Loading...
HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTPEST PEST We, r- St Lucie County Inspecttons 2300 Virginia Avenue Ft Pierce, FL 34982 VOCANNED (772) 462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT_ M / # JOB ADDRESS ER , CONTRACTOR a4 `'7•�-d LICENSE #� -4-A1,� H CAJ 7- undersigned, hereby certify that we have pretreated the above -described construction for inean termites in accordance with the standards of the National Pest Control Association. Squai a feet of area treated: 2 3 S !!� Per 7ge of solution: a D 6 Z() Date Of treatment: Chemicals used: T±e-r 1(C(o r" f�£ Total gallons used: atP -Time-of Treatment:- Y"do ail Footing 1st Treatment FBC104.2.6 Certi, ficate of Protective Treatment for prevention of termites. ❑ Re -treat A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is and Slab completed; providing a copy for the person the permit is issued to ❑ 1st Treatment another copy for the building permit files. The Treatment Certi, ficate shall provide the product used, identity of the applicator, time and date of the ❑ Re -treat treatment, site location, area treated chemical used percent concentration Drivewayand number of gallons used, to establish a ver fiable-record of protective treatment. If the soil chemical barrier method for termite prevention is used, ❑ 1st Treatment final exterior treatment shall be completed prior to final building approval. ❑ Re -treat St Lucie County requires for the final inspection for CO, a Permanent Pools Sticker to be placed on the electrical panel box cover, listing all the ❑ 1st Treatment treatments and dates of applications. ❑ Re -treat Other ❑ 1st Treatment ❑ Re -treat Perimeter for Final Inspection Signature of exterminator There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will PEST I CONTROL We, kE C� St Lucie County Inspectia-, ;. 2300 Virginia Avenue Ft Pierce, FL 34982 O(772) 462-2172 CERTIFICATE OF TERMITE TREATMENT CONSTRUCTION SOIL TREATMENT JoB.ADDRESs I0 _X_'5. _Qm_n dr lad Se�►SQ.� . 'FI L LICENSE es.�- fir wevi e wi undersigned, hereby certify -that we have pretreated the above -described construction for mean termites in accordance with the standards of the National Pest Control Association. Squa ;I feet of area treated: S Perce� tage of solution: Duo Date of treatment: %- 5,18 Footing ❑ 1st Treatment ❑ Re -treat Slab ❑ 1st Treatment ❑ Re -treat Driveway ❑ 1 st Treatment ❑ Re -treat Pools ❑ 1st Treatment ❑ Re -treat Chemicals used: 'TP.r uU -JOC '�h Total gallons used: 30 Time of Treatment: a.& FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed providing a copy for the person the permit is issued to and another copy for the building permit files The Treatment Certificate shall provide the product used identity, of the applicator, time and date of the treatment, site location, area treated chemical used percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite prevention is used final exterior treatment shall be completed prior to final building approval. St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. . j Other ❑ 1st Treatment R ��IV�D j ❑ Re -treat U( 08110 Perimeter for Final Inspection 1i4 �� ��r �S Signature of exterminator There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will