HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTPEST
PEST
We,
r-
St Lucie County Inspecttons
2300 Virginia Avenue
Ft Pierce, FL 34982 VOCANNED
(772) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT_ M /
# JOB ADDRESS
ER ,
CONTRACTOR a4 `'7•�-d
LICENSE #�
-4-A1,� H CAJ 7-
undersigned, hereby certify that we have pretreated the above -described construction for
inean termites in accordance with the standards of the National Pest Control Association.
Squai a feet of area treated: 2 3 S !!�
Per 7ge of solution: a D 6 Z()
Date Of treatment:
Chemicals used: T±e-r 1(C(o r" f�£
Total gallons used: atP
-Time-of Treatment:- Y"do ail
Footing
1st Treatment
FBC104.2.6 Certi, ficate of Protective Treatment for prevention of termites.
❑ Re -treat
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
and
Slab
completed; providing a copy for the person the permit is issued to
❑ 1st Treatment
another copy for the building permit files. The Treatment Certi, ficate shall
provide the product used, identity of the applicator, time and date of the
❑ Re -treat
treatment, site location, area treated chemical used percent concentration
Drivewayand
number of gallons used, to establish a ver fiable-record of protective
treatment. If the soil chemical barrier method for termite prevention is used,
❑ 1st Treatment
final exterior treatment shall be completed prior to final building approval.
❑ Re -treat
St Lucie County requires for the final inspection for CO, a Permanent
Pools
Sticker to be placed on the electrical panel box cover, listing all the
❑ 1st Treatment
treatments and dates of applications.
❑ Re -treat
Other
❑ 1st Treatment
❑ Re -treat
Perimeter for Final Inspection
Signature of exterminator
There must be a completed form for each required treatment or re -treatment and this form must be on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will
PEST I CONTROL
We,
kE C� St Lucie County Inspectia-,
;. 2300 Virginia Avenue
Ft Pierce, FL 34982
O(772) 462-2172
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
JoB.ADDRESs I0 _X_'5. _Qm_n dr lad Se�►SQ.� . 'FI
L LICENSE
es.�- fir wevi e wi
undersigned, hereby certify -that we have pretreated the above -described construction for
mean termites in accordance with the standards of the National Pest Control Association.
Squa ;I feet of area treated: S
Perce� tage of solution: Duo
Date of treatment: %- 5,18
Footing
❑ 1st Treatment
❑ Re -treat
Slab
❑ 1st Treatment
❑ Re -treat
Driveway
❑ 1 st Treatment
❑ Re -treat
Pools
❑ 1st Treatment
❑ Re -treat
Chemicals used: 'TP.r uU -JOC '�h
Total gallons used: 30
Time of Treatment: a.&
FBC104.2.6 Certificate of Protective Treatment for prevention of termites.
A weather resistant jobsite posting board shall be provided to receive
duplicate Treatment Certificates as each required protective treatment is
completed providing a copy for the person the permit is issued to and
another copy for the building permit files The Treatment Certificate shall
provide the product used identity, of the applicator, time and date of the
treatment, site location, area treated chemical used percent concentration
and number of gallons used, to establish a verifiable record of protective
treatment. If the soil chemical barrier method for termite prevention is used
final exterior treatment shall be completed prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent
Sticker to be placed on the electrical panel box cover, listing all the
treatments and dates of applications. . j
Other
❑ 1st Treatment R ��IV�D j
❑ Re -treat U( 08110
Perimeter for Final Inspection
1i4
�� ��r �S
Signature of exterminator
There must be a completed form for each required treatment or re -treatment and this form must be on
the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will