Loading...
HomeMy WebLinkAboutFINISHED FLOOR CALCULATORFINISHED FLOOR CALCULATOR STEP 1. CALCULATE MINIMUM FINISHED FLOOR ELEVATION ALLOWED BY HEALTH DEPARTMENT CONSTRUCTION PERMIT (1) BENCHMARK ELEVATION (SEPTIC PERMIT & SURVEY) 51 87 - FEET (2) STUBOUT INVERT ABOVE BENCHMARK (SEPTIC PERMIT) INCHES = 0.58 FEET (3) DEPTH OF FOOTING AND SLAB (FOUNDATION PLAN) 20 INCHES = 1.67 FEET CALCULATED F.F.E. (MIN.) = 18.62 FEET NOTE: MINIMUM FINISHED FLOOR ELEVATION ASSUMES 6 INCHES FOR DIAMETER AND SLOPE OF BUILDING SEWER. STEP 2. CALCULATE LOWEST GRADE POSSIBLE AT ADJACENT PROPERTY LINE R -,c� (4) ACTUAL BUILDING SETBACK FROM ADJACENT PROPERTY LINE (SURVEY) 14.00 FEET (5) MINIMUM GRADE AT ADJACENT PROPERTY LINE (CALCULATED) 17.30 FEET (6) EXISTING GRADE AT ADJACENT PROPERTY LINE (SURVEY) ,-;t�6 00 FEET zo STEMWALL MAY BE NECESSARY NOTE: 1. SPREADSHEET WILL NOT WORK FOR STEPPED FOOTINGS. 2. MINIMUM GRADE AT ADJACENT PROPERTY LINE ASSUMES: A. TWELVE INCHES MINIMUM COVER OVER FOOTING PER FBC. B. A 4 FOOT LEVEL AREA ADJACENT TO THE FOUNDATION FOR LANDSCAPING; EGRESS, MECHANICAL EQUIPMENT, ETC. C. A 3:1 MAXIMUM GROUND SLOPE FROM 4 FOOT LEVEL AREA DOWN TO THE ADJACENT PROPERTY LINE.