Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORMSCANNED BY Wit.'i ude County XANNEn BY Planning & Developmen,S'etyicesC,,D-�),i Building & Code Regulation Division 2300 Virginia Ave, Rm 201 Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method 11 �p19 lo, pepar �mvnt st• Permit #: 56 C- Address: F1 >%/ C1147 �, 6 � struction: (New Construction — Complete Existing — After Addition ie Infiltration Test R ps SI.0 Climate Zone 2 (50) _ - - ? Test Date: d"'_ f me = %% 7 l --T-- (50) = CFM (50) x 60 / Volume = Z Mec anical Ventilation required less than 5 ACH ing results must be & ACH (50) or less Gass ( ) Fail Energy building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 2 air changes per r in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a ver door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in ion 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an �oved third party. A written report of the results of the test shall be signed by the party conducting the test and Tided to the code official. Testing shall be performed at any time after creation of all penetrations of the building mal envelope. Residential are the air infiltration rate of a dwelling unit is less than 5 air changes per hour when tested with a blower door at a ;sure of 0.2 inch w. C. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. Name: Pro Duct Services Address: 1915 Rio Vista dr., Fort Pierce, fl. !by certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation rements in accordance with Section R402.4.1.2 Climate Zone 2. Name: Michael nse/Certification #: 5059122 *ment Professional insulators of South Florida FT'C Insulation In.tallaNnn ( crtificote io: �t Lucie Counu Date: 21. 2019 _ _— Its: I .ot;131ock: 4ddresv: 181 El Camino Real I'rojcM: 'the undersigned hercbc certnrtes enat Insunum-i n-- ­«., .•.-,• ,..- - - Spra%-on Cellulose 1. Ftterior CBS tralls have been insulated Mill: Fiberglass Blankets Thickness in inches: H moil Rock Wool Blaul.ets Manufacturer: _ .4luncinam Foil l)euiin: _ R 4.1 Rigid Board R-\'aloe: _ Polsstsrene Other 2. ('eilings ttecelt�ase been insulated Nith: 5pra}-on Cellulose Fiberglass Blnssn Thickness in inches: 11.1" Climatepro Rock 1\0ol Blankets Manufacturer: kluminum Foil llensits: R-31) Poh urethane R-� glue: O en Cell SP1. Ceiling's IInaccessible) insulated with: SpraN-on ( ellulose thickness in inches: 9,� Fiberglass Blankets _ Manufacturer: Th., Mantiille Ipnitiun Barrier her'lass Bln%n I)enzit�: R- St) Cellulose Loose Kilt R-N Glue: Open Celt SPP 3. Interior kncewalls hale been insutatect with; Fiberglass Blankets Thickness in incho: r Fiberglass Louse Fill Manufacturer: Rock Woof Densifla Fiberglass Blown It-N aloe: Cellulose Loose Fitt Open Cell 'il'F 4. Garage partition walls of .VC` lining area hose fiberglass Blanket: been insulated with: Rock M oot Thickness in inches: ;. Poi. urethane Manufacturer: John% Man1 ille SpraN-on Cellulose I)emit�:K Open Cell SPF RA clue: ��R• I I ��— S. The follotting hase been bliulated: j11�11111JI111 WYNNE BUILDING CORP. ti��:: Dpt RATF •0 1. General CoutractlBuilder _ 1 ® Com retener > �'®��s�Fon�t��•'� Professional Insulators of South Florida. Inr, '/I,e11nc` Insulation Contractor