HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTBUIL[
PEST
PEST
We,
Squ
a, Lutz ramly
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
#: 1V?-Q6Yj,, JOB AD
/CONTRACTOR:
NTROL CONTRACTOR:
NTROL LICENSE #: JB175775
'-A-BUG TERMITE & PEST CONTROL INC.
undersigned, hereby certify that we have pretreated the above described construction for
nean termites in accordance with the standards of the National Pest Control Association.
if area treated: o
of solution:.05%
Date o I Treatment:
z
Chemicals used: DOMINION 2L
Total gallons used:
20
Time of Treatment: q r,0<2�
Slab
sr Treatment 1st Treatment
.e-Treat Re -Treat
Pools
1st Treatment
Re -Tr►ther
11� Y'reatment
Re -Treat
1st Treatment
Re -Treat
Perimeter for Final Inspection
Sig a of Exterminator Date
Note: There must be a completed form for each required treatment or re -treatment and this form must be on the job
site toe picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
fee ch �aed.
FBC10�4.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board
shall b 11 provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
provide' g a copy for the person the permit is issued to and another copy for the building permit files. The Treatment
Certifi to shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
treate Ichemical used, percent concentration and number of gallons used, to establish a verifiable record of
prote eve treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be co pleted prior to final building approval.
St Lu 'le County requires for the final inspection for CO, a Permanent Sticker to be placed on
the electrical panel box cover, listing all the treatments and dates of applications.
Revised 7/24/2014
rl
SCANNED
�gno7 a� 6u� 1►Wad
:� . Lim
ieoun auawk+edafl
Planning & Development Services ad'�
Building & Code Regulation Division ��U6
2300 Virginia Ave a�ria�3a
• Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
1807-0686 JOB ADDRESS: 6523 ZAPOTE FORT PIERCE, FL 34951-4452
WYNNE DEVELOPMENT
CONTROL CONTRACTOR: EVICT A -BUG TERMITE & PEST CONTROL INC.
CONTROL LICENSE #: JB175775
the undersigned, hereby certify that we have pretreated the above described construction for
arranean termites in accordance with the standards of the National Pest Control Association,
uare feet if area treated: 210 LF
of solution: -05%
of Treatment: 10-28-2018
1't Treatment
Re -Treat
1st Treatment
Re -Treat
1st Treatment
Re -Treat
Chemicals used: DOMINION 2L
Total gallons used: 115
Time of Treatment: 1:30
Slab
1st Treatment
Re -Treat
Pools
1s` Treatment
Re -Treat
=Perimeter for Final Inspection
PAUL C LUGARA A 8, ol;;oCo'" 04-18-19
Signature of Exterminator Date
e: There must be a completed form for each required treatment or re -treatment and bfiis form must be on the job
to be picked up by the inspector at time of each inspection or the scheduled inspection w111 fall and a re -Inspection
charged.
FB'C104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistantjobsMe posting board
sh '# be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, '
pr aiding a copy for the person the permit is issued to and anoffier copy for the building permit files The Treatment
Ce ' pte shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
trted, chemical used, percent concentration and number ofgallons used, to establish a verifiable record of
pr tecbve treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be', pleted prior to final building approval.
St Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
th electrical panel box cover, listing all the treatments and dates of applications.
7/24/2014
planning & Development Services
suilldirng &(Coale ReguHation Division
2300 Virginia Ave
Fort Pierce, K 34982
772-462-2172 FaX 772-462-W3
c caps ► r,ucTll�, f!>Tl_ T;1 EAT MF.WIT
MIT #:jS2 — D �O� ADDRESS: A �ZE ����� �f F /t-
LDER/CONTRACT'OR: 'f-e --
T CONTROL CONTRACTOR: ICT A -BUG TERMITE & PEST CONTROL INC.
T CONTROL LICENSE #: J8176775
the undersigned, hereby certify that we have pretreated the above described construction for
arranean termites in accordance with the standards of the National Pest Control Association.
re feet if area treated: /d
ntage of solution: .05%
of Treatment: /7` z4 ,5f
_111 Treatment
Re -Treat
Chemicals used: DOMINION 2L
Total gallons used: '9_ f 0
Time of Treatment: , �a
Slab
_(1st Treatment
Re -Treat
Pools
lst Treatment 1st Treatment
Re -Treat Re -Treat
Other Perime er for Final Inspection
11t Treatment l�
Re -Treat
s!:t tur of Exterminator ate
Note I There must be a completed form for each re qul edrnent or re -treatment and this form must be on the job
site be picked up by the inspector at time of each inspection or the scheduled Inspection will fall and a re-Inspectlon
fee c is aged.
F®C "040206 Certificate of Protective Treatment for preventlon of termites A weather resistant jobsite posting board
shall e provided to receive duplicate Treatment Certlficates as each required protective treatment Is completed,
proof ing a copy for the person the permit Is issued to and another copy for the building permit flIes. The Treatment
Certl cate shall provide the product used, Identity of the applicator, time and date of the treatment, site location, area
treatd, chemical used, percent concentration and number of gallons used, to establlsh a verifiable record of
prote ive treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
be completed prior to final building approval.
St L 'due CCoaun yy m quires for the final inspection for (CO3 a Permanent Sticker to be placed on
the lectricel panel box cover, ll'usiting all the treatments and dates of applications.
Rcvtocd