HomeMy WebLinkAboutENGINEERING & TESTINGedertil
I =U Lei I 'N 4 4 IMill & TESTING INC.
250 SW 13th AYp Pompano Beach, FL 33069
Client:
Address:
Project:
Address:
Area Te
Material
SCANNED
By
St. Lucie count
Field Density Tests of Compacted Soils Method D-6938
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
www.fed-eng.com
JMC Contracting, Inc
Date:
June 5, 2013
41 E. Ocean Blvd., Stuart, FL 34994
Order #:
13-1542
Proposed Residence
Permit #:
1848 Wildcat Cove, Fort Pierce, FL
Tech:
SJ
;d: Building Pad
Compaction Req.:
95%
ipe: Light Brown Sand w/Shell Frags & Traces of Rock
Proctor Method:
ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
Proctor
Value
Optimum
Moisture
Compaction
Pass
PCF
PCF
%
1
NW Jrner
of Pad
12"
FG
8.1
106.4
108.0
10.6
98.5%
Yes
2
NE Coiner
of Pad
12"
FG
7.3
105.9
108.0
10.6
98.1 %
Yes
3
Center �1,bf
Pad
12"
FG
7.8
106.6
108.0
10.6
98.7%
Yes
4
SEC
fter of Pad
12"
FG
7.5
107.1
108.0
10.6
99.2%
Yes
5
SW Ca!
ner of Pad
12"
FG
8.2
106.3
108.0
10.6
98.4%
Yes
6
l
7
8
9
10
EC
12
13
jD�D
14
;I
15�
Remarks: SIlee Reverse For Disclaimer
Legend for El4ation:
PR = Proofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by: ✓!(,fie
SL — Springline FL Final Lift KEITH LEBLANC /
SG = Subgrade BG = Below Grade Professional Engineer #559394
BC = Basecou �r BOF = Bottom of Footing Cert. of-Authorizatioli #5471 :=
TOP = Top of P'I a FG = Finished Grade State of F lorida-
As a mutual protecti,to clients, the public and ourselfs, all reports are submitted as the confidential property of clients, and authorizatibn-fo�publication,Ifatatements,
conclusions or extra fs from or regarding our reports Is reserved pending our written aproval. A density test determines the degree of.,coinpactio n af.ttie tested layer of material
only. A density does, `ot replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms; retestinginust be performed on,
this work. ,
Pursuant to your request, Federal Engineering & Testing, Inc has performed- a
compaction test at the referenced project on the reverse side. The purpose of our test was
to determine the degree of compaction of the tested layer of material only. In no way
shall a compaction test replace a soil bearing capacity determination. A soil boring test
must be performed by client prior to construction to verify subsoil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If
environmental analysis of the soils is required, we can provide a proposal for performing
an environmental analysis of the soil materials. The scope of services is for determination
of the degree of compaction of the tested layer of material only. No other analysis is
implied or warranted.
Job project specifications were not available at the time the work was performed.
Determination of the pass/fail compaction results are based on current cominon industry
requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of
the AASHTO T-180 standard for paved areas. such as roadways and parking lots. If
different specifications are required, Federal Engineering & Testing, Inc shall be notified.
Our findings are relative to the date and areas of our site work and should not berelied
upon to represent conditions on other areas or dates. Any subsequent site disturbances
due to water erosion, rain, construction activities, excavations, overgrown, vegetation,
traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
4A, mutual protection to clients, the public and ourselves, all reports are submitted are
the confidential -property of clients and authorization for use, publication of statements,
conclusions or extracts.: from or regarding our reports is reserved pending written
approval.
It has been a pleasure working with you' and look forward to do so in the near future.
eder.31
U2rH1:9a= & TESTING INC.
250 SW 13th A ,e Pompano Beach, FL 33069
Client:
Address:
Project:
Address:
Area Test
Material
Field Density Tests of Compacted Soils Method D-6938
Phone 954-784-2941
800-848-1919
Fax 954-784-7875
www.fed-eng.com
JMC Contracting, Inc Date: June 5, 2013
41 E. Ocean Blvd., Stuart, FL 34994 Order #: 13-1542
Proposed Residence Permit #:
1848 Wildcat Cove, Fort Pierce, FL Tech: SJ
:d: Building Pad Compaction Req.: 95%
(pe: Light Brown Sand w/Shell Frags & Traces of Rock Proctor Method: ASTM D-1557
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
°
�0
Dry
Density
PCF
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
1
NW Corner of Pad
12"
FG
8.1
106.4
108.0
10.6
98.5%
Yes
2
6I
NEC ner of Pad
12"
FG
7.3
105.9
108.0
10.6
98.1 %
Yes
3
i
Centers of Pad
12"
FG
7.8
106.6
.108.0
10.6
98.7%
Yes
4
SE Corner of Pad
12"
FG
7.5
107.1
108.0
10.6
1 99.2%
Yes
5
I
SW Corner of Pad
12"
FG
8.2
106.3
108.0
10.6
98.4%
Yes
6
i
7
!
8
9
I!
10
11
�.I
12
If
13
14
i
!
15
Remarks: $ee Reverse For Disclaimer
Legend for Ele Nation: /
PR = Proofroll ! 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:��fe
SL = Springline FL = Final Lift KEITH LEBLANC
SG = Subgrad BG = Below Grade Professional Engineer #59394
BC = Basecou a BOF = Bottom of Footing Cert. of Authorization #5471
TOP = Top of 'Ipe FG = Finished Grade State of Florida
As a mutual protection to clients, the public and ourselfs, all reports are submitted as the confidential property of clients, and authorization for publication of statements,
conclusions or extralcts from or regarding our reports is reserved pending our written aproval. A density test determines the degree of'cc npactiori of the�tested layer of material
only. A density doesi'rot replace a soil bearing capacity determination. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on
this work.
Pursuant to your request, Federal Engineering & Testing, Inc has performed a
compaction test at the referenced project on the reverse side. The purpose of our test was
to determine the degree of compaction of the tested layer of material only. In no way
shall a compaction test replace a soil bearing capacity determination. A soil boring test
must be performed by client prior to construction to verify subsoil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If
environmental analysis of the soils is required; we can provide a proposal'fdr performing
an environmental analysis of the soil materials. The scope of services is for determination
of the degree of compaction of the tested layer of material only. No other analysis is
implied or warranted.
Job project specifications were not available at the time the work was performed.
Determination of the pass/fail compaction results are based on current common industry
requirements of 95% of the ASTM D-1557 standard for building foundations and 98% of
the AASHTO T-180 standard for paved areas such as roadways and parking lots. If
different specifications are required, Federal Engineering & Testing, Inc shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied
upon to represent conditions on other areas or dates. Any subsequent site disturbances
due to water erosion, rain, construction activities, excavations, overgrown, vegetation,
traffic and other disturbances will void this test and the site must be re -compacted and re-
tested prior to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are
the confidential property of clients and authorization for use, publication of statements,
conclusions or extracts from or regarding our reports is reserved pending written
approval.
It has been a pleasure working with you and look forward to do so in the near future.