Subsoil Investigation Report
prepared by:
ti
vora
ENGINEERING
TESTING INC 6fvw.fe
Client: Mel-Ry Construction, Inc.
Contact; Mack Mattos
Address: 10967 S. Ocean Drive
Jensen Beach,, FL 34957
Project. Proposed Single Family Home
Address: 10701 S.. Ocean Drive, Lot 740
Jensen Beach, FL 34957
Date. Monday, October 05, 2015
6hnical Materials Testing I Inspections I Environinental
•
of
Phone 954-78a 2941
ederal800-846-1919
4& TESTING INC. Fax 954-7841-7875
13th Ave Pompano Beach, FL 33069 fed-eng.Com
Table of Contents
Client Information -- ---------- —---- --------------------------------------pg. l
Project Information ---------- ---- ----------------------------------_-------- pg. 1
General Soil Descriptions — ----_�_____�-. pg 1
Foundation Recommendations------------------------------------________pg 2
Excavations----------------------------------------------=----------- --_---------pg. 3
Grading-----------------------------------------------------pg. 3
Appendices 7 pg.5
Soil Boring Log(s)
Laboratory Test(s)
Project Location
Soil Boring Location(s)
Soil Classifications
Sampling Procedures
Limitations of Liability
For Your Information
findings in this report are based on soil conditions encountered in the test bore locations only, proposed structure to
Wit, (if available at this stage), Florida Building Code requirements and standard engineering practices. If your
rt is preliminary (i.e. vacant land or building to be demolished) additional borings are required within the foot print
e proposed structure once the location & layout of the proposed structure is known.
Pl 'lase read this report in its entirety and follow all recommendations. Failure to do so may result in the permitting
ag'ncy (Building Department, etc.) withholding the Certificate of Occupancy. This will cause delays and additional
co 4s. The Permitting Agency will require a final certification or signing off of the project prior to issuing the Certificate
of Dccupancy. All of our recommendations need to be followed to receive a final certification from F.E.T., including
der `s ities on each lift, demucking verification, piling inspection, etc., whichever recommendation applies to your
pr ect.
I
Pie' se schedule us at least 24 hours in advance for all tests and inspections. If you choose to use another Engineering
F' , you must verify they will provide you with the proper certification in writing, as outlined in our report. Our firm
Will'
only provide a certification letter if it has verified all work as recommended in our report. j
f.
uction Material
American Concrete
aering Council
Institute
Mt DADS
Miami Dade
Florida Department,
County
of Transportation
1
IWIr & TESTING INC.
250 SW 13th Ave Pompano Beach, FL 33069
October 05, 2015
Ry Construction, Inc.
7 S. Ocean Drive
n Beach, FL 34957
Mack Mattos
Subsoil Investigation
Proposed Single Family Home
10701 S. Ocean Drive, Lot 740
Jensen Beach, FL 34957
Sirs:
I
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
fed-enti.com
Job Order Number 15-SB-336
at to your request, Federal Engineering & Testing, Inc. has completed a subsoil investigation on 10/01/2015 at the
referenced site. The purpose of our investigation was to verify subsoil conditions relative to foundation
ition and design.
A t ltal of two (2) SPT borings were performed according to ASTM D-1586 drilled down to a depth of thirty feet (30)
and ��ifteen feet (15) below the existing ground surface. (See attached field sketch for locations)_ The following is a
gen Ilrral description of soil stratas for the subject site:
Depth
From To
Description of Soils
0"
6"
Topsoil & Vegetation
6"
3'
Light Brown Sand with Some Shell
3'
5'
Dark Brown Sand with Organics
5'
8'
Muck (31.9% Organics)
8'
14'
Gray Sand with Traces of Shell
14'
30'
Coarse Gray Sand with Shell
Grou dwater table elevation was measured immediately at the completion of each boring and was found at an average
dept ' of four (4) feet below existing ground surface. Fluctuation in water level should be anticipated due to seasonal
varia 'ons and run off as well as varying ground elevation, construction dewatering and pumping activities in the area.
Site ontractor must familiarize himself with site conditions in the event groundwater controls and dewatering is needed.
Surfa�� a flooding may result under hurricane conditions and should be taken into consideration in the design of the
proje fit. The contractor shall make sure that groundwater levels on adjacent properties are not affected by the contractors
dewa a ring activities. Specialty groundwater contractors shall be consulted for all work below the groundwater level.
lay. October 05, 2015
1 S. Occan Drive, Lot 740 L 4
n Beach, FL 34957
2
boring log(s) attached present a detailed description of the soils encountered at each location. The soil stratification
in on the boring log(s) is based on the examination of the recovered soil samples and interpretation of the driller's
log. It indicates only -the approximate boundaries between soil types. The actual transitions between adjacent soil
may be gradual.
ed on our understanding of the proposed structure and the information obtained from our field boring logs; it is
lent that deep foundation systems are needed to support the proposed new structure without detrimental settlement to
structure.
the Florida Building. Code FBC 2010, Table 1824; deep foundation systems shall consist of one of the following
Approximate Depth
PP eP
Allowable
Allowable Tension
Allowable Lateral
j Alternatives
Driven
Size
Compression Pile
Pile Capacity in
�I
Capacity in Tons
Tons
Capacity In Tons
!I Pin Piles
25' or Refusal
4 Inch
5 Tons
1 Ton
N/A
Piles
25' or Refusal
3 Inch
12 Tons
6 Tons
N/A
jHj'�Jelical
er Cast Piles
25' BELS
12 Inch
25 Tons
12 Tons
1 Ton
er Cast Piles
25' BELS
14 Inch
35 Tons
17 Tons
2 Tons
*BELS - Below Existing Land Surface*
i Lateral Load for a Pile Top Deflection of % inch. Proposed pile length based on the existing ground
s at the time of drilling. Pile length may vary depending on proposed gradebeam elevations and inconsistent
les. In the case of pin, helical and precast piles a minimum of four (4) test piles shall be driven to determine
,n pile length. All work shall be in accordance with the local Building Code and Coastal Zone Construction
tents (if required).
Hel'pal pile bearing capacity is dependent on helix numbers, size and spacing. The foundation contractor will be able to
pro'0i de the most cost effective combination of helix designs. The above depths are the minimum depths required to
ache ve design capacities. Predrilling might be required to achieve design depths.
I
All labs for the subject structure shall be designed as structural slabs spanning between supports and designed by a
Flo da Registered Structural Engineer and placed under the supervision of a Geotechnieal Engineer. All work shall be
con ucted by an experienced Florida Licensed Specialty Piling Contractor. All piles shall be designed by a professional
engi eer and shall be placed under the supervision of our Geotechnical Engineer to verify compliance with bur
reco endations. If the pile is not reinforced over the entire length, we recommend a single #7 reinforcingsteel bar be
plac the full Iength of the pile to verify pile continuity.
Inc 'ge of existing structures in the vicinity of the pile driving operation, care shall be taken not to create excessive
vibra pion. Vibration Ievels shall be monitored to verify compliance with county regulations. Steps must be taken to
preve,nt excessive vibrations. In the event excessive vibrations are experienced during construction, alternative driving
meth ds shall be implemented (i.e.: predrilling, jetting, hydraulic push, etc...).
Jay, October 05, 2015
1 S. Ocean Drive, Lot 740
n Beach. FL 34957
3
ENGINEEIit11G
minimum center to center spacing of piles or adjacent foundations shall be not less than twice the average diameter
round piles or 1-3/4 times the diagonal dimensions of rectangular piles, but in no case less than 30 inches. The
illation of adjacent piles (located within 4 feet of each other) on the same working day is not recommended. We
immend that adjacent piles not be installed until the initial grouted pile has set overnight.
grout used in the pile installation shall develop a minimum compressive strength of 4000 PSI at 28 days.
underground structures such as grease traps, septic systems, etc. must be supported on pile foundations, unless the
erious material (i.e.: silt, muck, peat, etc...) is excavated in its entirety and replaced with compacted washed gravel
as pea rock or #57 stone below the water table elevations and clean granular materials above the water table.
shall not extend within one (1) foot of the angle of repose next to existing footings or structures unless
Trenching shall be in compliance with the Florida Building Code, OSHA and Trench Safety Act
Shorings shall be designed and inspected by a Florida licensed professional engineer.
isions shall be made by the architect, engineer of record and contractor to address differential settlements when
in new to existing structures. Mixing of different foundation types shall , not be used unless provided with
nsion joints to address differential settlement.
utside ground surfaces must be sloped away from the structure to avoid water accumulation and ponding. All rain
-s shall be discharged away from all building foundations. Verify all water, sewer, plumbing, sprinkler and drainage
are properly functioning with no Ieaks in the vicinity of the foundation.
Re ardless of the thoroughness of a geotechnical exploration, there is always the possibility that conditions may be
di 'rent from those of the test locations; therefore, Federal Engineering & Testing, Inc, does not guarantee any subsoil
con P ition between the bore test holes. A site plan showing the location of the proposed structure was not provided at the
tim the soil borings were performed. For a more accurate portrayal of subsurface conditions, the site contractor should
per orm test pits. If different conditions are encountered, Federal Engineering & Testing Inc., shall be noted to review
the rndings and make any recommendations as needed. In accepting this report the client understands that all data from
the '� oil borings is intended for foundation analysis only and is not to be used for excavating, backfilling or pricing
esti ates. The site contractor must familiarize themselves with the job site conditions.
En onmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
requ ed, we can provide a proposal for performing an environmental analysis of the soil materials. For Environmental
due iligence, a Phase I and/or Phase II Environmental Site Assessment is recommended.
As a mutual protection to clients, the public .and ourselves, all reports are submitted as the confidential property of
clien s, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved
pen4pn our written approval.
y. October 05, 2015
S. Ocean Drive, Lot 740
Beach, FL 34957
t=NGINEERING
I Engineering & Testing, Inc. appreciates the opportunity to be of service to you at this phase of your project.
feel free to contact us if we may be of further service to you.
it IIII!Iz
\ N
f
Inc,
neering'�& Test
g,,No?T-9': : �ti�:
& ONAt.1��1��`
II
ederal
& TESTING IPIC.
A�
25 '',SW 131h Ave Pompano Beach, FL 33069
SPT Test Boring Report
Mel-Ry Construction, Inc.
Proposed Single Family Home
10701 S. Ocean Drive, Lot 740
Jensen Beach, FL 34957
Phone 954-784 2941
800-848-191:9
Fax 954-784-7875
fed-en-mcom
Date of Test: October 1, 2015
Hole No.: B-1
Location: See Attached Drawing
Depth (FT)
Soil Descriptions
Hammer Blows
"N"
1
0" - 6" Topsoil & Vegetation
3 5
2
6" - 3' Light Brown Sand with Some Shell
3'- 5' Dark Brown Sand with Organics
2 3
7
3
1 2
4
4
2 0
5
1 2
6
5' - 8' Muck (31.9% Organics)
0 1
2
7
0 1
8
1 2
2
9
2 4
10
8'- 14' Gray Sand with Traces of Shell'
5 6
9
11
A A
12
A A
A
13.
A A
14
A A
A
15
11 9
16
10 11
19
17
A A
18
A A
A
19
A A
20
A A
A
21
14 I3
22
14'- 30' Coarse Gray Sand with Shell
14 15
27
23
A A
24
A A
A
25
A A
26
A A
A
27
10 15
28
10 12
25
29
`kk
A
30
`' .���$���0
je
r
Water Level: 417" Below Land Surface Ka lanaS14}FE OF
�It
A = Auger Florit ` LAWZii §'ATE-5539 ``����®
Certificat 5471
V
i
I
4&ederal
TESTING INC.
250'SW 13th Ave Pom ano Beach, FL 33069
SPT Test Boring Report
Mel-RyConstruction, Inc.
Proposed Single Family Home
10701 S. Ocean Drive, Lot 740
Jensen Beach, FL 34957
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
fed-eff9CR coo
Date of Test: October I, 2015
Hole No.: B-2
Location: See Attached Drawing
Depth (FT)
Soil Descriptions
Hammer Blows
"N"
1
0" - 6"
Topsoil & Vegetation
3 2
2
6" - 5'6"
Dark Brown Sand with Roots & Organics
3 2
5
3
2 1
4
5'6" - 6'6"
Muck (34.4 o Organics)
T 1
2
5
0 0
6
1 0
1
7
I 1
8
2 3
3
9
7 4
10
6'6" -15'
Gray Sand with Traces of Shell
5 5
9
11
A A
12
A A
A
13
A A
14
A A
A
15
13 II
16
17
18
19
20
21
22
23
24
25
26
,
27
t�lilQ/j//
28
��`�
SOH
29
30
At
Water Level: 4'6"
Below Land Surface
t
`nesting, Inc.
A = Auger
Certificate of Authorization # 5471
250 $W 13th Ave
TESTING INC.
no Beach, FL33069
Report of Organic Content ASTM-D 2974
Friday, October 02, 2015
y Construction, Inc.
S. Ocean Drive
Beach, FL 34957
Mack Matzos
Proposed Geotechnical Services
Proposed Single Family Home
10701 S. Ocean Drive, Lot 740
Jensen Beach, FL 34957
Phone 954 784-2941
800-848-1919
Fax 954-784-7875
fete-en-mcom
Job Order Number 15-SB-336
Results of Test
Sampled by: Si Reported To: Client
Sample Location: See Location on. Subsoil Drawing
Material Description: Muck
Sample Location and Depth . -
Organic Content Percentage
B 1
5' - &'
31.9%
B2
516" - 616"
34.4%
B3
N/A
N/A
B4
N/A
N/A
B5
N/A
N/A
r
Tested By: Si
Checked By: KL
Respect il itbnl
Dek;r,j`�;P
ked, 0,,
e.
�(93a ; Y
Keith LEES PEE "F of �t' �W, ,r
Federal Elt lhK� ng,.ib .4
Florida Regtstj�53(;��.`.
�p �,
Certificate of Auttid'Agwgt5"A
®r"", t
6
MIAMFnt4Dl:
yy
struclion Material
ineering Council
American Concrete
Institute
Miami Dade
County
Florida Department
of Transportation
� •. s T.' ._ • •' .._ t - �.dV�N,���JZ�y1OFs4�' � 3„ t •� .... .Y -+�.. -..
Pal d
XEV
2, r*�`;��+ SigtUY1
Mx
++4A
J+ � �. �.h�ti1,�''7,.�''�x`a' rrr..rra;:.._ xw7:T.,�i.,,1!•. � �`
.. .r• - __ ". ";Y�-:-?� F Y �rYf` �. �l iTil 11 '- _,: � • .�•.. j .,, .^
' �;��"i411�w�� $tl'1���'�.� ►S:ifi:�3r!'J�3`�''K�.�,:�.' '� c�.� :!''� 4�
IRrr.w,f.�—
,�
iif
ram« .�s,." •� 't +.�, `"� �,�',�.
•
,^
r - r 1w !k
r
-
Soil Boring Location Map
Iederal Engineering & 'Vesting Inc. 250 SW 13th AVE Pompano Beach, FL 33069 (954) 784-2941
lient: Mel-Ry Construction, Inc. Project: Proposed Single Family Home
Test: Subsoil Investigation Project Address: 10701 S. Ocean Drive, Lot 740
(site map is not to scale) I Jensen'Beach, FL 34957
Soil Boring Location Map
Iederal Engineering & 'Vesting Inc. 250 SW 13th AVE Pompano Beach, FL 33069 (954) 784-2941
lient: Mel-Ry Construction, Inc. Project: Proposed Single Family Home
Test: Subsoil Investigation Project Address: 10701 S. Ocean Drive, Lot 740
(site map is not to scale) I Jensen'Beach, FL 34957
Soil Classifications
Correlation of Penetration Resistance with Relative Density and Consistency
Sands
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hamner Blows
Relative Density
0 - 10
0-4
Very Loose
11 - 25
5 -10
Loose
26 - 45
11 - 20
Firm
45 - 75
21 - 30
Very Firm
76 -120
31 - 50
L Dense
> 120
> 50
Very Dense
Silts& Clay
Dynamic Cone Penetrometer
Penetrometer Resistance
Standard Penetration
Hammer Blows
Relative Density
0-6
0-2
Very Soft
7-15
3-5
Soft
16 - 30
6 - 10
Firm
31 - 45
1 l -1.5
Stiff
46 - 90
16 - 30
Very Stiff
91 -150
31 - 50
Hard
Rock Hardness Description,
Soft
Rock core crumbles when handled
Medium
Can break -core -Adth your hands
Moderately Hard
Thin edges of rock core can be broken with fingers
Hard
Thin edges of rock core cannot be broken with fingers
Very Hard
Rock core rings when struck with a hammer
Sand Quantity Modifiers .
Very Slight Trace
0 - 2 %
Slight Trace
.2 - 5 %
Trace
5 - I0 %
Little Trace
10 -15 %
Some
15 - 30 %
With
> 30
Silt - Clay Quantity Modifiers
Slightly Silty /Clayey
0 - 5 %
Silty / Clayey
5 - 30 %
Very Silty / Clayey
30 - 50 %
Particle Size
Boulder
> 12 in
Cobble
3 - 12 in
Gravel
4.76 nun - 3 in
Sand
0.074 mm - 4.76 mm
Silt
0.005 mm - 0.074 mm
Clay
< 0.005 min
EttG�NEEitIHG
EHGINEERI�G
Drilling & Sampling Procedures
soil borings were installed in accordance with Standard Penetration Tests procedures as set forth in ASTM D-1586.
.-esentative samples were collected utilizing spilt -barrel techniques in accordance with the procedures set forth in
etration Tests and Spilt -Barrel Sampling of Soil in ASTM D-1586. The following field tests, measurements and
ratory analysis were performed/collected during the installation of each soil boring.
Du, g the sampling procedures, Standard Penetration Tests were performed at five (5) foot intervals to obtain the
s dard penetration value (N) of the subsurface soil. The standard penetration value (N) is identified as the number of
blows of a 140 pound hammer falling thirty (30) inches, required to advance the spilt -barrel sampler one (1) foot into the
sub�� urface soil. The sampler was lower into the bottom of the previously cleaned drill hole and advanced by blows from
the (hammer. The number of blows was recorded for each of the three (3) successive increments of six (6) inches
pen, i tration. The °N" value is obtained by adding the second and third incremental numbers.
Wa''er Level depths were obtained during the test boring operations. In relatively pervious soils, such as sandy soils, the
indi ated depths are usually reliable groundwater levels. Seasonal variations, tidal conditions, temperature, Iand-use and
rec '� t rainfall conditions may influence the depths to groundwater levels.
All$amples collected were classified in accordance with the Unified Soil Classification System criteria to determined
soil i terial properties and compared with published literature of the USDA Soil Conservation Survey.
Grod surface elevations have not been provided for the proposed boring locations. Therefore, all references to depth
of th various strata and materials encountered were from existing grade at the time of the drilling operations.
We we
Inc. (F
care of
under
made.
design
quality
* other n
building
ourselves,
regarding
not intend
ENGINEER-iHG'
Limitations of Liability
[VarralIty
it that the services performed by Federal Engineering and Testing,
7.) are conducted in a marmer consistent with the level, of skits and
arily exercised by members of the profession currently practicing
ilar conditions. No other warranties, expressed or implied, are
ile the services of F.E.T. are an integral and valuable part of the
I construction process, we do not warrant; guarantee, or insure the
completeness of services or satisfactory performance provided by
hers of the construction process and/or the construction plans and
ms which we have not prepared', nor the ultimate performance of
ite materials. As mutual protection to clients, the public and
1611 reports are submitted as the confidential property of clients, and
on for publication of statements, conclusions or extracts from or
our reports is reserved pending our written approval. Reports are
dfor 3rd party use.
Subsurface Exploration
Subsurfac I exploration is normally accomplished by test borings. The soil
boring to includes sampling information, description of the materials
recovered, pproximate depths of boundaries between soil and rock strata and
groundwat data. The log represents conditions specifically at the location
and time d e boring was made. The boundaries between different soil strata
are indicat d at specific depths; however, these depths are in fact approximate
and depen ent upon the frequency of sampling. The transitions between soil
stratum ar often gradual. Water level readings are made at the time the
boring was,Performed and can change with time, precipitation, canal levels,
local well rawdown, and other factors. Regardless of the thoroughness of a
Geotechnic 'I1 exploration there is always a possibility that conditions may be
different fr in those of the test locations; therefore F.E.T. does not guarantee
any subsoil Icondition surrounding the bore test holes. For a more accurate
portrayal o iI subsurface conditions, the site contractor should perform tests
pits. If di ff rent conditions are encountered, F.E.T. shall be notified to review
the findings and make any recommendations as needed -
Laboratory and Field Tests
Tests are p rformed in accordance with specific ASTM Standards unless
otherwise in icated. All criteria included in a given ASTM Standard are not
always requi d and performed. Each test report indicates the measurements
and determin ltions actually made.
Ownership ofTests /Reports
All test resul"s and/or reports prepared by F.E.T. pursuant to this agreement
and/or Addei�dum(s) thereto, shalt remain the property of F.E.T. until all
monies due T d owing to F.E.T. under this Agreement and/or Addendum(s)
thereto; are p''id in full.
Analysis and Recommendations
The Geotechn cal report is prepared primarily to aid in the design of site work
and structural foundations. Although the information in the report is expected
to be sufficie11,11
for these purposes, it is not intended to determine the cost of
construction to stand alone as construction specifications.
Analysis and Recommendations cont.
In accepting this report the client understands that all data from the soil boring
is intended for foundation analysis only and is not to be used for excavating,
backfilling or pricing estimates. In accepting this report the client understands
that all data from the soil boring is intended for foundation analysis only and
is not to be used for excavating, backfilling or pricing estimates. The site
contractor must familiarize themselves with the job. site conditions. Soil
boring(s) on unmarked vacant property or existing structure(s) to be
demolished is considered preliminary with further boring(s) to be performed
after proposed building pad is staked out. Report recommendations are based
primarily on data from test borings made at the Iocations shown on the test
boring reports. Soil variations may exist between borings and may not
become evident until construction. If variations are then noted, F.E.T. must
be contacted so that field conditions can be examined and recommendations
revised if necessary. The Geotechnical report states our understanding as to
the Iocation, dimensions, and structural features proposed of the site. Any
significant changes in the nature, design, or location of the site improvements
must be communicated to F.E.T. so that the Geotechnical analysis,
conclusions, and recommendations can be appropriately adjusted
Construction Observations
Construction observation and testing is an important element of Geotechnical
services. The Geotechnical Engineer's Field Representative (Field Rep.) is the
"owner's representative" observing the work of the contractor, performing
tests, and reporting data from such tests and observations. The Geotechnical
Engineer's Field Representative does not direct the contractor's construction
means, methods, operations, or personnel. The Field Rep. does not interfere
with the relationship between the owner and the contractor, and except as an
observer, does not become a substitute owner on site. The Field Rep. is only
collecting data for our Engineer to review. The Field Rep. is responsible for
Ids/her safety only, but has no responsibility -for the safetyof other personnel
and/or the general public at the. site. If the Field Rep. does not feel that the
site is offering a safe environment for him/her, the Field Rep, will stop his/her
observation/ testing until he/she deems the site is safe. The Field Rep. is an
importantmember of a team whose responsibility is to observe the test and
work being done and report to the client whether that work is being carried
out in general conformance with the plans and specifications.
Limitations ofReport j
Federal Engineering &'Testing, Inc. shall have no liability, in contract; tort or
otherwise, for any inaccuracy, defect, or omission in interpreting this report
and shall not in any event have any liability far lost profits or any other
indirect, special, incidental, consequential, exemplary or punitive damages. In
the event of future conflict between owners and contractors the following
applies: F.E.T.(s) legal and/or company representation and preparation for
representation fees'will be billed on an hourly rate, i.e. deposition, expert
witness, etc. F.E.T. has no obligation to amend its conclusions or
recommendations after the date of this report. Any alterations or changes in
the location of the project should be brought to our attention at the earliest
convenience for review and applicability of this report.
Y
& TESTING INC.
ipano Beach, FL 33069
Soil /' ggregate Tests
Soil B T nngs
Densit' Compaction Tests
Grain l ize Analysis
Moistu a Contents
Soil CI ssifications
Limero'ok Bearing Ratios
Florida !Bearing Values
Specifi " Gravity
Carbon to Analysis
Hydrau is Conductivity
Organi 'I Contents
L.A. Ab,asion
FDOT
QC Mt
Earthwdrik Inspections
QC Conbrete Inspections
QC Asphalt Inspections
Partial List of Services
Geotechnical Engineering Services
Field Inspection Services
Fill & Quality Control inspections
Demucking Inspections
Building Inspections
Pile Driving Inspections
Pile Load. Tests
Steel Inspection
Threshold Inspection
Bolt Inspection
Weld Inspection
Vibration Monitoring
Geotechnical Engineering
Foundation Engineering
Foundation Design & Recommendation
Subsoil Investigation
Pile Load Calculations
Piling, Installation Monitoring
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
fed-enu.com
Asphalt Services
Backscatter Density Tests
Extractions & Gradations
Marshall Limits
Bulk Specific Gravity
Cores for Thickness Determination
Asphalt Pavement Monitoring
Asphalt Assessment
Concrete Tests
Concrete Strength Testing
Slump Tests
Windsor Probe Testing
Schmidt Hammer Testing
Core Testing
Air Content
Concrete Unit Weight
Flexual Strength Testing
Environmental Engineering Services
Phase I Site Assessments Phase 11 Site Assessments Lead Base Paint Surveys
Site Insp' ctions Phase I Follow up on Contaminated Sites Report and Analysis
Researc of Property Records Installation of Monitoring Wells Air Monitoring
Soil Borings
Soil and Ground Water Analysis
Roof Testing & Inspection Services
TAS 105 ,field Fastener Withdrawal Test
TAS 106 Tile Uplift Test
TAS 124 Bell Chamber / Bonded Pull Test
TAS 126 oisture Survey
Windload alculation
Drainage alculations
Lightweigh Concrete placement Inspection
Roof Asse sment / Evaluation
Cap Sheet inspection
Fastener S'l acing Inspection
Tile/ Shingl / Standing Seam Inspection
Base Shee'tnstallation. inspection
Insurance itigation
Retrofit Miti ° ation/ Certification
Roof Drainage Calculations
Material
Council
(OD
American Concrete
Institute
MIMIOADB
OM
Miami Dade
County
1•v
Florida Department
of Transportation
Phone 954-784-2941
Aederal pe v t 6 a 3- 800-848-1919
Q J qax 954-784-7875
S TESTING 250 5W 13th Ave Pompano Beach, FL 33069 www.fed-eng.com
III
CLIENT
CLIE
PROJ
PROJ
CONTRACTOR:
Field Inspection Report
NAME: Mel-Ry Construction, Inc. DATE: 03/29/16
T ADDRESS: 10967 S. Ocean Drive, ORDER NO.: 16-1030
Jensen Beach, FL 34957 PERMIT N_O_.;_ '� - 5
CT NAME: Proposed Single Family Home
I ADDRESS: 10701 S. Ocean Drive, Lot 740 ARRIVAL TIME: 9:30 AM
i Jensen Beach, FL 34957 DEPARTURE TIME: 4.15 PM
TOTAL TIME ON SITE: 6.75 Hours
TRAVEL TIME: 3.75 Hours
DAY:
WEAT
HUMI
TEMPERATURE
DAILY CONDITIONS
I Mon Tue X Wed Thu Fri Sat Sun
ER: Sunny Clear Cloudy X Rain
:ITY: Low Med High X WIND: Low X Med High
Freezing Cold Mild Warm X Hot
I'
AREAS INSPECTED
Location Description of Area Inspected
Type of Work Performed by Contractor
it
Pad
Demuckin / Backfillin
I�
Notes:
DAILY CONSTRUCTION ACTIVITIES
�I,Contractor began excavating at west end of pad. Due to the area constraints contractor will excavate a quarter of the pad and
backfill
tor each four 4 areas. The west quarter of the pad was completely demucked and subsequently backfilled with crushed
concret
'. up to the water table. Once out of the water table, clean fill was used in 12 inch lifts. The contractor then moved to the next
quarter
which was the east half of the west end of the pad. Contractor removed all muck. Placed crushed concrete and compacted
IYYV G III W.
I
I
Did you fill out any field data reports? Yes X No (If Yes, please attach to this report)
Was all II ork performed to job specifications? Yes X No If No, please explain:
i
I
Who was notified about any deficiencies?
Were the deficiencies corrected by the contractor? Yes No At what Time?
How wer i the deficiencies corrected?
Misc.
Inspected by: DAS
Respectfully Submitted'By:
zl�� - Zly,
Keith LeBlanc, -N.E.
FEDERAL ENGINEERING-& TESTING, INC.
Florida Reg. No.: 59394
Aederal
& TESTING INC.
250 SW 13t 6 Ave Pompano Beach, FL 33069
R E C E l `." D MAY 0 3 2006
``�L,, IIt Phone 954-784-2941
Pe ��; * i6o 3 ` O,J-1 800-848-1919
Fax 954-784-7875
www.fed-eng.com
Field Density Tests of Compacted Soils Method D-6938
Client: 1 Mel-Ry Construction Date: March 29, 2016
Addres 3 : 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 16-1030
Project: Proposed Single Family Home Perms mt #I (�4' a5�y
Addres : 10701 S. Ocean Drive, Lot 740, Jensen Beach, FL 34957 Tech: DAS
Area T ted: Demuck Excavation Backfill Compaction Req.: 95%
Materia Type: Coarse Beach Sand with Some Rock Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
Section 3/4 (E. Side of W. Half) - At
Ce�ttter of Excavation
12"
1 L
13.9
109.9
113.0
10.0
97.3%
Yes
2
Se 6 tion 3/4 (E. Side of W. Half) - At
Ce, ter of Excavation
12"
2L
17.2
109.3
113.0
10.0
96.7%
Yes
3
4
5
6
7
8
I
i
9
10
11
I
12
13
14
Remarks See Reverse Side (Page 2 of 2) for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a -verification of Soil Bearing Capacity.
Legend for Elevation:
PR = Proof oil 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = SpringMine FL = Final Lift _ Keith LeBlanc, P.E.
SG = Sub ade BG = Below Grade .
g - Federal Engineering.& Testing, Inc.
BC = Base urse BOF = Bottom of Footing _ Florida Reg. No. 59394
TOP =Top of Pipe FG =Finished Grade Certificate of Authorization #5471
As a mutual p otection to clients, the public and ourselves, all reports are submitted as the confidential prdperty of client;,, nano` authorization for publication of statements,
conclusions or extracts from or regarding our reports is reserved pending our written approval. A density test detegriiria's •6e, degree of compaction of the tested layer of material
only. A densityltloes not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on
this work.
PAGE 1 of 2
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the ;top
12" of added fill material:: FET was not contracted to perform supervision of the building pad preparation. This testing oflthe
added fill material does not include an ana'lysis of the underlying soil materials to determine if they are capable of supporting
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard !for paved areas such as roadways and parking lots. If different specifications -are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing
excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
F
Page 2 of 2
Phone 954-784-2941
875 II ederal Y�►t} 1603�'J�� Fax 800-848 1919
& TESTING INC. www.fed-eng.com
250 SW 13t�Pve Pompano Beach, FL 33069
I
Field Density Tests of Compacted Soils Method D-6938
Client: i Mel-Ry Construction Date: March 29, 2016
Addres 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 16-1030
Project: �I Proposed Single Family Home Permit #:
Address., 10701 S. Ocean Drive, Lot 740, Jensen Beach, FL 34957 Tech: DAS
Area Te ,,,,ted: Section 4/4 (W. Section) Demuck Excavation Backfill Compaction Req.: 95%
Material Type: Coarse Beach Sand with Some Rock
Proctor Method: ASTM D-1557
" Test
#
I
TEST LOCATION
Probe
Depth
p
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
I
At ,enter
of W. Excavation
12"
1L
18.2
108.2
113.0
10.0
95.8%
Yes
2
At tenter
of W. Excavation
12"
21-
18.9
109.0
113.0
10.0
96.5%
Yes
3
At 'enter
of W. Excavation
12"
31-
12.2
112.4
113.0
10.0
99.5%
Yes
4
At I
Inter of W. Excavation
12"
4L
11.3
113.6
113.0
10.0
100.5%
Yes
5
At Center
of W. Excavation
12"
5L
13.7
110.1
113.0
10.0
97.4%
Yes
I�6 i
7
II
8
9
II
10
i
11
�I12
13
III
14
it
Remarks: J$ee Reverse Side (Page 2 of 2) for Disclaimer
Fn
is a Compaction Test only on the top 12" of the pad and is not a verification ofsoil (Bearing Capacity.
Legend for El:
PR = Proofrol1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = SpringlinFL = Final Lift Keith LeBlanc, P.E. 3�9 n,
SG = SubgraBG = Below Grade Federal Engineering & Testing, Inc.
BC = BasecoBOF = Bottom of Footing Florida Reg. No. 59394
TOP = Top ofFG = Finished Grade Certificate of Authorizatiom#5471
As a mutual protclients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
conclusions or exm or regarding our reports is reserved pending ourwritten approval. A density test determines the degree ofcompaction ofthe tested layerofmaterial
only. A density doeplace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on
this work.
PAGE 1 of 2
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of the
added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
11
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing
excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
RE L E 1'. .0 MAY U e aU16
�Phone 954-784-2941ederal xvw, t } d* isq/ 800-848-1919
�r Fax 954-784-7875
& TESTING 250 SW 13th Ave Pompano Beach, FL 33069 www.fed-eng.com
Field Inspection Report
I
CLIENT
CLIE
NAME: Mel-Ry Construction, Inc. DATE: 03/30/16
I T ADDRESS: 10967 S. Ocean Drive, ORDER NO.: 16-1047
1
Jensen Beach, FL 34957 PERMIT NO.:
PRO
ECT NAME: Proposed Single Family Home
PRO
ADDRESS: 10701 S. Ocean Drive, Lot 740 ARRIVAL TIME: 9:30 AM
CON
�. Jensen Beach, FL 34957 DEPARTURE TIME: 3:30 PM
RACTOR: TOTAL TIME ON SITE: 6 Hours
it TRAVEL TIME: 4.5 Hours
DAILY CONDITIONS
I
DAY:
WEA
Mon Tue Wed X Thu Fri Sat Sun
HER: Sunny Clear Cloudy X Rain
HUMI
TEMP
ITY: Low Med X High WIND: Low Med X High
RATURE Freezing Cold Mild X Warm Hot
AREAS INSPECTED
II Location Description of Area Inspected
Type of Work Performed by Contractor
it
I� Building Pad
Demuckin / Backfillin
1I
el
I�
DAILY CONSTRUCTION ACTIVITIES .
Notes:
10:15a
i cuuprn.
Compa
-At my arrival the contractor was adding the third lift at 9:30am. Compacted third lift at 10:00am and tested. Added fourth lift at
, . Fourth lift was compacted and tested at 11:00am. Added fifth lift at 11.40am Excavation of west side of east half started at
The contractor removed muck from 3' to 8'. Poured crushed roof tile at 1230pm. Compacted and tested 1 st lift at 1:40 m.
fed and tested 2nd lift at 1:OOpm. Compacted and tested 3rd lift at 2.10pm Compacted and tested 4th lift at 2.40pm
Compacted
and tested 5tn lift at 3:10pm. Job done at 3:30 m.
�I
res A
No (If Yes, please
Was all fork performed to job specifications? Yes XNo If No ttplease explain:
report)
plain:
Who was;jnotified about any deficiencies?
Were the ldeficiencies corrected by the contractor? Yes No At what Time?
How wer ' the deficiencies corrected?
Misc. Ren> "arks:
Inspected Oy: TS
Respectfully Submitted By:
Keith LeBlanc, P.E. v y�i /`
FEDERAL' ENGINEERING 8 TESTING, NC.
Florida Reg. No.: 59394
R E C E I V T D MAY 0 3 2016 Phone 954-784-2941
Lmmjederal 800-848-1919
Fax 954-784-7875
& TESTING INC. www.fed-eng.com
250 SW 13 'Ave Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6938
Client: _Mel-Ry Construction Date: March 30, 2016
AddresE 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 16-1047
Project: Proposed Single Family Home Permit #:1663-6,S4J1i
Address! 10701 S. Ocean Drive, Lot 740, Jensen Beach, FL 34957 Tech: TS
Area Te11ted: Demuck Excavation Backfill Compaction Req.: 95%
Material ype: Coarse Beach Sand with Some Rock Proctor Method: ASTM D-1557
Test
#
I TEST LOCATION
I
Probe
Elev.
Moist
Dry
Density
Proctor
Value
Optimum
Moisture
Compaction
Pass
Depth
%
PCF
PCF
Wei
t Side of East Half - At Center of
- 1
Ex
vation
12"
1 L
10.0
112.6
113.0
10.0
99.6%
Yes
We't Side of East Half - At Center of
2
Ex avation
12"
2L
9.7
112.1
113.0
10.0
99.2%
Yes
Wet Side of East Half - At Center of
3
Exc° vation
12"
3L
10.0
109.0
113.0
10.0
96.5%
Yes
We 't Side of East Half - At Center of
4
Exco vation
12"
4L
8.8
111.3
113.0
10.0
98.5%
Yes
We
't Side of East Half - At Center of
5
Exc
I'vation
12"
5L
9.5
108.9
113.0
10.0
96.4%
Yes
6
7
el
8
9
6,
10
I
11
12
13
II
14
Remarks: I See Reverse Side (Page 2 of 2) for Disclaimer
This is a Compaction Test only on the top 12" of the pad and is not a verification of SoilBearing Capacity.
Legend for E 1 1evation:
PR = Proofrc 11 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = Springll ie FL = Final Lift Keith LeBlanc, P.E.
SG = Subgra a BG = Below Grade Federal Engineering &-Testing, Inc.
BC = Baseco'� rse BOF = Bottom of Footing Florida Reg,,,No. 59394
TOP = Top o Pipe FG = Finished Grade Certificate of Authorization P6471_ '
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and, authorisation for,pu�lication of statements,
conclusions ore {racts from or regarding our reports is reserved pending our written approval. A density test determines the degree o'r compaction of the tested layer of material
only. A density d es not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms; retesting must be performed on
this work.
PAGE 1 of 2
'I
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test mustlbe
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. 'FET was not contracted to perform supervision of the building pad preparation. This testing of the
added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications !are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing
excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
Phone 954-784-2941
ederal R E C E I V' D MAY 0 3 7 800-848-1919
Fax 954-784-7875
8 TESTING INC. www.fed-eng.com
250 SW 13t �IPve Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6938
Client: Mel-Ry Construction Date: March 30, 2016
Addres 1 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 16-1047
Project: !�' Proposed Single Family Home 1 Permit #: 1,- 05L/y
Address 10701 S. Ocean Drive, Lot 740, Jensen Beach, FL 34957 Tech: TS
Area Te ted: Demuck Excavation Backfill Compaction Req.: 95%
Material ,I ype: Coarse Beach Sand with Some Rock Proctor Method: ASTM D-1557
. Test
#
I
TEST LOCATION
Probe
Elev.
Moist
Dry
Density
Proctor
Value
Optimum
Moisture
Compaction
Pass
Depth
%
PCF
PCF
%
Eas Side of West Half - At Center of
• 1
Ex vation
12"
2L
9.8
113.7
113.0
10.0
100.6%
Yes
Easo Side of West Half - At Center of
2
Exc vation
12"
4L
9.6
111.5
113.0
10.0
98.7%
Yes
Eas 'ISide of West Half - At Center of
.vation
3
Exc
12"
5L
10.0
115.3
113.0
10.0
102.0%
Yes
i
4
l
5
6
li
7
!I
!
8
i
9
i
10
.
11
,I
12
I
13
14
u
Remarks: , ee Reverse Side (Page 2 of 2) for Disclaimer
this is a Compaction Test only on the top 12" of the pad and is not a verifi ation of Soil Bearirig-Capacity.
Legend for Elel!ation:
PR = Proofroll I 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = Springlln FL = Final Lift Keith LeBlanc, P.E.
SG = Subgrad BG = Below Grade Federal Engineering-4- Testing, Inc. -
BC = Basecour' a BOF = Bottom of Footing Florida -Peg, No. 59394
TOP = Top of ipe FIG = Finished Grade Certificate, of Authorization #5471-
As a mutual protec ion to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and -authorization fcr'publication of statements,
conclusions or extra' is from or regarding our reports is reserved pending our written approval. A density test determines the degree of co'rnpaction of the tested layer of material
only. A density doe 1 not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on
this work. i
I PAGE 1 of 2
Compacted Soils Method D-6936 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer, of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test musty be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the�top
12" of added fill material. ` FET was not contracted to perform, supervision of the, building pad preparation. This testing of the
added fill material does not include an analysis of the underlying soil materials to determine if they are capable of suppormg
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying
soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on other
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or footing
excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
LA
Phone 954-784-2941
ederal I RECEIVED M'AY 03 etr 800-848-1919
& TESTING 250 SW 13th Ave Pompano Beach, FL 3306Fax 954-784-78759 www.fed-eng.com
IField
Inspection Report
CLIE II T NAME:
Mel-Ry Construction, Inc.
DATE: 03/28/16
CLIE T ADDRESS: 10967 S. Ocean Drive,
ORDER NO.: 16-975
I
Jensen Beach, FL 34957
PERMIT NO.: (�
PRO ,ECT NAME: Proposed Single Family Home
PRO 10701 S. Ocean Drive, Lot 740
ARRIVAL TIME: 10:00 AM
IADDRESS-.
Jensen Beach, FL 34957
DEPARTURE TIME: 2:00 PM
CON CTOR:
TOTAL TIME ON SITE: 4 Hours
1
TRAVEL TIME: 3 Hours
DAILY CONDITIONS
DAY:
Mon X Tue Wed Thu Fri
Sat Sun
WEAT ER:
Sunny X Clear Cloudy Rain
HUMID�iT :
Low Med High X WIND: Low
X Med High
TEMPERATURE
Freezing Cold Mild Warm X Hot
DAILY CONSTRUCTION ACTIVITIES
Notes: C ntractor removed slab, hit water main at 1:45 pm and ceased excavation
Did you fill out any field data reports? Yes X No (If Yes, please attach to this report)
Was all wo 'I performed to job specifications? Yes X No If No, please explain:
Who was no 'tied about any deficiencies?
Were the de ciencies corrected by the contractor? Yes No At what Time?
How were th (deficiencies corrected?
Misc.
Inspected by: IJ DAS
Respectfully Submitted By:
Keith LeBlanc, P:E,
3 27�/6
FEDERAL ENGINEERING & TESTING
Florida Reg. No.: 59394
aPhone 954-784-2941
eder J - Ase 800-848-1919
qc
8 TESTING INC.LL"ym iUL 2 � 7.� 16 Fax 954-784-7875
www.fed-eng.com
250 SW 13 Ave Pompano Beach, FL =69
I
Field Density Tests of Compacted Soils Method D-6938
Client:.! Mel-Ry Construction Date: July 11, 2016 '
Addre �, : 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 16-2062
Project, Proposed Single Family Home Permit #:
Addres : 10701 S. Ocean Drive, Lot 740, Jensen Beach, FL 34957 Tech: TS
Area T Ilsted: Building Pad Compaction Req.: 95%
Material Type: Coarse Beach Sand with Some Rock Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth-
Elev.
. ..
Moist
.%
Dry
Density
"PCF
Proctor
Value
PCF
Optimum
Moisture
Compaction
Pass'_
1
N i
Corner of Pad
12"
FL-
8.3
113.3
113.0
10.0
100.3%
Yes,
2
lI
Ce,'I
ter of Building Pad
12"
FL
1 8.8
108.0
113.0
10.0
95.6%
Yes
3
SEI6rner
of Pad
12"
FL
7.1
115.4
113.0
10.0
102.1 %
Yes
4
5
6
�I
i
7
I
8
9
�
110 �
11
12
�I
13
l
14
t
Remarks: III See Reverse Side (Page 2 of 2) for Disclaimer
This is a Compaction Test only on the top 12" of the footings and is not a verification.of Soil Bearing Capacity.
Legend for evation:
PR = Proofrid�11'
1,2,3 = 1st, 2nd, 3rd Lift Submitted by:,
SL = Springe FL = Final Lift Keith LeBlanc,-P.E. , '
SG = Subgrade BG =Below Grade Federal Engineering & Testing, Inc. 71 A/ 16
BC = Base urse BOF = Bottom of Footing Florida Reg. N6. 56394
TOP = Top o Pipe FG = Finished Grade
Certificate -of Authorization #.5471
As a mutual pro
t fiction to clients, the public and ourselves, all reports are submitted as the confidential property of clients; and authorization for publication of statements,
conclusions ore racts from or regarding our reports is reserved pending our written approval. A density test determines the degree of compaction of the tested layer of
material only. A ensity does not replace a soil bearing capacity determination. After laying dormant for a period of 90 days or, after heavy rain/storms, retesting must be
performed on thi ',I ork.
PAGE 1 of 2
r
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer 'of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing,of
the added fill material does not include an analysis of the underlying soil materials to determine if they are capable�of
supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil
materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of
the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure Ito
verify the underlying soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils, is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified. I
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions'on
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility, or
footing excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be! � re -
compacted and re -tested prior to construction. '
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
250
Area
Phone 954-784 2941
e Al - ' 800-848-1919
Fax 954-784-7875
$ TESTING INc. www.fed-eng.com
13th Ave Pompano Beach, FL 33069
Field Density Tests of Compacted Soils Method D-6938
Mel-Ry Construction Date: June 15, 20116
10967 S. Ocean Drive, Jensen Beach, FL 34957 Order M 16-1778
Proposed Single Family Home Permit #: /&09 — bS-"
10701 S. Ocean Drive, Lot 740, Jensen Beach, FL 34957 Tech: TS
Footings Compaction Req.:
Type: Coarse Beach Sand with Some Rock
95%
Proctor Method: ASTM D-1557
Test
#
I
I
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
Proctor
Value
PCF
Optimum
. Moisture
%
Compaction
Pass
1
�II
I,
W Corner of Pad
12"
BOF
9.8
107.8
113.0
10.0
95.4%
Yes
2
11E
Corner of Pad
12"
BOF
9.3
108.0
113.0
10.0
95.6%
Yes
3
�IW
Corner of Pad
12"
BOF
8.7
108.6
113.0
10.0
- 96.1 %
Yes
4
4,E
Corner of Pad
12"
BOF
10.0
108.2
113.0
10.0
95.8%
Yes
5
II
6
i
f
7
I
8
it
9
I
10
I
i
11
I
'
12
j
13
i
14
i
KemarKp: See Reverse Side (Page 2 of 2) for Disclaimer
lThis is a Compaction Test only on the top 12" of the footings and is not a verification of Soil Bearing Capacity.
Legend f r Elevation:
PR = Pro �froll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = Spn ghne FL = Final Lift Keith LeBlanc, P.E.
SG = Subgrade BG = Below Grade Federal, Engineering & testing, Inc.
BC = Bas course BOF = Bottom of Footing Florida -Reg. No. 59394
TOP = To of Pipe FG = Finished Grade Certificate of'Authorizaiion #5471
As a mutual I rotection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, arid. authorization for publication of statements,
conclusions r extracts from or regarding our reports is reserved pending our written approval. A density test determin6s,the degree of'corripa on of the tested layer of
material onl 'I A density does not replace a soil bearing capacity determination. After laying dormant for a period of 90 day's'ur,after heavy �alnlstortns, retesting must be
performed or this work. i I I
PAGE 1 of 2
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of I
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be'
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing ofl
the added fill material does not include an analysis of the underlying soil, materials to determine if they are capable of.
supporting the proposed structure without settlement. This density compaction test does not warranty any underlying soil'
materials or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location oof
the proposed structure, we recommend performing soil borings below all foundation areas of the proposed structure t101
verify the underlying soil conditions. j
li
Environmental analysis of the soil materials is not part of the scope of services.. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.'
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundation, s
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications alre
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
other areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility Ili
or
footing excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -
compacted and re -tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending our written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
LI
i dl Phone 954-784-2941
-- cffq44 800-848.1919
Fax 954-784-7875
' & TESTING INC. www.fed-ong.com
250 1,
13th Ave Pompano Beach, FL 33M
Field Density Tests of Compacted Soils Method D-6938
Client:
Mel-Ry Construction Date: June 15, 2016
Adi
ress: 10967 S. Ocean Drive, Jensen Beach, FL 34957 Order #: 16-1778
Pr
j ect: Proposed Single Family Home Permit #:
Ad4
ress: 10701 S. Ocean Drive, Lot 740, Jensen Beach, FL 34957 Tech: TS
ArE
it Tested: Footings Compaction Req.: 95%
Ma
real Type: Coarse Beach Sand with Some Rock Proctor Method: ASTM D-1557
Te
#,i
1J
t TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
Proctor
Value
Optimum
Moisture
Compaction
Pass
PCF
PCF
%
1
! NW Corner of Pad
12"
BOF
9.8
107.8
113.0
10.0
95.4%
Yes
2
i NE Corner of Pad
12"
BOF
9.3
108.0
113.0
10.0
95.6%
Yes
3
1SW Corner of Pad
12"
BOF
8.7
108.6
113.0
10.0
96.1 %
Yes
l
4
SE Corner of Pad
;
12"
BOF
1 10.0
108.2
113.0
10.0
95.8%
Yes
5e
i
6f
81
i
i
9
10 ''
11
12
13
14,
I
Remarks:
See Reverse Side (Page 2 of 2) for Disclaimer �`�►►�I I I rt��,��
This is a Compaction Test only on the top 12" of the footings and is not a ver' rib f3a acity.
tl for Elevation:
Lege
PR =
roofroll 1,2,3 =1st, 2nd, 3rd Lift Submitted by:
SL =
pringline FL = Final Lift Keith=W&6c, P.E. ; ..
SG =
ubgrade BG = Below Grade Feder, c`neeh1r_dkT tlng, IryC
BC =
TOP
asecourse BOF = Bottom of Footing Floridiat — 4.1 9394
Top of Pipe FG =Finished Grade Certifici�````.
As
'tual
a m
conclustins
protection to clients, the public and ourselves, all reports are submitted as the confidential property of cl(ertts,tiJ�i YI1��ti
or extracts from or regarding our reports is reserved pending our written approval. A density test determines the p ` on of statements,
of the tested layer
material
perform
����� of
only. A density does not replace a soil bearing capacity determination. After Iayin9 dormant for a period of 90 days or after frtfstarms, retesting must be
d on this work.
PAGE 1 of 2
'I
Compacted Soils Method D-6938 Disclaimer
Purs' ant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
proje t on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
mate vial only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
perfo 'med by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the top
12" o , added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of
the a ded fill material does not include an analysis of the underlying soil materials to determine if they are capable of
supp rting the proposed structure without settlement. This density compaction test does not warranty any underlying soil
matey++als or conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of
the p Iloposed structure, we recommend performing soil borings below all foundation areas of the proposed structure to
verify the underlying soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
requirid, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for det, rmination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job prllject specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results;'jare based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98°6 of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
require, Federal Engineering & Testing, Inc, shall be notified.
Our fin ings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
other a 11eas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, utility or
footing ;excavations, overgrown vegetation, traffic and other disturbances will void this test and the site must be re -
comp and re -tested prior to construction.
As a m0tual protection to clients, the public and ourselves, all reports are submitted as the confidential property of our client
and autiorization for use, publication of statements, conclusions or extracts from or regarding our reports is reserved
pending ,lour written approval.
It has b�°en a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2