Loading...
HomeMy WebLinkAbout30 DAY TEMPORARY POWER RELEASEn ,B) CAN ED Pla�lno41(06144 opment Services Building gt Coyle Regulation DIASIon 2300 Virginia Aire Fort Pierce, FL 34982 772-462-2165 Fax 772-462-6443 Request for 30-Day Temporary POvvelr Release Date: �Aoq�I ` Permit Number: Ov 7 07d-( Project Address: ?712, sl PROPERTY, FOR A PERIOD NOT TO EXCEED THIRTY (30) THE UNDERSIGNED HEREBY REQUEST RELEASE OF ELECTRICAL POWER TO THE ABOVE DESCRIBED DAYS, FOR THE PURPOSE OF TESTING SYSTEMS AND EQUIPMENT IN PREPARATION FOR A FINAL INSPECTION. IN CONSIDERATION OF APPROVAL OF THE REQUEST WE HEREBY ACKNOWLEDGE AND AGREE AS FOLLOWS: I. This temporary power release is requested for the above stated purpose only, and there will be no occupancy of any type, other than that permitted by construction during this time period. 2. As witness by our signatures, we hereby agree to abide by all terms and conditions of this agreement, including Building Division Policy, which is Incorporated herein by reference. 3. All conditions and requirements listed in the attached document entitled "Requirements for 30 Day Power for Testing" have been fulfilled and the premise is ready for compliance inspection. 4. All requests for an extension beyond 30 days must be made in writing to the Building Official stating the reason for the request. Power may be removed from the site and/or a Stop Work Order issued if the Final Inspection has not been approved within 30 days. A fee of $100.00 will be required to lift the Stop Work Order. VE HEREBY RELEASE AND AGREE TO HOLD HARMLESS, NTY, AND THEIR EMPLOYEES FROM ST. LUCIE COU iLL LIABILITIES AND CLAIMS OF ANY TYPE OF NATURE WHICH MAY ARISE NOW OR IN THE FUTURE OUT )F THIS TRANSACTION, INCLUDING ANY DAMAGE WHICH MAY BE INCURRED DUE TO THE )ISCONNECTION OF ELECTRICAL POWER IN THE EVENT" OF VIOLATION OF THIS AGREEMENT. SIGNATURE CONTRACTOR SIGNATURE DATE DATE DATE FEB 12 2019 Permitting Department St• Lucie County, FL