Loading...
HomeMy WebLinkAboutBLOWER DOOR TEST FORMBY Planning & Deve ropm`le%I Services 1•= = _ _ Building & Code Regulation Division 2300 Virginia Ave, Rm 201 • • I D A Fort Pierce, FL 34982 Phone:772-462-2165 Fax:772-462-6443 BLOWER DOOR TEST FORM House Infiltration Test Certification Prescriptive and Performance Method ?F ��F. ✓G� j c�r���a 14c9a 10' Ic600:11:7 Address: ruction: () New Construction — Complete ( ) Existing —After Addition H 'Ouse Infiltration Test Results SLC Climate Zone 2 1� CF (50) = `c7 5 Q Test Date: to 2 I Volume ACTH (50) = CFM (50) x 60 / Volume = Mechanical Ventilation required less than 3 ACH Pa III Ing results must be & ACH (50) or less (� Pass ( ) Fail The uilding or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hou in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blo r door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Secti �n 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an appr ved third party. A written report of the results of the test shall be signed by the party conducting the test and provi ed to the code official. Testing shall be performed at any time after creation of all penetrations of the building ther 11 p/ envelope. FBC, Residential IN I the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a press 11re of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the 4elling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3. 11 Com an /� r (j D7 M \QYnrn08c C—U , ?.S ' ' Comp � Comp ,i y Name: �i Address: I here �y certify that the above House Ir�filtration results demonstrate compliance with FBC Energy Conservation reouir Lentsivaccordance-with Sectidn2402.4.1.2 Climate Zone 2. Printed I p a a-Sa r, 7-cz C'kc"cek � 2� 0& License ,Certification #: � I IT �� E I • moo,,. Planning & Development Services Building & Code Regulation Division' ' -2300 Virginia Ave, Rm 201 .: RECEIVED _ Fort Pierce, FL 34982: 772462-2165 Fax 772462 6443 . JU.N . fl 2019 FBC ENERGY CONSERVATION CODE Permitting Departfnont Duct Sealing Certification St. Wi ie County . it %1 Prescriptive and Performance"Method .' U Permit#: I j � � Lot#:... Co Ili ... .. �(` -1-(j tractor: I �S . ( �� Address:. 0((1 C� L �' • : l tle.. D� Co struction:. PostConstruction Test o Rough -in Test ' Test Conditions: . Diate: ' ... .. Floor Area (ft2): . Tine:.. i 0 0. - . Primary. Location of Supp[y.Ductwork. :C. Indoor Temperature (F): —T-7 PrimaryLocation of Return Ductwork W.14. lutdoor Temperature (F): al Leaka-ge Test (Outside) D' Leakage: ❑ Def . t o Prop: Leak Fred On Te t Pressure: (Pa) Ba eline Duct Pressure (optional)," Dulit Press. (Pa) Flow Ring , . "Fan Press Flow (cfm):.: Results: ��;Pass' ❑ Fail ... Installed.' --(Pa). III .... " . Total Leakage' (cfm):. ,... Total Leakage per100 sgft: f GGV� „. - g CFM25 z.100 divided by the CFA Duct Leaks a CEM/100 sgft.. Testing Compilny Company . Name:: Address:; I. heretiy certify t the above Duct Sealing results demonstrate compliance with 5M EditionFBC Energy Conservation requirements in accordance with Sectior 7,e R403 2 Si na lure: I. Pnrite �.c� am/e 1\ Z. I i ;I I " License/Cerfificate #:�d��