil strata, are indicated at specific'depths; however, these depths are in fact,approximate: and dependent upon the frequen.Oof sampling.. The transitions between soil stratum are often gradual. 'Water level readings are -made at the time the boring was performed and can change with: time; precipitation, canallevels, local well drawdown, and other factors.;Regardless. of the,thoroughness.ofa Geotechnical-exploration. there is always a possibility that conditions maybe different from those of the test locations; therefore F.E.T. does not guarantee any subsoil condition surrounding: the'bore test holes. Fora indie accurate portrayal of subsurface conditions, :the site contractor should perform tests pits. if different, conditions are encountered, F.E.T. shall be notified -to review the:findings and make any recommendations as needed. Laboratoty, and,Field.' Tests Tests are performed in •accordance with; specific..ASTIVI Standards unless otherwise, indicated. All criteria included in:a•given ASTMStandard:are not always: required and performed: Each test report. indicates the measurements and deterininatioris actually made. Ownership of Tests /Reports All test results and/or :reports prepared by F.E.T.. pursuant to this agreement and/or Addendum(s) thereto, shall remain ".the property of F.E.T. until all monies due and owing to F.E.T., under this Agreement and/or: Addendum(s) thereto, are paid in full. Analysis :and `Recorhmendations The Geotechnical report is'prepared,primar iy to aid in the designof site work and structural foundations.. Although the information in.the•report is,expected to be sufficientfor'these;purposes, it is not intended to determine the cost•of construction orto standalone as construction specifications'.. Analysis and Recommendations cone. in,acceptmg this report the;client understands that all- data from=,the soiltboring. is intended for foundation analysis only and is not o'be ,used' for excavating, babkfillmg;or pricing estimates. In accepting this report the client understands that all data from the soil boring is intended for foundation analysis only and is not to be used for excavating, backfilling or pricing estimates. The site contractor must familiarize themselves with the job site: conditions. Soil. ,boring(s) on unmarked vacant property or existing strucgze(s), to, be demolished is considered preliminary with further boring(s) to be performed after proposed building pad is staked out."Report recommendations are based -primarily`on data from test borings made at the locations shown, on jibe test,. boring reports. 'Soil variations may exist between ;borings and Imay not become evident until construction. If variations are then noted, F.E:T,must be -contacted sb1hat field conditions can be examined and recommendations revised if necessary; The Geotechnical, report states. our midetstanding as to the location; dimensions; and structural '-features" proposed of the site. Any significant changes%in the nature, design;, or""location.of thesite.improyements must- .be communicated to Fl.T. 'so ahat the Geotechnical analysis, conclusions; and.recommendations can be appropriately adjusted. Construction Observations -Construction observation. and testing.is an important element,of Geotechnical ;services The'Geotechnical Engineer's Field,Representative (Field Rep.) is the "'owner's representative" observing the work of the . contractor, performing tests, and reporting:data from such tests and.observi tious.. The Geotechnical :Engineer's Field Representative' does not direct the contractor's construction means,. methodsi.operadons,:or personnel. 'The:Field•Rep. does: not interfere with. the relationship between the; owner and tlme.contractor, and except as an observer, does not become a�substitute owner on site. The Field Rep. is only collecting data for our Engmeerlo review. The Field.- Rep. is resp risible. for hislher.safetyonly, but has no responsibility for the:safety of other, personnel .and/or the general.=public at the site. If the Field. Rep. 'does• not feel that '.the 'site'is offering:a safe environment for hiin/her, flidTield,Rep. will 9p his/her observation) testing until he/she•deems the site is safe. The Field 'ep. is, an important member of a team whose responsibility is to observe the test and work being• done and report to. the client whether•that work is being carved out in general conformance with -the plans and -specifications. i Limitations of Report Federal Engineering; & Testing, Inc. shall havenoliability; in contract, tort or otherwise, for any inaccuracy, defect, or omission in interpreting this report and shall not in any event have any liability for -lost profits orI {any other indirect, special, incidental, consequential, exemplary or punitive damages. In the ;event of future conflict:between owners and, contractors-the,'.following applies F.ET;(s), legal and/or company representation and preparation: for representation'fees will'be: billed on au hourly,rate, i.e: depositl6n; expert witness, etc. 'F.E.T. has 1no obligation, to amend its conclusions or recommendations after the date'of this report. Any alterations orIc}ianges'in ;the location: of 'the project should be brought; -to our attention at the ;earliest convenience for review and applicability of this report; ederal & TESTING INC. nano Beach. FL33069 Soil / A6gregate Tests Soil Bo'hgs Densitry f Compaction Tests: Grain 136.Analysis" Moistur i Contents Soil Cla sifications Limeroc Bearing Ratios Florida Baring Values Specific Gravity Carbon a Analysis Hydraulic Conductivity Organic 1Contents L.A. Abrasion FDOT Inspections, QG Management Earthwo� Inspections QC Con,rete Inspections QC As Silt Inspections Phone 954-784-2941 800-848-1919 Fax 954-784-78,75 Partial. List of Services Geotechnical Engineering ;Services Field Inspection Services I Asphalt Services Fill & Quality Control Inspections: D.emuckingInspections Building Inspections Pile Driving,lnspectiOhs, Pile Load Tests Steel Inspection. Threshold Inspection Bolt Inspection Weld Inspection Vibration Monitoring Geotechnical, Engineering Foundation Engineering Foundation Design & Recommendation Subsoil Investigation Pile Load Calculations Piling Installation'Monitoring Backscatter Density Tests Extractions &. Gradations Marshall Limits Bulk Specific Gravity. Cores for Thickness Determination As Pavement Monitoring Asphalt Assessment Concrete Tests Concrete Strength Testing, Slump Tests. Windsor Probe Testing Schmidt Hammer Testing Core Testing - Air Content Concrete. Unit Weight Flexual'Strength Testing Phase I Re Assessments Phase 11 Site Assessments Lead Base Paint Surveys Site InspI ctions Phase I Follow up on Contaminated Sites Report and Analysis Research of Property Records Installation of Monitoring Wells Air Monitoring Soil Borings Soil and Ground Water Analysis TAS 105 Meld Fastener Withdrawal Test TAS 1.06 �i lle Uplift Test. TAS 124 ell Chamber / Bonded'Pull Test TAS 126 oisture Survey Windload 4cuiation: Drainage Calculations Lightweig t Concrete placement Inspection Roof Assessment / Evaluation Cap Sheet In Fastener pacing Inspection Tile/Shingle/ Standing.Seam Inspection Base She" t Installation Inspection Insurance IMitigation Retrofit M igationl Certification Roof Drainage Calculations ]�— — MIAM417ADE r uction Material Ame 6n Concrete Miami Dade Florida Department aering Council Institute County of Transportation