HomeMy WebLinkAboutBLOWER DOOR TEST FORMBY
Planning & Deve ropm`le%I Services
1•= = _ _ Building & Code Regulation Division
2300 Virginia Ave, Rm 201
• • I D A Fort Pierce, FL 34982
Phone:772-462-2165 Fax:772-462-6443
BLOWER DOOR TEST FORM
House Infiltration Test Certification
Prescriptive and Performance Method
?F
��F. ✓G� j c�r���a
14c9a 10'
Ic600:11:7
Address:
ruction: () New Construction — Complete ( ) Existing —After Addition
H 'Ouse Infiltration Test Results SLC Climate Zone 2 1�
CF (50) = `c7 5 Q Test Date: to 2 I
Volume
ACTH (50) = CFM (50) x 60 / Volume = Mechanical Ventilation required less than 3 ACH
Pa III Ing results must be & ACH (50) or less (� Pass ( ) Fail
The uilding or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per
hou in Climate Zone 1, 2 and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a
blo r door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in
Secti �n 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105 (3)(f), (g) or (i) or an
appr ved third party. A written report of the results of the test shall be signed by the party conducting the test and
provi ed to the code official. Testing shall be performed at any time after creation of all penetrations of the building
ther 11
p/ envelope.
FBC, Residential
IN I the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a
press 11re of 0.2 inch w. c. (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation
the 4elling unit shall be provided with whole -house mechanical ventilation in accordance with Section M1507.3.
11 Com an /� r (j D7 M \QYnrn08c C—U , ?.S ' '
Comp �
Comp ,i y Name: �i Address:
I here �y certify that the above House Ir�filtration results demonstrate compliance with FBC Energy Conservation
reouir Lentsivaccordance-with Sectidn2402.4.1.2 Climate Zone 2.
Printed I p
a a-Sa r, 7-cz C'kc"cek
� 2�
0&
License ,Certification #: � I IT ��
E
I
•
moo,,.
Planning & Development Services
Building & Code Regulation Division' '
-2300 Virginia Ave, Rm 201 .: RECEIVED
_
Fort Pierce, FL 34982:
772462-2165 Fax 772462 6443 . JU.N . fl 2019
FBC ENERGY CONSERVATION CODE Permitting Departfnont
Duct Sealing Certification St. Wi ie County .
it
%1
Prescriptive and Performance"Method .'
U
Permit#:
I j � � Lot#:...
Co
Ili ... .. �(` -1-(j
tractor:
I
�S . ( ��
Address:. 0((1 C� L �' • : l tle..
D�
Co
struction:. PostConstruction Test
o Rough -in Test '
Test
Conditions:
.
Diate:
' ... ..
Floor Area (ft2): .
Tine:..
i 0 0. -
. Primary. Location of Supp[y.Ductwork. :C.
Indoor
Temperature (F): —T-7
PrimaryLocation of Return Ductwork W.14.
lutdoor Temperature (F):
al Leaka-ge Test (Outside)
D' Leakage: ❑ Def . t o Prop: Leak Fred On
Te t Pressure: (Pa)
Ba eline Duct Pressure (optional),"
Dulit Press. (Pa)
Flow Ring , .
"Fan Press
Flow (cfm):.:
Results: ��;Pass' ❑ Fail
...
Installed.'
--(Pa).
III ....
" .
Total Leakage' (cfm):. ,...
Total Leakage per100 sgft: f GGV�
„.
- g CFM25 z.100 divided by the CFA Duct Leaks a CEM/100 sgft..
Testing
Compilny
Company .
Name::
Address:;
I. heretiy
certify t the above Duct Sealing results
demonstrate compliance with 5M EditionFBC Energy Conservation requirements in accordance with
Sectior
7,e
R403 2
Si na
lure:
I.
Pnrite
�.c�
am/e 1\ Z.
I
i
;I
I "
License/Cerfificate #:�d��