Loading...
HomeMy WebLinkAboutMANUFACTURED HOME INSTALLATION SPECIFICATIONS8y Manufactured Home Installation Specifications ° 1 �1r"19,'o� (Must be completed and submitted with your application) Address J Jon K Snyder 614 Nettles BLVD JENSEN BEACH, FL Name JACOBSEN 4 RoofZo c Wind Zone 3 I — No. of S ctions 2 Width 20 Length 39 Installati In Standard Used (check) Manufacturers Manual YES Permit # Year 2018 Serial # 15C-1 Site Preparation f Debris Id Organic Removal YES Page # Water D�#I inage: Natural Swale Pad YES Other Page # Load belling soil density 1500 Or assumed 1,000 psf Page # Footing ,ype: Poured in place Portable YES Page # Mainraill11 block: Size 17X22.5 rame placement ox. Page # Perimeter blocking: Size 16X16 Number Location Page # Ridge b 'am support: Number Size Location Page # Center li a blocking: Number Size Location Page # Special I pports required (fireplace, bay window) Yes No X Page # Mating 'f Units: Mating gasket FACTORY Type used FOAM Page # Fastener' : Roof Type GALV Spacing o.c. Page # Endwall Type LAG 6° Spacing 24" O.C. Page # Floors Type LAG 6° Spacin 24" O.C. Page # Anchors- Type 6,000 3,150 Page # Height 1T ^ ^' Unit (top of foundation to frame): p(� Page # Angle o straps 45 Number' Page # f frame ties 20 Spacing o.c. Page # Number', f over -roof ties (if required) Page # Number f sidewall anchors 20 Zone II Zone III Page # Number of centerline anchors 20 Number of stabilizers Page # Vents required for underpinning (1 sf/150 sf floor area): No. Page # Prepared by: Date: Revised 7/22/2014 PULL ALL I PULL ALL DIMS IMPACT MIUDOVWS 01515 FABH HERE O �7 CCOiBC9i 6iA9.E5 i1LiQrEi31 Ss l — — — 30 1/f x 60 — — — 30 1f2' X 69 4 39'4 (INCL. PORCH) - 21'-01/2' 38'-10 3/4' (PRAYE) 19'-8 1/2' (TCRET) 28'-01/4' -a I X-C (HUME) -a 18'-111/4' -.y� 24'-21/2' — — — - is 11f X 4011/1 - — — - 130 1/2' X 60 - — 1 URCI# A-- :�- N.li/I(016lam. L 1 2'-8' - FAN PREP. 28' i1 � 1 COA!81NEO r' 208 — rIN9U AROUI r i 1 '" db � �j\\ae-�HlGta OUEIMFAO5 / M iv'a�-fi v/f 6 --ti—._�. Idl I � 11 B>E®Ia- 82 - ' 1 # � r53, ` OOP 8' KCH ° 1 1 r' STA.Cl; PREP $ FAN PROI.i 30 f. 3/4 LATE Asgm�� ` 30 r, � .✓ _ . x 60° KGH- WALL. = R-11 FLOOR = (R-11 BUILD ALL WALLS 108" HIGH z I � CL 0. � kd 1 ID ° • 60' x 34' PREP.', ntH I ' h i 4 2r-a• '� BT # it / MEN �.. GO'H'GFi�T.'J.jPH. edblb' dh "L l-30 I/'^' 1 -- — • A1/a' X 60 I� — - 3s 1/2' x 60 1% I6 1/2" x 401/4'- tI�U[H Bulw nBea wAlt I • w, ea z 35' EGRESS —-P1 f 29' SM PORCH LAYOUT FOR- HFAOFliB AMO POSTS FILE T2'-6 1/2' 3y'-I -s 1/2" 34'-4' -- 39'-0' -�- .IAMBSER) HOMES CP-2�31�229 t1'-0 I/2" 4 1/2' 4'-0' t+------�- 4 1/2' cv.xgat.2eo JQ — 412' 3 15'-61/2' 20-61/2' 23'-10' 34'-U' (1167) QC 10-17-2017 (20'-0') ® (291/2•) (311/2•) B'-D' -►i OUILU BOTH WALLS IOW HIGH �) I 18'-1' 7START6'L AT 3S'-6' - (60') n. LO/ARCZ / C. YOUNG Sg'_0' �j 21'-21/2' I �^ ' OLIVER TECHNOLOGIES, INC. FLORIDA INSTALLATION INSTRUCTIONS FOR THE ODEL 1101 "V" SERIES ALL STEEL FOUNDATION SYSTEM MODEL 1101"V" (STEPS 1-15) LONGITUDINAL ONLY: FOLLOW STEPS 1-9 FOR ADDING LATERAL ARM: Follow Steps 10-15 FOR CONCRETE APPLICATIONS: Follow Steps 16-19 STAMP page I revision 6/07 ENGINEERS STAMP 1. SPECI �L CIRCUMSTANCES: If the following conditions occur- STOP! Contact Oliver Technologies at 1-800-284-7437 : a) Pier � eight exceeds 48" b) Length of home exceeds 76' c) Roof eaves exceed 16" d) Sidewall height exceed 96" e) Loca on is within.1500 feet of coast INSTALLATION OF GROUND PAN 2. Removeit weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) . 3. Place g pand pan (C) directly below chassis I-beam . Press or drive pan firmly into soil until flush with or below soil. SPECI NOTE: The longitudinal W" brace system serves as a pier under the home and should be loaded as any other PiE It is recommended that after leveling piers, and one-third inch (1/3") before home is lowered completely on to piers„ omplete steps 4 through 9 below then remove jacks. INSTALLATION OF LONGITUDINAL'Y' BRACE SYSTEM NOTE: I I HEN INSTALLING THE LONGITUDINAL SYSTEM ONLY, A MINIMUM OF 2 SYSTEMS PER FLOOR SECTION IS REQUIRED. SOIL TEST PROBES � )ULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION. IF PROBE TEST READINGS ARE BETWEEN 175 & 21 5 A 5 FOOT ANCHOR MUST BE USED. IF PROBE TEST READINGS ARE BETWEEN 276 8-350 A 4 FOOT ANCHOR MAY BE USED. USE GROUND NCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4" . VERTICAL TIES ARE ALSO REQUIRED ON HOMES SUPPLIED WITH VERTICAL TIE CONNECTION POINTS (PER FLORIDA REG.). 4. Select t e correct square tube brace (E) length for set - up (pier) height at support location. (The 18" tube is always used a 5 the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a 40 to 4§ degree angle is maintained. PIE .. HEIGHT 1.25" ADJUSTABLE 1.50" ADJUSTABLE (Approx.; 1' 5 degrees Max.) Tube Lengthy Tube Length A t 3/4" 2 3/4" to 32 1 /4" 32" 18" 18 = 44', " 40" to 48" 54' 18" 5. Install 2) of the 1.50" square tubes (E (18" tube) ) into the "U" bracket (J), insert carriage bolt and leave nut loose for final adjust r ient. 6. Place beam connector (F) loosely on the bottom flange of the I-beam. 7. Slide t, a selected 1.25" tube (E) into a 1.50" tube (E) and attach to I-beam connectors (F) and fasten loosely with bolt and nut. 8. Repe steps 6 through 7 to create the W" pattern of the square tubes loosely in place. The angle is not to exceed 45 degree, and not below 40 degrees. 9. After al bolts are tightened, secure 1.25" and 1.50" tubes using four(4) 1/4"-14 x 3/4" self -tapping screws in pre -drilled holes. INSTALLATION OF LATERAL TELESCOPING TRANSVERSE ARM SYSTEM THE MC DEL 1101 'N" (LONGITUDINAL & LATERAL PROTECTION) ELIMINATES THE NEED FOR MOST STABILIZER PLATES & FRAME TIES. NOTE: THE USE OF THIS SYSTEM- REQUIRES VERTICAL TIES SPACED AT 5'4". FOUR FOOT (4') GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. 10. Install remaining vertical tie -down straps and 4' ground anchors per home manufacturer's instructions. NOTE: Centerline anchor to be sized according to soil torque condition. Any manufacturer's specifications for sidewall anchor loads in excess of 4,000 1 s. require a 5' anchor per Florida Code. 11. NOTE: ach system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location. This frame tie & stabili er plate needs to be located within 18" from of center ground pan. 12. Select the correct square tube brace (H) length for set-up lateral transverse at support location. The lengths come in either 60" or 72" angths. (With the 1.50" tube as the bottom tube, and the 1.25" tube as the inserted tube.) 13. Install he 1.50 transverse brace (H) to the ground pan connector (D) with bolt and nut. 14. Slide 25" transverse brace into the 1.50" brace and attach to adjacent I-beam connector ( I ) with bolt and nut. 1.r, SPrur 1 5n,, tr}InRVPrRP arm to 1 96" trancvPrca arm iminn four (4) 114" - 14 x 3/4" calf-tgnninn crrPwc in nra-rlrillari hnlac 0 OLIVER TECHNOLOGIES, INC. Telephone: 931 796 4555 1-800-284-7437 Fax: 931 796 8811 02/02/ Co Py www.olivertechnologies.com BILE page 3 INSTALLATION USING CONCRETE RUNNER / FOOTER revision 6/07 16. A conc ete runner, footer or slab may be used in place of the steel ground pan. a) The�concrete shall be minimum 2500 psi mix b) A c�l ncrete runner may be either longitudinal or transverse, and must be a minimum of &' deep with a minimum width of 16 inches lone tudinally or 18 inches transverse to allow proper distance between the concrete bolt and the edge of the concrete (see below). c) Foo�ers must have minimum surface area of 441 sq. in. (i.e. 21" square), and must be a minimum of 8" deep. d) If a full slab is used, the depth must be a 4" minimum at system bracket location, all other specifications must be per local jurisdiction. Spaqcial inspection of the system bracket installation is not required.. Footers must allow for at least 4" from the concrete bolt to the edge of tl"Ie concrete. NOTE: The bottom of all footings, pads, slabs and runners must be per local jurisdiction. LONGITUDINAL: (Model 1101 LC 'IV")17. When �sing Part # 1101-W CPCA (wetsetl, simply install the bracket in runner/footer OR When installing in cured concrete use Part # 101-D ..CPCA (dryset). The 1101 (dryset) CA bracket is attached to the concrete using (2) 5/8"xX concrete wedge bolts (Simpson part # S162300H 5/8" X 3" or Powers equivalent). Place the CA bracket in desired location. Mark bolt hole locations, then using a 5/8" diameter mason �ry1 bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is blown out of the holes. Place wedge bolts into drilled holes, then place 1101 (dry set) CA bracket onto wedge bolts and start wedge bolt nuts. Take a hammer and lightly drive the wedge bolts down b hitting the nut (making sure not to hit the top of threads on bolt). The sleeve of concrete wedge bolt needs to be at or below the top of conc `ete. Complete by tightening nuts. LATERAL: Model 1101 TC 'IV")113. For we set (part # 1101-W-TACA) installation simply install the anchor bolt into runner/footer. For dry set installation (part # 1101-D-TACA) mark It hole locations, then using a 5/8" diam. masonry bit, drill a hole to a minimum depth of 3". Make sure all dust and concrete is blown Pt of the hole. Place wedge bolts (Simpson part #S162300H 5/8" X 3" or Powers equivalent) into (D) concrete dry transverse connec or and into drilled hole. If needed, take a hammer and lightly drive the wedge bolts down by hitting the nut (making sure not to hit the top of threads on bolt), then remove the nut. The sleeve of concrete wedge bolt needs to be at or below the top of concrete. 19. When using part # 1101 CVW (wetset) or 1101 CVD (dryset), install per steps 17 & 18. Notes: 1. LENGTH OF HOUSE IS THE ACTUAL BOX SIZE 2. • = STABILIZERPLATEAND FRAMETIE LOCATION (needsb be l caW Wfin 18 ¢rd-m of oenlerofg wind pan oroorlcreb) 3. C� LOCATION OF LONGITUDINAL BRACING ONLY 4.-= TRANSVERSE & LONGITUDINAL LOCAl10NS --I�i EI�I� INS EI:'9!7 1 ALL WIDTHS; AN 11 r, LENGTHS UP TO 52' • • 1 • • LJ ALL WIDTHS; AND LENGTHS OVER 52' TO 80' • • • r7 lJ • • HO ES WITH"5/12 -ROOF PITCH REQUIRE PER FLpRIDA REG:ULATI`ONS. 6 y terns for home lengths up �to 52 and 8 systems for .horn r 52' -d u 0' 'One stabilizer plate ;'�ai e tie cequlred at each -lateral bracing system ,� L . � PY j 61 concrete part # 11 Wet br 1101 V shown may Of be used in all xot ! _ ;epf where iacturers specl sldewall straps � II` ? s of 4,000 lbs. ,l . Transverse arm 1 beam ; ons requlre a 5' connector Florida Code: J j �H Tran verse:aft i ,f• r bottom (1:5" T D Ground \ Pan- transverse / `connectors. E 'V' Brace Tub Top.(1.251 Bottom (1,5") y� T Ground,Pah e. dry racket I p-CPCA A part # MCA not F "V' brace I beam connectors \Y/ J ground Pan V Bracket rage 3 revision 07 C = GROUND PAN D = GROUND PAN CONNECTOR U BRACKETS TRANSVERSE E = TELESCOPING V BRACE TUBE ASSEMBLY W/ 1.5 BOT TOM TUBE AND 1.25 TUBE INSERT F = "V" ,BRACE ]-BEAM CONNEC- TORS ASSEMBLY H = TELESCOPING TRANSVERSE ARM ASSEMBLY I = TRANSVERSEARM I -BEAM CONNECTOR J= V PAN BRACKET Model # 1101 "W ,-Beam Flat clamp Alternate Hole for (1) Per Assembly Narrower Beam Flange 'Cc Grade 5.1/2" x 1" a Carriage Bolt & Nut Grade CarriagiiBoll &'Nut I.BEA J';CONNECTOR BRACKET 4' ground- used in all where home >ecifioationsIs Ibis. rI Transverse arm I beam f a 5" anchor. connector ('H Transverse arm Top (1.25") bottom (1 _5* u �onaete .� F :"V" brace I beam u bracket connectors transverse connectors 1p J Concrete / / "V" Bracket E WV" BiaceTub Top (1.25") Bottom .(1.5") •': Model 1101 CVD- Model 1101 CVW not, shown :C = CONCRETE FOOTER/RUNNER --... D = CONCRETE U BRACKET TRANSVERSE �` CONNECTOR (connects with` grade 5 '1 r2"x 2 & 1/2- carriage bolt nut) E =TELESCOPING V BRACE TUBE. ASSEMBLY W/.1.5:BOT TOM TUBE AND 1.25 TUBE INSERT F = '`V" BRACE 1-BEAM CONNECTOR ASSEMBLY (connects with grade 5 - 1/2" x 4" carriage bolt & nut). H =TELESCOPING TRANSVERSE ARM ASSEMBLY I = TRANSVERSE ARM 1-BEAM CONNECTOR (connects with grade 5 -1-IT x 21 /2— carriage bolt & nut) J= CONCRETE "V" BRACKET (connects with grade 5 -1/2" x 4" carriage bolt & nut) concrete. Footer9 Runner Model # 1101 C " V" OLIVER TECHNOLOGIES, INC. -7437 02/02/2018 FI LE COPT Telephone: 931 796 4555 Fax: 931 796 8811 www.olivertechnologies.com