HomeMy WebLinkAboutCERTIFICATE OF TERMITE TREATMENTSGAN ED
�M
S ILude, Comb,
Planning & Development Services
Building & Code Regulation Division
2300 Virginia Ave
Fort Pierce, FL 34982
772-462-2172 Fax 772-462-6443
CERTIFICATE OF TERMITE TREATMENT
CONSTRUCTION SOIL TREATMENT
PERMIT #: -'°� JOB ADDRESS: �� -� •��r✓ �/, ��I�
BUILPER/CONTRACTOR: -5; >_eV Sdlp e111a1rj5
PESTI CONTROL CONTRACTOR: EVICT -A -BUG TERMITE & PEST CONTROL INC.
CONTROL LICENSE #: JB175775
We, tpe undersigned, hereby certify that we have pretreated the above described construction for
subterranean termites in accordance with the standards of the National Pest Control Association.
Squa#e feet if area treated:
ntage of solution:.05%
of Treatment: P�U
noting
Treatment
Re -Treat
1st Treatment
Re -Treat
Other
1st Treatment
Re -Treat
Chemicals used: DOMINION 2L
Total gallons used: �_C' C)
Time of Treatment:
�lab�
1s` Treatment
Re -Treat
Pools
1't Treatment
Re -Treat
eri eter for Final Inspection
Siciature of Extefphinator Date
e: There must be a completed form for each required treatment or rg treatment and this form must be on the job
to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection
charged.
C104.2.6 Certificate of Protective Treatment for prevention of termites A weather resistant jobsite posting board
ill be provided to receive duplicate Treatment Certificates as each required protective treatment is completed,
oviding a copy for the person the permit is issued to and another copy for the building permit files The Treatment
tificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area
ated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of
0ective treatment. If the soil chemical barrier method for termite prevention is used, final exterior treatment shall
completed prior to final building approval.
Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on
electrical panel box -cover, listing all the treatments and dates of applications.
7/24/2014