HomeMy WebLinkAboutBLOWER DOOR TEST FORMSCANNED
BY
Wit.'i ude County
XANNEn
BY
Planning & Developmen,S'etyicesC,,D-�),i
Building & Code Regulation Division
2300 Virginia Ave, Rm 201
Fort Pierce, FL 34982
Phone:772-462-2165 Fax:772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
11 �p19
lo, pepar �mvnt
st•
Permit #: 56 C-
Address: F1 >%/ C1147 �, 6 �
struction: (New Construction — Complete
Existing — After Addition
ie Infiltration Test R ps SI.0 Climate Zone 2
(50) _ - - ? Test Date: d"'_ f
me = %% 7 l --T--
(50) = CFM (50) x 60 / Volume = Z Mec anical Ventilation required less than 5 ACH
ing results must be & ACH (50) or less Gass ( ) Fail
Energy
building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 2 air changes per
r in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
ver door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
ion 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
�oved third party. A written report of the results of the test shall be signed by the party conducting the test and
Tided to the code official. Testing shall be performed at any time after creation of all penetrations of the building
mal envelope.
Residential
are the air infiltration rate of a dwelling unit is less than 5 air changes per hour when tested with a blower door at a
;sure of 0.2 inch w. C. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
dwelling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
Name:
Pro Duct Services
Address: 1915 Rio Vista dr., Fort Pierce, fl.
!by certify that the above House Infiltration results demonstrate compliance with FBC Energy Conservation
rements in accordance with Section R402.4.1.2 Climate Zone 2.
Name: Michael
nse/Certification #: 5059122
*ment
Professional insulators of South Florida
FT'C Insulation In.tallaNnn ( crtificote
io: �t Lucie Counu Date: 21. 2019 _ _—
Its: I .ot;131ock:
4ddresv: 181 El Camino Real I'rojcM:
'the undersigned hercbc certnrtes enat Insunum-i n-- «., .•.-,• ,..- -
-
Spra%-on Cellulose
1. Ftterior CBS tralls have been insulated Mill:
Fiberglass Blankets
Thickness in inches:
H moil
Rock Wool Blaul.ets
Manufacturer: _
.4luncinam Foil
l)euiin:
_
R 4.1
Rigid Board
R-\'aloe:
_
Polsstsrene
Other
2. ('eilings ttecelt�ase been insulated Nith:
5pra}-on Cellulose
Fiberglass Blnssn
Thickness in inches: 11.1"
Climatepro
Rock 1\0ol Blankets
Manufacturer:
kluminum Foil
llensits:
R-31)
Poh urethane
R-� glue:
O en Cell SP1.
Ceiling's IInaccessible) insulated with:
SpraN-on ( ellulose
thickness in inches:
9,�
Fiberglass Blankets _
Manufacturer:
Th., Mantiille
Ipnitiun Barrier
her'lass Bln%n
I)enzit�:
R- St)
Cellulose Loose Kilt
R-N Glue:
Open Celt SPP
3. Interior kncewalls hale been insutatect with;
Fiberglass Blankets
Thickness in incho:
r
Fiberglass Louse Fill
Manufacturer:
Rock Woof
Densifla
Fiberglass Blown
It-N aloe:
Cellulose Loose Fitt
Open Cell 'il'F
4. Garage partition walls of .VC` lining area hose
fiberglass Blanket:
been insulated with:
Rock M oot
Thickness in inches:
;.
Poi. urethane
Manufacturer:
John% Man1 ille
SpraN-on Cellulose
I)emit�:K
Open Cell SPF
RA clue: ��R•
I I
��—
S. The follotting hase been bliulated:
j11�11111JI111
WYNNE BUILDING CORP. ti��:: Dpt RATF •0 1.
General CoutractlBuilder _ 1
®
Com retener > �'®��s�Fon�t��•'�
Professional Insulators of South Florida. Inr, '/I,e11nc`
Insulation Contractor