Loading...
HomeMy WebLinkAboutFIELD DENSITY TESTR�CEF -- l O V /9 0 SCANNED MAR 0 b L01a Phone: 954-784-2941 ederal BY Permitting Department E•Fax: 954.784.7875 gineering t. LUdSC®untv St. Lucie County wwwnfaefd -en .com om esting, Inc. r ` • Field Density Tests of Compacted Soils Method D-6938 Project: Proposed Residence Lot 51, Creekside Date: March 6, 2019 Address: 1 8732 Cobblestone Drive, Fort Pierce, FL Order #: 19DR232 Area Tes led: Building Pad Permit Material Type: Dark Brown Sand'with Traces of Rock Tech: Client: D.R. Horton, Inc. Address: 1430 Culver Drive NE Compaction Req.: Palm Bay, FL 32907 Proctor Method: 95% ASTM D-1557 Test # ; TEST LOCATION Probe Depth Elev. Moist % Dry. Density PCF Proctor : Value PCF Optimum Moisture % Compaction Pass 1 NW ,Corner of Building.Pad 12" FL . 10.5 105.3 105.5 1.0.0 99.8% Yes 2 SE Corner of Building Pad 12" FL 11.3 105.1 105.5 10.0 99.6% Yes 3 JI Center of Building Pad 12" FL 9.3 105.0 105.5 10.0 99.5% Yes 4 5 i 6 7 j 8 9 I 10 i 11 12 13 14 Remarks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer ebb t ri i I ii1 t, . This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil earin ` • s $City. "", Legend for bevation: PR = Proofroll 1,2,3 = 1 st, 2nd, 3rd Lift Submitted by: �) o SL = Spring I'ne FL = Final Lift KeitK LeBlanc, P.E:., NO Oti' ig & SG = Subgr'ide BG Below Grade Federal Engineerirresting, Inc* �V a BC = Basec urse BOF = Bottom of Footing Florida Reg. No. 59394a ; 7Tl�TE OF - TOP = Top 8f Pipe FG = Finished Grade Certificate of Authorii anN#5471 ' = As a mutual p 6ecllon to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization'4oc publi�$tionbls et ie�Flehts, conclusions or extracts from or regarding our reports is reserved pending our written approval. A"density test determines the degree of compactlon,o�he ti` led tayer,girl terial only. A density does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below the prdpos'eii'ssrUA,� : - f e results do not precludelor guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying soils wilPsupport the+proposed structure without settlem �t. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying soil to support t e proposed structure. After laying dormant for a period of 9U days or after heavy raintstorms, retesting must be performed on this work. PAGE 1 of 2