Field Density Tests of Compacted Soils Method D-6938
Project: Proposed Residence
Lot 53, Creekside
Date: February 22, 201919DR193
AddressI� 8724 Cobblestone Drive,
Building Pad
Fort Pierce, FL
Order #:
Permit #: Ad %^ d 71�
Area Tested:
Material] Type: Pale Gray Sand
Tech: BK
Client: D.R. Horton, Inc. 95%
Addres �: 1430 Culver Drive NE Compaction Req.:
Proctor Method: ASTM D-1557
rau n va ,
Proctor
Value
PCF
Optimum
Moisture
%
Compaction
Pass
Test
#
TEST LOCATION
Probe
Depth
Elev.
Moist
%
Dry
Density
PCF
C�llnter of Building Pad
NE I Corner of Bui I Iding Pad
SI, Corner of Building Pad
12"
12",
12"
FL
FL
FL
6.1
7.3
7.9
101.7
100.9
100.6
104.8
104.8
104.8
12.0
.12.0
12.0.
97.0%
96.3%
96.0% '
Yes
Yes
Yes
1
2
3
4
5
6
...
7
9
10
I
11
12
13 I
I
14
Rem ks: See Reverse Side (Page 2 of 2) for Additional Information for Disclaimer
I� This is a Compaction Test only on the top 12" of the pad and is not a verification of Soil Beari g. Capacity.
Legen' for Elevation:
PR = oofroll 1,2,3 = 1st, 2nd, 3rd Lift Submitted by:
SL = S I ringline FL = Final Lift Keith LeBlanc, P.E.
Federal Engineering & Testinc,�, inc.:
•i�7 = Iu DC�rClutl OV - Vcwrr v�uuv � ,- -
BC = asecourse BOF = Bottom of Footing Florida Reg. Ivo.,59394 r
TOP �op of Pipe FG = Finished Grade Certificate of Authorization #54i1
As a m al protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and auth"ocization far. publication,of st2tern6hts,
conclusi ins or extracts from or regarding our reports is reserved pending our written approval. A density test determines the degree of cpmpactlon of tli� fester7.layer ar=rrlateria'
only. A , ensity does not replace a soil bearing capacity determination. These density tests do not certify the underlying soil materials below tree proposed sVuoh��ES The results
do not p pclude or guarantee that future settlement and cracking will not occur. A soil boring test is required to certify that the underlying sok,wiil sa�pj.)n-tnE,proposetl structure
without i!rttlement. If no soil borings have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate uJse suit ilif� oflthe underlying
soil to st ipport the proposed structure. After laying dormant for a period of 90 days or after heavy rain/storms, retesting must be performed on this work. e
PAGE 1 of 2
i
Compacted Soils Method D-6938 Disclaimer
Pursuant to your request, Federal Engineering & Testing, Inc. (FET) has performed a compaction test at the referenced
project on the reverse side. The purpose of our test was to determine the degree of compaction of the tested layer of
material only. In no way shall a compaction test replace a soil bearing capacity determination. A soil boring test must be
performed by the client prior to construction to verify subsoil conditions. Our scope of services only included testing the -top
12" of added fill material. FET was not contracted to perform supervision of the building pad preparation. This testing of,the
added fill material does not include an analysis of the underlying soil materials to determine if they are capable of supporting
the proposed structure without settlement. This density compaction test does not warranty any underlying soil materials or
conditions below the tested top 12 inches of material. If no soil borings have been performed in the location of the proposed
structure, we recommend performing soil borings below all foundation areas of the proposed structure to verify the underlying'
soil conditions.
Environmental analysis of the soil materials is not part of the scope of services. If environmental analysis of the soils is
required, we can provide a proposal for performing an environmental analysis of the soil materials. The scope of services is
for determination of the degree of compaction of the tested layer of material only. No other analysis is implied or warranted.
Job project specifications were not available at the time the work was performed. Determination of the pass/fail compaction
results are based on current common industry requirements of 95% of the ASTM D-1557 standard for building foundations
and 98% of the AASHTO T-180 standard for paved areas such as roadways and parking lots. If different specifications are
required, Federal Engineering & Testing, Inc. shall be notified.
Our findings are relative to the date and areas of our site work and should not be relied upon to represent conditions on
areas or dates. Any subsequent site disturbances due to water erosion, rain waters, construction activities, excava
overgrown, vegetation, traffic and other disturbances will void this test and the site must be re -compacted and re -tested
to construction.
As a mutual protection to clients, the public and ourselves, all reports are submitted are the confidential property of cli
el
and authorization for use, publication of statements, conclusions or extracts from or regarding our reports is resen
pending written approval.
It has been a pleasure working with you and we look forward to doing so in the near future.
Page 2 of 2
ederal
gineering
eating, Inc.
/� �R7 /7.
� RECEIVED
FEB 2 5 2018 FIL.EE.C
PhPermittin pe artment78759 P�eng.com
St. Lucie County adman@fed
www.fed•ong.com
Field Density Tests of Compacted Soils Method D:-6938
Proposed Residence Lot 53,,Creekside Date: February 22,.2019
8724 Cobblestone.Drive, Fort.Pierce, FL Order #: 19DR193
d: Buildin Pad Permit #:... '�
pe: Pale Gray Sand: Tech: BK _r
D.R. Horton, Inc.
1430:Culver Drive NE
B FL 32907
Compaction Req.: 95%
Proctor Method: ASTM D-1557
r-cill11 ay,
Proctor
Value
PCF
-Optimum
Moisture
%
Compaction
Pass
Test
#
TEST LOCATION
Probe:
Depth: p
Elev.
Moist
%
Dry '
Density
PCF
1 10e,'ln��ter
of Building Pad
.12"
FL, =
6.1
101.7
104.8
1.2.0
97.00/6 ::
Yes
2 1
NEI
Corner of Building Pad
12"
FL -
_ 7.3 1
100.9
1048t
12:0
96.3%
Yes
3 IS
Corner of Building Pad
12"
F.L
7.9
100:6
104.8:::
12.0 ..
96.0%
Yes .
4
�
5
6
7
it
8
9
I
10
11
i
�
12
13
i
14
Rama'
kc• sap RAvprsp side IPaoe 2 of 21 for. Additional
Information for Disclaimer .���`_� ,•�;. �7. ; �i �: -
This is a Compaction Test only on the top 12" of the pad and Is not a verification of S dg apacl "-x
Legent or Elevation: '' N0.
PR = P oofroll 1,2,3 = 1st, 2nd; 3rd Lift Submitted by:, `
SL = S , ringline FL = Final Lift Keith LeBlanc, P:. ^U STATE 2 t ;�
SG = „iibgrade BG = Below Grade Federal Engineeri'r psting; Inc 4; Z
BC = ',asecourse BOF = Bottom of Footing. Florida Reg. No. 5d5s'�;r<ORIp;%���� NN°'
TOP iI op of Pipe FG = Finished Grade Certificate of Authorizat)§{7' �t0`
Asa m dual protection to clients; the public and ourselves, all reports are submitted as the confidential property of clients, and aulhorizellort fb pl ill�i"r
*@moms,
conclusins or extracts from orregerding our reports is reserved pending our written approval.A density test determines the degree of compaction of f Mi✓� of material
only. A ensity does not replace a soil bearing capacity determination. These density tests do' not certlry the underlying soil materials below the proposed structure. The results
do not p -' elude or guarantee that future settlement and cracking will not occur. A soil boring test is required to.certify that the underlying soils will support the proposed structure
without ettlement, If, no soil borings - have been performed to verify the underlying soils, we recommend that soil borings be performed to evaluate the suitability of the underlying
soil to s pport the proposed structure. After laying dormant for a period of 90'days or after heavy rainstorms, retesting must be performed on this work.
PAGE 1: of 2