HomeMy WebLinkAboutENERGY EFFICIENCY CODEFORM R405 1017 Y
FLORIDAwakw
ENERGY BEF1' 7 t- *' CODE FOR BUILDING CONSTRUCTION
Florida[! epartment of Business and Professional Regulation - Residential Performance Method
Project Name:,; I CARLTON ADAMS RD
Builder Name:
• Street: Carlton Adams Rd
Permit Office: ST LUCIE COUNTY
City, State, Zip! FORT PIERCE, FL,
Permit Number:
Owner: William J Swain
Jurisdiction: 611000
Design Locati li : FL, ST_LUCIE_CO_INTL
County:: St. Lucie (Florida Climate Zone 2 )
1. New construcl'on or existing New (From Plans)
9. Wall Types (2635.2 sgft.)
Insulation Area
2. Single familyj�r multiple family Single-family
a. Concrete Block - Int Insult, Exterior
R=4.0 2136.80 ftz
b. Frame - Wood, Adjacent
R=13.0 498.33 ftz
3. Number of units, if multiple family 7
c. WA
R= ftz
4. Number of BI Bedrooms 3
d. N/A
R= {{z
10. Ceiling Types (2741.0 sqft.)
Insulation Area
5. Is this a wo t case? No
I
a. Roof Deck (Unvented)
R=20.0 2741.00 ftz
6. Conditionedl'floor area above grade (ftz) 2741
b. N/A
R= ftz
ftz
Conditioned)) floor area below grade (ftz) 0
I,
c. N/A
11. Ducts
R=
R ftz
7. Windows( 1.1 sgft.) Description Area
a. Sup: Attic, Rel Attic, AH: Garage
6 548.2
a. U-Facto �: Dbl, U=0.33 441.07 ftz
SHGC: jl SHGC=0.22
b. U-Facto: N/A ftz
12. Cooling systems
kBtu/hr Efficiency
SH SC:,![
a. Central Unit
47.0 SEER:18.00
c. U-Facto : N/A ftz
r
SHGC I'I
13. Heating systems
kBtulhr Efficiency
d. U-Fac or: N/A ftz
a. Electric Strip Heat
34.0 COP:1.00
SHGCArea We �� hted Average Overhang Depth: 7.500 ft.
Area Weighted Average SHGC: 0.220
14. Hot water systems `
a. Electric
Cap: 40 gallons
8. Floor Types (2741.0 sgft.) Insulation Area
ill
EF: 0.950
a. Slab -On -Grade Edge Insulation R=0.0 2741.00 ftz
b. Conservation features
b. N/A ! R= ftz
None
c. N/A R= ftz
15. Credits
CF, Pstat
Glass/Floor Area: 0.161 Total Proposed Modified Loads: 81.13
PASS
Total Baseline Loads: 89.84
I
I hereby rtify that the plans and specifications covered by
Review of the plans and
��'S1 STg1,
' �0�,
this calc lation are in compliance with the Florida Energy
specifications covered by this
indicates
1+ ,��� • , ``
Code. !
calculation compliance
�O�
with the Florida Energy Code.
Before is
�• krrr% - -fix;;:,,-`����
PREPA ED BY:
DATE:
construction completed
this building will be inspected for
compliance with Section 553.908
I herl certify that this building, as designed, i in compliance
Florida Statutes.
cOD
with th Florida Energy Code.
WE'D
OWN R/AGENT:' �`
BUILDING OFFICIAL:
DATE�I '7 - Z' - Lo f a
DATE:
- Comi
pliance requires certification by the air handler unit manufacturer that the air handler enclosure qualifies as
certified factory -sealed in accordance with R403.3.2.1.
orr - Clance requires an Air Barrier and Insulation Inspection Checklist in accordance with R402.4.1.1 and this project requires an
envel pe leakage test report with envelope leakage no greater than 5.00 ACH50 (R402.4.1.2).
FILE COPY
7/2 /2018 6:25 PM EnergyGauge® USA - FlaRes2017 Section R405.4.1 Compliant Software Page 1 of 5
I
17f1RM Rdns,_7Jin
PROJECT
Title: fj CARLTON ADAMS RD
Building Type: i User
Owner Name: II William J Swain
# of Units: 1
Builder Name*.
Permit Office: ST LUCIE COUNTY
Jurisdiction: 611000
Family Type: Single-family
New/Existing: New (From Plans)
Comment:
Bedrooms: 3
Conditioned Area: 2741
Total Stories: 1
Worst Case: No
Rotate Angle: 0
Cross Ventilation:
Whole House Fan:
Address Type: Street Address
Lot # 9
Block/Subdivision: LUKE'S LOTS
PlatBook:
Street: Carlton Adams Rd
County: St. Lucie
City, State, Zip: FORT PIERCE,
FL,
II
CLIMATE
V Design Location
Design Temp
TMY Site 97.5 % 2.5 %
Int Design Temp Heating Design Daily Temp
Winter Summer Degree Days Moisture Range
FL, S� _LUCIE_CO_INTL
FL VERO_BEACH_MUNI 39 90
70
75 299 58 Medium
JI
BLOCKS
Number
Name
Area Volume
1 Ii
Block1
2741 27410
II
SPACES
Numbed
Name
Area Volume Kitchen Occupants
Bedrooms
InfilID Finished Cooled Heated
1 �I
;I
Main
2741 27410 Yes 5
3
1 Yes Yes Yes
II
FLOORS
#
Floor Type
Space Perimeter R-Value
Area
Tile Wood Carpet
1 Slab -On -Grade Edge Insulatio
Main 274 ft 0
2741 ftz
---- 0 0 1
J;I
ROOF
/
V it #
Roof Gable Roof
Type Materials Area Area Color
Solar
Absor.
SA Emitt Emitt Deck Pitch
Tested Tested Insul. (deg)
II1
Hip
Metal 2889 ftz 0 ftz Unfinishe
0.35
No 0.4 No 20 18.4
II
ATTIC
V I #
Type
Ventilation Vent Ratio (1 in)
Area
RBS IRCC
II 1
Full attic
Unvented 0 2741 ftz
N N
II
CEILING
N #
Ceiling Type
Space R-Value Ins Type Area Framing Frac Truss Type
1
III
Under Attic (Unvented)
Main 0.3000000119209 Blown
2741 ftz 0.16 Wood
I
i
7/ 15/2018 6:25 PM
!�I
EnergyGaugeO USA - FlaRes2017 Section R405.4.1 Compliant Software
Page 2 of 5
i
r^nnn r3enc rfr1A7
I VI\IVI I�-rvv-c.v yi
•
III
WALLS
Adjacent
Cavity Width Height
Sheathing
Framing
Solar
Below
Space
_alue Et
In Ft
In
Area
R
a
1
N
I Exterior
Concrete Block - Int Insul
Main
4 35.6
10
356.0 ftz
0
0
0.75
0
_ 2
N
Exterior
Concrete Block - Int Insul
Main
4 48
6 10
485.0 ft'
0
0.75
0
3
E
Exterior
Concrete Block - Int Insul
Main
4 17
6 10
175.0 ftz
0
0.75
0
4
E
Garage
Frame - Wood
Main
13 25
8 10
256.7 ftz
0
0.75
0
5
S
Garage
Frame - Wood
Main
13 24
2 10
241.7 ftz
0
0.75
0
6
S
Exterior
Concrete Block - Int Insul
Main
4 35
10
350.0 ftz
0
0.75
0
_ 7
S
Exterior
Concrete Block - Int Insul
Main
4 22
8 10
226.7 ftz
0
0.75
0
_ 8
W
Exterior
Concrete Block - Int Insul
Main
4 44
5 10
444.2 ftz
0
0.75
0
9
W
Exterior
Concrete Block - Int Insul
Main
4 10
10
100.0 ftz
0
0.75
0
.III
DOORS
#
Omt
Door Type
Space
Storms
U-Value
Width
Height
Area
it
Ft
In
Ft In
1
N
Insulated
Main
None
.4
3
8
24 ftz
2
E
Wood
Main
None
.21
3
8
24 ftz
3
S
Wood
Main
None
.21
3
8
24 ftz
41
E
Insulated
Main
None
.4
2
6
8
20 ftz
WINDOWS
III
Orientation shown is the entered, Proposed orientation.
Overhang
oilWall
#,,
Omt ID
Frame Panes
NFRC
U-Factor SHGC
Imp
Area
Depth
Separation
Int Shade
Screening
1 1
N 1
Vinyl Low-E Double
Yes
0.33 0.22
Y
39.1 ftz
2 ft 0 in
1 ft 0 in
None
None
2
N 2
Vinyl Low-E Double
Yes
0.33 0.22
Y
96.0 ftz
8 ft 0 in
1 ft 0 in
None
None
3
N 2
Vinyl Low-E Double
Yes
0.33 0.22
Y
21.3 ftz
8 ft 0 in
1 ft 0 in
None
None
4J
N 2
Vinyl Low-E Double
Yes
0.33 0.22
Y
39.1 ftz
8 It 0 in
1 ft 0 in
None
None
1'
E 3
Vinyl Low-E Double
Yes
0.33 0.22
Y
32.4 ftz
2 ft 0 in
1 ft 0 in
None
None
S 6
Vinyl Low-E Double
Yes
0.33 0.22
Y
6.9 ftz
2 ft 0 in
1 ft 0 in
None
None
fl
S 6
Vinyl Low-E Double
Yes
0.33 0.22
Y
32.4 ft'
2 ft 0 in
1 ft 0 in
None
None
S 6
Vinyl Low-E Double
Yes
0.33 0.22
N
18.4 ftz
2 ft 0 in
1 ft 0 in
None
None
I9
S 7
Vinyl Low-E Double
Yes
0.33 0.22
Y
84.0 ftz
12 ft 0 in
1 ft 0 in
None
None
0
W 8
Vinyl Low-E Double
Yes
0.33 0.22
Y
6.9 ftz
2 ft 0 in
1 ft 0 in
None
None
1
W 8
Vinyl Low-E Double
Yes
0.33 0.22
Y
32.4 ftz
2 ft 0 in
1 ft 0 in
None
None
2
i
W 9
Vinyl Low-E Double
Yes
0.33 0.22
Y
32.4 ftz
22 ft 0 in
1 ft 0 in
None
None
GARAGE
11 #
Floor Area Ceiling Area
Exposed Wall Perimeter
Avg. Wall Height
Exposed Wall Insulation
1
890.34 ftz 890.34 ftz
64 It
loft
1
8 6:25 PM EnergyGaugeO USA - FlaRes2017 Section R405.4.1 Compliant Software Page 3 of 5
of
rnDnn DA0G_')r117
INFILTRATION
F#ICI
Scope Method
SLA
CFM 50 ELA EgLA ACH ACH 50
1 . Wholehouse ! Proposed ACH(50)
.000318
2284.2 125.4 235.83 .2383 5
II
HEATING SYSTEM
# JSystem Type
Subtype
Efficiency Capacity
Block
Ducts
1 IlElectric Strip Heat/
None
COPI 34 kBtu/hr
1
sys#1
li
COOLING SYSTEM
# System Type
Subtype
Efficiency Capacity Air Flow SHR
Block
Ducts
1 I Central Unit/
None
SEER: 18 47 kBtu/hr 1410 cfm 0.75
1
sys#1
II
HOT WATER SYSTEM
# System Type SubType
Location
EF Cap Use SetPnt Conservation
1 II Electric None
Garage
0.95 40 gal 60 gal 120 deg
None
II
SOLAR HOT WATER SYSTEM
F EC
Cert # Company Name
Collector Storage
System Model # Collector Model # Area Volume
FEF
one None
III
ftz
lil
DUCTS
Supply —
V Location R-Value Area
— Return— Air CFM 25 CFM25
Location Area Leakage Type Handler TOT OUT QN
RLF
HVAC #
Heat Cool
I11 Attic 6 548.2 ft
Attic
137.05 f Default Leakage Garage (Default) (Default)
1 1
I;I
TEMPERATURES
Program 16le Thermostat: Y
Cooling Jan Feb Mar
Heating Jan Feb Mar
Venting �
Ceiling Fans:
Apr May X Jun rl Jul rl Aug X Sep Oct
Apr May Jun Jul Aug Sep Oct
Nov
Nov
j j Dec
4X]] Dec
8 6:25 PM EnergyGauge® USA - FlaRes2017 Section R405.4.1 Compliant Software Page 4 of 5
FORM R405-20VI
Thermostat Schedule:
HERS 2006
Reference
Hours
Sehedule Type I
1
2
3
4
5
6
7
8
9
10
11
12
Cooling (WD)
i
AM
PM
78
80
78
80
78
78
78
78
78
78
78
78
78
78
78
78
80
78
80
78
80
78
80
78
Cooling (WEH)
AM
PM
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
78
jieating (VVD)
PM
68
68
68
66 68
68
68
68
68
68
68
66
66
Heating (WEH) j
AM
PM
66
68
66
68
66
68
66
68
66
68
68
68
68
68
68
68
68
68
68
68
68
66
68
66
8 6:25 PM EnergyGauge® USA - FlaRes2017 Section R405.4.1 Compliant Software Page 5 of 5
FORM R405-2 1 17
• ENERGY PERFORMANCE LEVEL (EPL)
DISPLAY CARD
ESTIMATED ENERGY PERFORMANCE INDEX* = 90
The lower the EnergyPerformance Index, the more efficient the home.
Carlton Adams Rd, FORT PIERCE, FL,
1. New constructJ l'on or musting
New (From Plans) 9. Wall Types
Insulation Area
2. Single family or multiple family
Single-family a. Concrete Block - Int Insul, Exterior
b. Frame - Wood, Adjacent
R=4.0 2136.80 ftz
R=13.0 498.33 ftz
3. Number of u(�its, if multiple family
1 c. N/A
R= ftz
4. Number of Bedrooms
3 d. N/A
10. Ceiling Types
R= ftz
Insulation Area
5. Is this a wort case?
No a. Roof Deck (Unvented)
b. N/A
R=20.0 2741.00 ftz
R= ftz
6. Conditioned1l1floor area (ftz)
7. Windows" J;1 Description
"
2741
Area c. N/A
11. Ducts
R= �
R
a. U-Facto Dbl, U=0.33
441.07 ftz a. Sup: Attic, Ret: Attic, AH: Garage
6 548.2
SHGC: a SHGC=0.22
b. U-Facto : N/A
SHGC: J;
ftz
12. Cooling systems
kBtu/hr Efficiency
c. U-Factor: N/A
ftz a. Central Unit
47.0 SEER:18.00
SHGC:
d. U-Fact r: N/A
ftz 13. Heating systems
kBtu/hr Efficiency
SHGCII
Area Weighted Average Overhang Depth:
a. Electric Strip Heat
7.500 ft.
34.0 COP:1.00
Area Weighted Average SHGC:
0.220
8. Floor T III
y
Insulation Insulation Area 14. Hot water systems
Cap: 40 gallons
lips
a. Slab-O -Grade Edge Insulation
R=0.0 2741.00 ftz a. Electric
EF: 0.95
b. N/A
R= ftz
b. Conservation features
c. N/A
R= ftz
None
15. Credits
CF, Pstat
I certify that this home has complied with the Florida Energy Efficiency Code for Building
STgTF
Construction through the above energy saving features which will be installed (or exceeded)
OTIIE
y
in this ho01 Is before final inspection.
Otherwise, a new EPL Display Card will be completed,,,,
based or�l installed Code complia
Builder S'gnature: Date:
*�.
Address b
it f New Home: �2��.
^ City/FL Zip:
�U� �� ��►,��
coD�.��
: This is not a Building Energy Rating. If your Index is below 70, your home may qualify for energy efficient
age (EEM) incentives if you obtain a Florida EnergyGauge Rating. Email EnergyGauge tech support at
upport@energygauge.com or see the EnergyGauge web site at energygauge.com for information and a list of
ed Raters. For information about the Florida Building Code, Energy Conservation, contact the Florida Building
nission's support staff.
required by Section R303.1.3 of the Florida Building Code, Energy Conservation, if not DEFAULT.
8 6:26 PM EnergyGauge® USA - FlaRes2017 - Section R405.4.1 Compliant Software Page 1 of 1
FORM
7 Envelope Leakage Test Report Performance
FLORIDA ENERGY EFFICIENCY CODE
FOR BUILDING CONSTRUCTION
Envelope Leakage Test Report
Performance Method
Project Name:
CARLTON ADAMS RD
Builder Name:
Street:
Carlton Adams Rd
Permit Office: ST LUCIE COUNTY
City, State, Zip:
FORT PIERCE, FL,
Permit Number:
Design Locations
FL, ST_LUCIE_CO_INTL
Jurisdiction: 611000
Cond. Floor Area::
2741 sq.ft.
Cond. Volume: 27410 cu ft.
Envelope Leakage Test Results
Regression�i Data:
C: I: n: R:
Sinale or M Iti Point Test Data
HOUSE PRESSURE
FLOW:
1
1' Pa
cfm
2
Pa
cfm
3
Pa
cfm
4
Pa
cfm
5
Pa
cfm
6 'I
Pa
cfm
Leakage Characteristics
Required ACH(50) from
FORM R405-2017 :
Tested ACH(50) * :
*Tested leakage must be less than or equal to the
required ACH(50) shown on Form R405-2017 for
this building. If the tested ACH(50) is less than 3
the building must have a mechanical ventilation
system.
R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in
Climate Zones 1 and 2 ... Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either
individuals defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(0(g), or (i) or an approved
third party.P written report of the results of the test shall be signed by the party conducting the test and provided to the code official., Testing shall be
performed f�a�t any time after creation of all penetrations of the building thermal envelope.
Durir.9 testing:
Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weatherstripping or other
infiltration control measures;
Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration
control measures;
Interior doors, if installed at the time of the test, shall be open;
Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed;
Heating and cooling systems, if installed at the time of the test, shall be turned off; and
Supply and return registers, if installed at the time of the test, shall be fully open.
I hereby certify that the above envelope leakage
perfo ance results demonstrate compliance
with FI �i rida Energy Code requirements in
accorJ'ance with Section R402.4.1.2.
PRINTED NAME:
Testing shall be conducted by either
individuals as defined in Section
553.993(5) or (7), Florida Statutes or
individuals licensed as set forth in
Section 489.105(3)(0(g), or (i) or an
approved third party. A written report of
the results of the test shall be signed
by the third party conducting the test
and provided to the code official.
J I BUILDING OFFICIAL:
DAT II DATE:
ADD '4 ,B111
8 6:26 PM EnergyGauge® USA - FlaRes2017 - Section R405.4.1 Compliant Software Page 1 of 1
. Wri htsaft' Project Summary
Entire ,House
DiFrancesco Construction
For:
Notes:
CARLTON ADAMS RD, William J Swain
Carlton Adams Rd, Fort Pierce, FI
Weather:
Winter Design Conditions
e db 42 OF
db 70 OF
I TD 28 OF
Heating Summary
'e
32219
Btuh
6516
Btuh
vent (0 cfm)
0
Btuh
e
ication
0
Btuh
0
Btuh
ent load
38735
Btuh
Infiltration
quality
Fort Pierce, FL, US
Simplified
Average
0
Heatingg
Coolingg
2730
a (ft�
2730
ume (fl3)
31293
31293
changes/hour
0.32
0.16
aiv. AVF (cfm)
167
83
Heating Equipment Summary
ref
Heating output
Temperature rise
Actual air flow
Air flow factor
Static pressure
Space thermostat
Calculations
100 EFF
10.8 kW
36943 Btuh
50 OF
672 cfm
0.017 cfm/Btuh
0 in H2O
Job:
Date: Jul 18, 2018
By:
Summer Design Conditions
Outside db
90
OF
Inside db
75
OF
Design TD
15
OF
Daily range
L
Relative humidity
50
%
Moisture difference
61
gr/lb
Sensible Cooling Equipment
Load Sizing
Structure
25937
Btuh
Ducts
4700
Btuh
Central vent (99 cfm)
3267
Btuh
Ventilating dehumidifier
Blower
1707
Btuh
Use manufacturer's data n
Rate/swing multiplier 0.95
Equipment sensible load 33830 Btuh
Latent Cooling Equipment Load Sizing
Structure 4286 Btuh
Ducts 3933 Btuh
Central vent (99 cfm) 3129 Btuh
Ventilating dehumidifier
Equipment latent load 11349 Btuh
Equipment total load 45179 Btuh
Req. total capacity at 0.75 SHR 3.8 ton
Cooling Equipment Summary,
Make Trane
Trade TRANE
Cond 4TTV804BAl
Coil TAM9A0C48V41
AHRI ref 10093700
Efficiency 13.0 EER, 18 SEER
Sensible cooling 35250 Btuh
Latent cooling 11750 Btuh
Total cooling 47000 Btuh
Actual air flow 1567 cfm
Air flow factor 0.051 cfm/Btuh
Static pressure 0.10 in H2O
Load sensible hegt tio 0.76
FILE COPY
ACCA to meet all requirements of Manual J 8th Ed.
I 2018-Jul 2517:13:00
-�- wrightsoft' Rightsufte@ universal 201717.0.17 RSU06570 Page 1
EATransferWanual JICARLTON RD-SWAIN.rup Calc = MJ8 Front Door faces: N
I
I
' wrigh oft."
I
I
I
Right-M Worksheet
Entire House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
II
Room name
Entire House
laundry
2
Exposed Nvall
274.0ft
22.0 ft
3
Room height
11.5 ft
10.0 It heat/cool
4
Room di ensions
8.0 x 14.0 R
5
Roomara
2730.0ft2
112.Oft2
Ty
iConstruction
U-value
Or
I
HTM
I
Area (ft2)
I
Load
I
Area (ft)
Load
number
(Btuhlft2-
(Btuh/ff)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
l�
6
4 flocs
01
ri
4.
2 5
61
0'
247
131
= 1571
- p
0._.-
-
0
0
0
0
'. 0
,10D-¢
0
0.47
n
n,
13.
13:1
9.
16:
101,
" 126
.. 0
,,
0
=, 0
I
42ov
0.4
n'
13:1
" 16.
1,
01
211
2
0
0
0
• 0
11
'D
1Po
0.2
.
n"
S.t
_ 8.4
;2
,, . 2
. " 1
2
„ _ . 0
0-
0
W
2C-0sw
0.09
2.5
. -. 2.1
2
2
6
5_
1
14C,
35
3
13A flocs °
0.1
.e_•
a
4:0
2:.
2
2
9
57
-2
9
61'
G
�D
9.47
a
13.1
45.
3
137
2
0
0
0
14A4-2ov,
(fIPO
0.2
e
8.1
8:4.
2
2
1
2
2
195
202
2C-0sw
0.09
. ,'
s
2.
2,1
2
22
57
1
2_
0
0
0
0
0
0
0
0
D
1P0
93A flocs "
0.2
0.1
s,
a,
8.1
.. 4.
8.4
2.
2?
51
204
129
- 8
7
2
9 86
G
10D�;
0.
s'
13:7
9:
131
,, 9
0'
• D,'
.. 0
0
4A42o4 ;.
0 47
s
13.1
16_
91
11
7
91
11'
4A42ov
; 0 47
13.1
16.41
1
2
.. 31
0
0
° 0
14A42ov
1100
6.47
0.2
,s':
s
s.,
13.1
8:1
•16:
8:4
21.
3
21
1
17
'0
0
0
0
0
0
0
D
flocs
0.1
w
4.
2.
4
<.=
189
1
_-
0
0
0
0
1�1 11'�l
4A4-2ov
0.47
w
13.1
43.3
7
1
91
3
0
0
0
L�-p1
G
4A4-2ov
0.4
w
13.1
45.,
_• 7
275
0
0
- . 0
C
16X19 Omd
0.
- :
1.5
1:
2
2
: 4b5
, ".: 11
11
y
166
F
22A4ol
0.9
-
27.
0,
2
27
758
11
22
60E
0
6
c) I ED excursion
3
88
Eq�elope loss/gain
270
1934
1
162
82
12
a)III Infiltration
513(
137E
39E
106
b),! Room ventilation
0
0
0
0
13
I lemal gains: Occupants @ 230
4
92
0
0
I'� Appliances/other
4300
5
4btotal
(lines 6 to 13)
322111
2593.1
202d
1431
III external load
0
0
0
Less transfer
0
0
0
0
edistribution
0
0
0
0
14
bbtotal
3221
25931
202
1431
15
d,,uct loads
200
18%
651
470
20°
18%
40E
2
tal room load
1tl�r
,
I
`
I 243
16
I
I required (cfm)
67
1561
81
wrightSoft- RightSuit @ Llniversal 201717.0.17 RSU06570
E:\TransfL-r\ManualJXCARLTONRD-SWAIN.rup Calc = MJ8 Front Door faces:
2018Jul-2517.13:00
Page 1
i
wrigh oft,
�I
I
I I
Right-JO Worksheet
Enure House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
2
3
4
5
Room name
Exposed vrall
Room height
Roomdir�,ensions
Room area
breakfast
20.0 ft
10.0 ft heat/cool
10.0 x 14.0 ft
140.0 ftz
kitchen
0 ft
16.0 ft heat/cool
13.0 x 17.0 it
221.0 ftz
Ty
Construction
Number
U value
(Btuhift2-°
Or
I
HTM
(Btuh/ft) I
Area (ftz)
or perimeter (ft) I
Load
(Btuh) I
Area (fP)
or perimeter (ft) I
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6:
11
13A flocs
�'M-v'
4A42ov
4A4-2ov
11PO
12C-0syv
'4A4-2 v
'�11P0 .
11P0
13A-flocs
11OD-v
4A42ov
4A4-2ov
4A4-2ov
11p0
13A-4ocs
4A4-2ov
4A4 2ov
16X19-0md
22A-tal
0.1
0.
0,4
0,47
0.
0.09
0.1
0.47
0.2
0.09
_02
0.1
0.
0.47
0.4
0.47
02
0.1
0.47
0.4
0.
0.9
n
n
n
n
n
e,
a
a
a"`
s
s
s
5
s',
s
s
s
w
w
-w,
-
4.0
13,
13.1
13.1
8.1
2.5
4.
-,13:1
8:1
2.
$.1
4.
13:
13.1
13.1
13.1
8.1
4.0
13.1
13.1
1.5
27,
2,
9:
16,
16.
8.4
2.1
Z
45.
8.4
2.1
14
2
9:
16.
.16.
16.
8.4
2.5
43.
45,
M
0,
0
0
0
0
:
0
0
1
1
0
3.
1
1
0
0
0
0
0
0
7
0
0
3
0
7
4
1
2
0
0
0
0.
0
0_
2
0
0
0
2
0
2
0
0
0_
0
0
17
0
17
0
137
2
0
0
.0
0
0'
0
0
0
0
0
0
0
0
0
221
221
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
_ 0
221
0
0
0
0.
0,
0
0
'' _ 0
0
0
0
0
0
0
0
0
0
0.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
32
D
D
W
,i3A-4ocs
G
p
�12C-0sw
D
G
D
C
F
6
c)l I AED excursion
51
135
4"rvelope loss/gain
2124
2.944
1
1 35d
193
12
�ti Infiltration
b) Room ventilation
361
0
9
0
0
0
0
0
13
1 emal gains: Occupants @ 230
Appliances/other
0
0
0
0
0
200
Pubtotal (lines 6 to 13)
248
35C
219
}Iess external load
0
0
0
0
Less transfer
0
0
0
0
14
15
lRedistribution
ubtotal
loads
201A
18%
0
2487
5
0
3
551
201A
18%
17
36
7
15
220
II
load
I!�Airtal rrequmomi d (cfm)
I
2�5?
18
I
I 1
133
2018Jul-2517,13:00
Page 2
wrightsoft' Rig"u'MI lhiversal 201717.0.17 RSU06570
E:1TransferWlanual J\CARLTON RDSWAIN.rup Calc = MJ8 Front Door faces:
wri h u oft•
Right-JO Worksheet
Entire House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
Room name
pantry
studio
2
Exposed wall
7.0 It
45.0 ft
3
Room height
10.0 ft heat/cool
10.0 ft heat/cool
4
Room dimensions
8.0 x 10.0 ft
16.0 x 18.0 ft
5
Room area
80.0 ft2
288.0 ft2
Ty
Construction
U-value
Or I
HTM I
Area (ft2) I
Load I
Area (ft2) I
Load
umber
(Btuhfff-
(Btuhtft2)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
NIPS
Heat
Cool
Gross
N!P/S
Heat
Cool
6
IPA 4ocs
0.1
n
4.
2.
0
0
0
1
1
641
rl
40
�OD-v
0.4
n
13.
9..
0
0
0
0'
0
0
0
0
0
4A4-2ov
0:4
n
13.1
16..
!�A42ov
6A
n
13.1
16.
0
0
0
0
D
11
1P0
'02
n
8.1
8.4
0..
0
0
,. ,0
0
W
2C-0stnr
0.09
e.
2.5
2.1
7
7
17
1
0
0
0
0
3A flocs
0,1
a
4.
2.
'
0
0
9
1
601
137
G
4A4.2ov :
0.4
a
13.1
45.
0
f
D
11P0
0.2
8.1
8.4
0
0
.
0
_ 0
�:�
2C-0sw
0,09
.'e'
s
2.
2.1
0
0
0
0
0.
11
0
11
0_
2
0
2
0
D
1P0
02
s
8.1
'
6.4
0
0
0
- G
13A-4ocs
10Dar
0.1
0.
s
s
, 4.
13.
2.
9:.
0
0.
0
0
10
0
4A4-2ov
0.47
s
13.1
.16:'
0
0
0
0
0
0
4A42ov
D.47
s
13.1
16.
0
0
0
0.
0
AM
0:47
s
13.1
16:
0
0
0
0
0'
0
0
11P0
0.2
s
8.1
8.4
0
0
0
0-
0-
0
0
D
13A-4ocs
0.1
w
4.0
2.5
0
0
0
0
0
4A4-2ov
0.47
w
13.1
43.
0
0
0
0
0
0
0
L G
C
4A4-2ov
16X19-0md
0.4
0.,
w
13.1
1.5
45.
Il
8
0
12
0
11
2
0
2
0
45
0
42
F
22A-tnl
0.9
-
27.
0.
8C
7
194
0,
2
124E
0
61
c),"AED excursion
18
S1
Ep"velope loss/gain
49j
254
1
1 361
2781
12
a I Infiltration
12
813
218
b Room ventilation
0
0
0
0
13
Iremal gains: Occupants @ 230
0
0
1
2
Appliances/other
0
0
Subtotal (lines 6 to 13)
62E
28E
443
322
tess external load
0
0
0
0
Less transfer
0
0
0
0
Oedistribution
17
15
45E
2
14
$subtotal
3
15
loads
201A
18%
13C
5
209A
18%
9M
62
room load
I
1
421
II
IDuct
,�iotal
rrrequi required (cfm)
I
I
I
1
1021
wrightsOft- RightSu'rte®lhiversal 201717.0.17 ISUC6570
E:\TransferWlanual J\CARLTON RDSWAIN.rup Calc= MJ8 Front Doorfaces:
2018Jul-2517:13:00
Page 3
- - wrigh ®ft"
I
Right-J® Worksheet
Enure House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
01
o ��I
en
bath
2
3
Exposed viae11
Room height
1 0 ft
10.0 It heat/cool
9.0 ft
10.0 It heat/cool
4
Room dsi16sions
5.0 x 5.0 ft
9.0 x 5.0 ft
5
Room area
25.0 f:2
45.0 ft2
Ty
Construction
U-value
Or
I
HTM
I
Area (fi=)
I
Load
I
Area (ft=)
Load
umber
(Btuh/ft'-°
(StuhJUI)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
NIP/S
He
Cool
Gross
N/P/S
Heat
Cool
6
'13A-4ocs,
0.1
, 'm
4..
2.5
0
.
1)
0
O
0
" 0
. .. ' 0
0
�4 2ov
:0,
0.47
n
n
'n
13.
13:1
9:
16.
0
: 0
0
0'
0
0.
:
0
0
0
, y ..
. 0',
0
' 0
0
11
4 2oV
0.4
0
n
13.1
6.1
16, _
8.4:
0
0
,'
0
0
0-
..
0.
0'
0
D
W
�1P0
2C-0sw
0.09
a,
2.
2.1
50
5C
127
11
0
0
, 0
Vj1
1--G
3A flocs
k42ov
0.1
0.47
a
a
4.0
13.1
2:
45:
p
0
0-
0
0
0
D
0
0
0
0
0
0.
0
0
0
L-D
1P0
:• 0.2
a
8.1
8.4.
D
0
0
0
0
0
D
j2C-0sw
1P0
0.09
02
s
s-
2.
8.1
2.1
8.4
5
21
2
24.
6
19E
5
2
9
0,
2
0
19
0
G
G
3A-0ocs
MOD v.
0,1
0.
s
8,
4.0
13
2.
9
0
0.
0'
0
0
0
.. 0,
0
1 0,
0
-0
0
0
'
4 2ov:
0.47
s.
13.1
16.
0
0
0
0
..
A42ov,,
0.47
. s
13.1
16.
0
:' 0
0
0
0;
0
A42oV -
0,47
s,
13.1
16'
0'
0
0
0
0
0
0
0
0.2
a
8.1
8:4
0
0-
0
0
,0
0.
.. 0
0
D111P0.
13A flocs
0.1
w
4.0
2.5
0
0
0
0
0
0
0
4A4-2ov
0,47
w
13.1
43.
0
0
0
0
0
0
G
4A4-2ov.
0.47
w
13.1
45.
0,,
0
0
0
0
0
0
C
16X19 0md'
0:4
-,
-'
1.5
_ a .1:4
2
2
:' ,3
.,
4
7]
6
F -.
I
22A-tpl
0.
-
27.
0,
2E
2T
0
_4,9
24c
0
6
I
c) � ED excursion
-2
-18
111 ErWelope loss/gain
7
37
5
2
12
a) it Infiltration
181
4E
163
44
b) Room ventilation
0
0
0
0
13
1 Ili mal gains: Occupants @ 230
0
0
0
0
Appliances/other
0
0
Subtotal (lines 6 to 13)
8SE
42
713
2
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
-88
-42
47E
24
14
S44°btotal
0
0
1188
53
15
at loads
200
181%
0
0
20°
18°%
24C
96
Total room load
I
I
I
I
I 142
�
63Z�
1
r f n)
I required (c
OI
OI
25
AA- wrightisoft- RightSuite® Universal 201717.0.17 RSLM6570
E:1Transfer\Nlanual J\CARLTON RDSWAIN.rup Calc = MJ8 Front Door faces:
2018Jul-251T13:00
Page 4
-P�- wrigh oft
Right-M Worksheet
Enure House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
Room name
guest/study
h
2
Exposed vVall
17.0 ft
0 ft
3
Room height
10.0 ft heat(cool
10.0 ft heatIcool
4
Room din?ensions
W.0 x 14.0 ft
17.0 x 4.0 R
5
Room area
238.0 ft'
68.0 ft2
Ty
Construction
u-value
Or
I
HTM
I
Area OF)
I
Load
I
Area OF)
I
Load
(Btuh/fN-
(Btuh/ft)
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
Inumber
'I
6
VI
I3A-4ocs
0.1
n
4.0
2.
17
1
' 311
0
0
0
OD-v
0.4
n
13..
9,
0
4
0
0
0
4A4-2ov
0.47
n
13A
16.
0
01'
0
4Ad 2ov
0.4
n
13.1
16.
0
0
0
0.
0
0
041P0
11
0:2
n
8.1
8.4.
0
0
0
0_
0
0
0
W
12C-0sw
0.09
a
2.5
4.0
2.1
0
0
0
0
0
0
0
0
0
0
0
011
0
0
G
�(A3A flocs
4 2ov
0.1
0.4
a
a
13.1
2,
45.
0
0
0
0
0
0
0
0
D
t
�1P0
0sw
0.2
0.0,9
a
s
8.1
2,
8:4
2.1
0
0
0
0
0
0
0
0
0
�12C
'i1P0
I13A-flocs
02
s.
8.1
8.4
0,
_. 0
0
0
0
0
D
0.1
s
4.
2,
0
0
0
G
i�10D v
0.
s,
13:
9.
0
0
0
0--
= 0
0
4A4-2ov
0.47
s
13.1
16:
0
0
0
A4-2ov
0.47
s
13.1
1&
0
0
0
0
4A4-2ov
0.47
s
13A
16.
0'
0
0
0
0
0
0
D
11P0
0.2
s
8.1
.. 8.411
0
0
0
0
0
0
0
0
13A-4ocs
4A4-2ov
0.1
0.47
w
w
4.
13,1
2.5
43.
0
0
0
0
0
0
0
0
0
0
0
G
4A4-2ov
0.4
w
13.1
45.
0
0
0
0
0
0
0
0
C
16X190nd
0.
-
1'.5
1:
2
3
6
.108
101
F
22A-tnl
0.9
-
27.65
0.03
23E
17
471
0
6E
0
0
0
6
c) RED excursion
E4elope loss/gain
1994
105
108
95
12
a)"I Infiltration
30
82
0
0
b)II Room ventilation
0
0
0
0
13
Irrtemal gains: Occupants @ 230
1
2
0
0
Appliancestother
0
0
IINII
SlUbtotel (lines 6 to 13)
2
136
108
95
Less external load
0
0
0
0
Less transfer
0
0
0
0
Redistribution
54
4E
-10
-95
14
66btotal
235
1412
0
0
15
Ouct loads
201A
18%
4T
25E
200
18%
0
0
l ttal room load
283118q
I
r required (cfm)
'^l
0,
0f
wrightsaft- RightSuite@ Universal 201717,0.17 RSU06570
E:\Transfer\Manual JICARLTON RDSWAIN.rup Calc= MJ8 Front Doorfaces:
2018Jul-2517:13:00
Page 5
i
wrlgh � oft'
I
Right,J® Worksheet
Entire House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
Room n.14
I
din/entry
2
3
Exposed II
Room hell t
0 ft
10.0 ft heattcool
19.0 ft
10.0 ft heat/cool
4
Room dissensions
8.0 x 2.0 ft
1.0 x 236.0 d
5
Room areo
16.0 ft2
238.0 ft2
Ty
III
c
Constrution
U-value
Or
I
HTM
I
Area OF)
I
Load
I
Area (ft2)
I
Load
umber
(Btuhtft'-°
(Btuh/fts
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat I
Cool
6
IIil
13A flocs
0.1
n'.
4t0
2
0
0
0'
0'
0
1
11
44
0
2'
0
1Dv
4Q4 2ov
0.4
0:47
n'
n
13:_
... 13:1
9:
6.
�'l
0",0
0
'v
-
0:4
n
13:1
6.
0
1
0
211
264
D.
11
1P0
02
n
8.1
:' 6.4
2
.. 2
_ 1
202
W
2C-0sw
0.09
e.
2.5
_ 2.1
0
0
0
0
0
G
PA,
PA,
01
0.4
0.2
a
a
4.
13.1
8.1
2.
45.
8.4
0
0
0
0
0
0
0
0
0
0
0
0
0
.0
0
0
`" 0
D
.,�0�
�1P0
0.09
a
s
2.
2.1
0
0
0,
0.
0
0
0
0
D
3A-floss
0.2
0.1
s
s
8.1
4.
8.4
2:
0
:'
0
0
0
• 0
0
0
ODv
0.
s,;
13,
9.
0
0,
0
0
0
2ov
0.47
s.
13.1
16.
0
0
0
0
0
0
4 2ov '
0.47
s,
13:1
16.
0
0
0
4A4-2ov ' '
11P0
0.47
0.2
s
s
13.1
8.1
16.
8.4
0
0
.0
0
0
0
0
•. 0•
0
0
0
0
0
0
D
I�
0.1
w
4.
2.
.:
0
0
0
0
0
0
0
"2ov
�3A4-2ov
0,47
w
13.1
43.
0
0
0
0
0
G
�1A4-2oy
0.47
13.1
45.
0.
0
0
0
_ 0
0
0
C
_ .. ,
j�i6X194nd'
0.
..w
. 1`.5
1.
16
1
2
2.
": " 2
3
F
2A-tDl
0..
-
27,
0,
1
2
1
0
6
III'
c) AED excursion
1
106
Envelope loss/gain
2
2
1
1 22611
1
12
a) Infiltration
0
0
342
92
b)II Room ventilation
0
0
0
0
13
IntIIi'nal gains: Occupants @ 230
0
0
0
0
II Appliancestother
0
0
s4total (lines 6 to 13)
2E
22
2
172
L4.' external load
0
0
0
0
Le ° transfer
0
0
0
0
Ret�istribution
-2
-22
0
0
14
S &otal
0
0
260
172
15
D� tloads
20°
18%
0
0
20°
18%
52
312
Total room load
001
I
1 3154I
2o34
I
I AiHrequired (cfm)
,
I
01
104
wrigh i s®ftt- RightSuite@ Lhiversal 201717.0.17 MU06570
E.1TransferXManual JICARLTON RDSWAIN.rup Calc = MJS Front Door faces:
2018Jul-2517:13:00
Page 6
I
f - wrigh oW
Right-JO Worksheet
Enure House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
Room nary
great rm
We
2
3
Exposed v"1II
Room height
17.0 ft
16.0 ft heat/cool
0 ft
10.0 ft heat/cool
4
Room dimgns-MM
1.0 x 444.5 It
1.0 x 88.0 ft
5
Room arey l
444.5 ft2
88.0 ft,
Ty
Construction
U-value
Or
I
HTM
I
Area (ft)
I
Load
I
Area (ft=)
I
Load
ber
(Btuh/ff-°
(BtuhM
or perimeter (ft)
(Btuh)
or perimeter (ft)
(Btuh)
Heat
Cool
Gross
N/P/S
Heat I
Cool
Gross
N/P/S
Heat
Cool
trr
6
13P 4dcs
0.1
n
4'.
,2
0'
0
.. 0-
.. 0
0
0
1 Dv
0.4
n
1$.
9.
0
0
0.
0
2ov
0:47
.n
,3:1
16.
0
0
0
0;
0
4-2ov
0.4
n
13.1
16.
0
0-
0
0
'D
11
11 P0.
0.2
n
8.1
8.4
_
D
0
0
0
0
0
W
1 sw
1C�A flocs
., . • 0.09
01
e .
a
2.
4.0
2.1
2:..
- .
0'
- 01
0
0
0
0
0
0
G
4b,4-2ov
0.4
a
13:1
45.
0
0
0
0
0
D IPO ,'
0.2
a
8.1
8:4
0
D'
0
0
0
0.09
s
2.
2.1
0
0
0
0
0
0
�2C4Qsw
D (IPO
0.2
s
8.1
8.4
0
0.
0
0
0
0
0
0
G
'SBA -flocs '
,ibD,v
0.1
O.
s
s
4.
13.
2.
9;
2
47
9
7
131
9
0
0.
0.
0
0
0
0
0
�A4 2ov
0.47
s
13.1
:
16:
0
0
0
0
0
0
0
A42ov
<` 02
$
18.1
16.
0
0
0
0
-
0
0
A46
0.47
s'
13.1
16:
0
0
0
0
0
- 0
0
0
D iP0
0:2
s
8:1
8:4
p
0.
0'',
0
0"
0
0
0.1
w
4.0
2.5
0
0
0
0
0
0
0
0
2ov
0.47
w
13.1
43.
0
0
0
0
0
G2ov,
G
k3A-4ocs
9-0md ,
0.4
0:
,w.
-
13,1
. , 1'.
45.
1.
0
0_
7
0
661
0
0
140
0
131
F
tal ,
0.9
-
27,
, 0.
17
471
0
0
0
61
III
c) APD excursion
-17
-8
Env9lope loss/gain
Ill
3191
187
1401
123
12
a)
infiltration
4
1
0
0
b)
Room ventilation
0
0
0
0
13
,,III
Intel) al gains: Occupants @ 230
0
0
0
0
Appliances/other
9
0
II11
SuIS� otal (lines 6 to 13)
3
290
140
123
LeA external load
0
0
0
0
Leis transfer
0
0
0
0
Redistribution
0
0
0
0
14
Su�total
3
290
140
123
15
DL�'t loads
201A
18%
74E
52
20°
18%
28
22
,6
31I
,47
Aiu�ed (�d
I { reqn)
I
I
I
71
I
I
41- wrigh tsoft RightSuiteB W.ersal 201717.0.17 R3U06570
EATransferWanual JICARLTON RD-SWAIN.rup Calc = MJ8 Front Door faces:
2018Jul-2517:13:00
Page 7
Right -A) Worksheet
Entire House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
2
3
4
5
Room na
Exposed II
Room heig�it
Room dl*zlons
Room area
toilet
10.0 ft
10.0 ft heat/cool
4.0 x 6.0 It.
24.0 ft2
library
24.0 ft
10.0 ft heat/cool
1.0 x 212.5 ft
212.5 ft2
Ty
(Construction
umber
U-value
(Stuh/ff
Or
I
HTM
(Btuh/ft2) I
Area ft2
or perimeter (ft) I
Load
(Btuh) I
Area W
or perimeter (ft) I
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
11
1tiA 4ois
10D-v
d114 2ov
A44D2ov
�C��
f "'
4�14-2ov
..
1P0
'(3A-4ocs
OD-v,
4A4 2ov :
4A4 2ov
A4 2oV
1P0
3A-4ocs
A4-2ov
4A4-2ov
16X19-0md -
22A4M
0.1
:, 0.
0.47
IDD.4
0.09'
0.1
0:4
02
0.09
02
0.1
0.
0.47
0.47
0.47
0.2
0.1
0.47
0.47
0.
0.
n
ri
" n
n .:
a
- e
a
a
s
s.
s
s
s
s
s'
5
w
w
. w
-
4:0
13.
13.1
13.1
2.5
4.0
13:1
8.1
2.
8.1
4.
13.
13.1
13.1
13.1
-8:1
4.0
13A
13.1
1.5
27.
2:5
9.
16.
18 4
2.1
2.
45.
.8:4
2.1
8,4
2
`9.
16:
16.
16.
8.4
2.
43.
45.
1,
0.
0:
0
0
0
` 0
0
0.'
0
0'
0
0
' 2..
24
. . p
0
"
0
0.
0
0
0
0
0
0
0
2
1-
' 0
0
0
0
0
0
0
0
1
0
0
0
0
2
- 0-
.. -
2T
-
0
: 0
0
0
0
0
0_
1
. 0
0
0
0
1
0
0
0
,�
.0
0
0
0
C
0
0
0
0
0
0
9
0
21
212
1
' ' 0
0
'- 0
0
0
0
0
0
0
0
0
9
0_
. - 21
2A
0
0
0
01
0
0
0
0
0
0
0
0
0
0
0
0
33
69
2
4 72
0
0
00
0
0
0
0
0
0
0
0
0
0
6
2
0
0
- . 31
0
D
W
Uj1
1-=G
1-D'1,1P0
�2C-0sw
D
D
�-G
C
F
61
c) AED excursion
-2
1
133
Envelope loss/gain
71
271
1
1 242
1144
12
a) III Infiltration
b) Room ventilation
181
0
4E
0
434
0
116
0
13
Intll mal gains: Occupants @ 230
Appliancestother
0
0
0
0
0
9
Sqtotal (lines 6 to 13)
31S
286
216
ll
Less external load
0
0
0
0
Lis transfer
0
0
0
0
Rgdistribution
0
0
0
0
14
15
S�btotal
Doct loads
200A
18%
89E
181
31E
5E
201A
181A
286
57
216
391
tal room load
101
71
3
3
2 1
I
I P�'ri d (cfn)
I
I
I 1
4
I
I 60I
3 I
wrightsoft- RightSuifec9 Lk iversal 201717.0.17 RSU06570
E:\TyansferWanualJXCARLTONRD-SWAIN.rup Calc = MJB Front Door faces:
2018Jul-251T13:00
Page 8
• I
wrigh oft"
Right-M Worksheet
Entire House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
2
3
4
5
Room nan?g
Exposed vl!all
Room height
Room di sSons
Room are'
cab
13.0 ft
10.0 it heat/cool
7.0 x. 6.0 ft
42.0 W
mstr bath
27.0 It
10.0 it heat/cool
1.0 x. 160.0 ft
160.0 ft2
Ty
III
onsfruction
umber
U-value
(BtuhlfF-°
Or
HTM I
(Stuhlft2)
Area OF)I
or perimeter (it)
Load I
(Btuh)
Area OF)I
or perimeter (it)
Load
(Btuh)
Heat
Cool
Gross
N/P/S
Heat
Cool
Gross
N/P/S
Heat
Cool
6
11
I
1 ,A flocs
1 Dv.
'2ov
Q4-2ov
/P0
IrPOsw .
13A-4ocs
;PO
:; PO ,'_
11P0
3A-flocs„
OD-v,
A4 2ov .
2oVs
W-2ov
,11P0
II1II3A-flocs
�1A4-2ov
!14M-20v
(16M1 Omd'
hh2�2gq tnl
0.1
0.
0.4
0.4
0
0.
01
0.4
0.2
0.09
0.2
0.1
0.
0.47
OA
0.2
0.1
0.47
0,4
0
0.9
n`
n
:n
n.
n
e,
a
el
e"
s
s
s
's
s
s
s
w
w
w -_
-: =
-
4.0
13.
13.1
13.1
8.1
2.5
4.0
13.1
8.1
2.
8.1
4.0
13,
13;1
13.1
13.1
., 8.1
4.
13.1
13.16
.. 1:5
27.
2.
9.
16.
16.
8.4
2.1-
2,
45.
8.4
2.1
8.4
, 2.
_ 9i
16:
1&
16.
8.41
2.5
43.
45.
.1.
0.0
0
X
0
7
., C
0
21
0
0
0
4
4
0
0
0
0
6
� -0
0'
0
' .
0
0
.
0,
21
0
0
4
.1
0
0
0
0
24(,
0
0
0
1
0
0
0
0
". 1
0
0
0
6
3
0
,. 0
1,
0
0
0
0
12
0
0
17
0
0
_0
• :
0
0
0
0
12
0
0
19
0:
.. 0
11
0
1
1
0
0
0
0
0
0
101
D
0
1
0
- --0,
1
1
0--
.' 1
2
0
0
0
0
0
0
160
0
0
0
0
0
0
2
0.,
0
413
91
0
2
7.
0
0
0
0
0
0
102
0
0
0
0
2
,_ 0
0
312
0
0
262
3
0
0
D
W
G
D
�12C-Osw
D
UD
G
F
6
III
c) A��E�� D excursion
3
19
Env2lope loss/gain
1 103
4811
1 231
149
12
a) IlInfiltration
b) Room ventilation
2
0
6
0
0
131
0
13
Intelmal gains: Occupants @ 230
IIIAppliances/other
0
0
0
0
0
0
Subtotal (lines 6 to 13)
126
280
1621
Less external load
0
0
0
0
Lei transfer
0
0
0
0
Redistribution
0
0
0
0
14
15
Subtotal
Dlkt loads
20°
18%
126
25E
54
9S
209A
18%
280
56E
1621
294
"l room load152
63
3351
1998I
II
Ai requi required (cfm)
I
I
I
I
I
W right scDft' RightSuite® Lhiversal 201717.0.17 RSU06570
E:XTransferlManual J\CARLTON RD-SWAIN.rup Calc = MJ8 Front Door faces:
2018Jul-2517:13:00
Page 9
Right-M Worksheet
Entire House
DiFrancesco Construction
Job:
Date: Jul 18, 2018
By:
1
2
3
4
5
10
Room nam,1
Exposed w�r II
Room height
Room dim�nsions
Room areal
mstr bdrm
34.0 it
10.0 It heat/cool
16.0 x 18.0 it
28B.0 ft2
Ty
I
construction
U-value
(Btuh/fP-°
Or I
HTM I
(Btuhfft)
Area (ftz) I
or perimeter (ft)
Load I
(Btuh)
Area I
or perimeter
Load
Heat
Cool
Gross
N/P/S
Heat I
Cool j
Gross I
N/P/S
Heat
Cool
Illumber
6
11
13A-4ocs
1QDN
4 f14 2ov:
4 4 god,
1„
1P0
A-flo
#4,267,
.02
j 1 PO
1C3A-flocs
�OD-v.
2ov
2ov
A4.2ov
1PO _
4A42ov
A4-2ov
pX19-0md'
toI
0:1
0.
0.4
0.4
02
0.09
0.1
'.0.4
0.09
02
0.1
-0.
0.47
0.47
0.47,•
02
0.1
0.47
0.47
0.
0.9
n`,
h••
n
n
n
e-
a
a
e,
s
s.
s
s
s
s .
s
s
w
w
w
-
4.
13.
- 13.1
13.1
8.1
2.5
4.
13.1
8.1
2.
8.1
4.
13.
:13.1
13.1
13.1
8.1
4.0
13.1
13.1
1.59..
27.
2
9.
16.
16.'
8.4.
2.1
2.
45
`8.4,
2.1
8.4
2:
9.
16.'
16.
16.
84
2.
43.
45'
1.
0.
16
-
0
. 0'
0
0
0
0
0
0'
. 0
1
D
2.
2
122,
p
0
0
0
, D
0
0
0
0.
0"
1
_ ...
2
48
,
;
0
0
0
0
- 0
0
.
,0
0
601
0
-...
94
31
0
0
0
0
p
0
0
0
0
0
0
137
92
0
.
:.. :
D
w
G
DP0
D
D
L3A-4ocs
-GG
G
F
6
c) 41) excursion
Engelope loss/gain
338
353
12
a) Ili Infiltration
b) j Room ventilation
61
0
1
0
13
Int �jgains: Occupants @ 230
IrAppliances/other
2
0
Su"l total (lines 6 to 13)
400W
415
Les external load
0
0
Less transfer
Redistribution
0
0
0
0
14
15
Sd6total
Duct loads
200
18%
400M
8a
415
7
T."Ll room load
91
I I
I
I A45 required (cfm)
I
I
I
2511
I
I
-Fk- wrighltsoft^ RightSuiteO Universal 201717.0.17 ISU06570
E:\TransferXManual J\CARLTON RDSWAIN.rup Calc = MJ8 Front Door faces:
2018Jul-2517.13:00
Page 10
�tsoft" Manual S Compliance Report
Entire House
DiFrancesco Construction
For: CARLTON ADAMS RD, William J Swain
Carlton Adams Rd, Fort Pierce, FI
Design Cq;onditions
Job:
Date: Jul 18, 2018
By:
Outdoo4aesign DB: 90.0°F
Sensible gain: 35611 Btuh Entering coil DB: 78.TF
Outdoorl�Iesign WB: 78.0°F
Latent gain: 11349 Btuh Entering coil WB: 64.8°F
Indoor design DB: 75.0°F
Total gain: 46959 Btuh
Indoor : ii: 50%
Estimated airflow: 1567 cfm
Manufacl urer s Performance Data at Actual Design Conditions
EquipmInt type: Split AC
Manufacturer: Trane
Model: 4TTV8048A1+TAM9AOC48V41
Actual "irflow: 1567 cfm
Sensible capacity: 35250 Btuh
99% of load
Latent capacity: 11750 Btuh
104% of load
Total capacity: 47000 Btuh
100% of load SHR: 75%
Design �IConditions
Outdod,�i- design DB: 42.0°F Heat loss: 38735 Btuh Entering coil DB: 69.5°F
Indoor6sian DB: 70.0°F
Meets
turer's Performance Data at Actual Design Conditions
rent type: Elec strip
cturer: Model:
jairflow: 672 cfm
capacity: 10.8 kW 95% of load
re all requirements of ACCA Manual S.
Temp. rise: 50 °F
wregnrsorn- RightSuite@ thiversal 201717.0.17 FSU06570 Page 1
f ti+ & WransferUlAanual ACARLTON RDSWAIN.rup Calc = MJ8 Front Door faces: N
+wei9
fisott. Duct System Summary
Entire House
DiFrancesco Construction
For. CARLTON ADAMS RD, William J Swain
Carlton Adams Rd, Fort Pierce, FI
External static pressure
Pressure to °ses
Available static pressure
Supply / red m available pressure
Lowest fric p n rate
Actual air 9w
Total effecgV,' a length (TEL)
Heating
0 in H2O
0 in H2O
0 in H2O
0.000 / 0.000 in H2O
0 in/100ft
672 cfm
621 ft
Job:
Date: Jul 18, 2018
By:
Cooling
0.10 in H2O
0 in H2O
0.10 in H2O
0.076 / 0.024 in H2O
0.016 in/100ft
1567 cfm
Name
Design
(Btuh)
Htg
(cfm)
Clg
(cfm)
Design
FR
Diam
(in)
H x W
(in)
Duct
Matl
Actual
Ln (ft)
Ftg.Egv
Ln (ft)
Trunk
bath
c 628
25
32
0.077
4.0
Ox 0
VIFX
3.6
95.0
breakfast
c 3595
52
184
0.021
7.0
0x 0
VIFx
31.8
335.0
st3
cab
c 642
26
33
0.017
4.0
Ox 0
VIFx
57.6
400.0
st5
dinlentry
c 2034
54
104
0.021
6.0
0X 0
VIFX
29.1
335.0
st3
great rrn
c 1716
38
88
0.018
6.0
OX 0
VIFx
43.0
375.0
st4
great mi-A
c 1716
38
88
0.018
6.0
0X 0
VIFX
38.0
375.0
st4
guest/study'
c 1668
49
85
0.028
6.0
0x 0
VIFX
28.9
245.0
st2
kitchen
c 2608
8
133
0.022
6.0
0x 0
ShMt
21.0
330.0
st3
laundry
c 1691
42
86
0.027
6.0
ax 0
VIFX
31.0
250.0
st2
library
c 2551
60
130
0.018
6.0
ox0
VIFX
46.2
380.0
st4
mstrbath
c 1914
59
98
0.016
6.0
ax 0
VIFX
63.2
400.0
sty
mstr bednn
c 2456
42
126
0.016
6.0
Ox 0
VI Fx
51.0
415.0
st6
mstrbedrm;
c 2456
42
126
0.016
6.0
ox0
VIFX
59.0
415.0
st6
pantry
c 358
13
18
0.028
4.0
0x 0
VIFX
23.1
250.0
st2
studio
c 4080
102
209
0.058
8.0
Ox 0
VIFX
26.7
105.0
toilet
c 377
19
19
0.016
4.0
0x0
VIFx
67.5
400.0
st5
wic
c 145
3
7
0.017
4.0
Ox 0
VIFX
55.1
395.0
sty
:02
1
Name
w
I
Trunk
Type
Htg
(cfm)
Clg
(cfm)
Design
FIR
Veloc
(fpm)
Diam
(in)
H x W
(in)
Duct
Material
Trunk
st5
eak AVF
107
157
0.016
589
7.0
0 x 0
VinlFlx
st4
st2
3eak AVF
546
1326
0.016
950
16.0
0 x 0
ShtMetl
st1
st3
eak AVF
441
1136
0.016
814
16.0
0 x 0
ShtMetl
st2
st4
eak AVF
327
715
0.016
910
12.0
0 x 0
ShtMeti
st3
st6Peak
AVF
83
251
0.016
569
9.0
0 x 0
ShtMetl
st4
st1
I eak AVF
546
1326
0.016
950
16.0
0 x 0
VinlFlx
14�II rille
Htg
Clg
TEL
Design
Veloc
Diam
H x W
Stud/Joist
Duct
Name
Size (in)
(cfm)
(cfm)
(ft)
FIR
(fpm)
(in)
(in)
Opening (in)
Matl
Trunk
rb1
Ox 0
273
734
96.0
0.025
526
16.0
Ox 0
VIFx
rt1
rb4
Ox0
49
85
96.2
0.025
434
6.0
Ox 0
VIFx
rt1
rb5
Ox 0
127
241
99.2
0.024
545
9.0
Ox 0
VIFx
rt1
rb3
Ox 0
60
130
147.0
0.016
664
6.0
Ox 0
VIFx
rt2
rb2
Ox 0
1 164
376
126.0
0.018
689
10.0
0x 0
VIFx
Trunk
Htg
Clg
Design
Veloc
Diam
H x W
Duct
Name
Type
(cfm)
(cfm)
FIR
(fpm)
(in)
(in)
Material
Trunk
rt2
Peak AVF
60
130
0.016
664
6.0
0 x 0
VinlFlx
rt1
rt1
Peak AVF
509
1191
0.016
853
16.0
0 x 0
VinlFlx
mof